HomeMy WebLinkAbout310095_Plan of Action_20181026l0- z6-4� 31Fq�5 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES I Facility Number: -Facility Name: 31-95 P-2333(1-3,10-13) Certified Operator Name: Randall N. Barefoot County: Duplin Operator Number: 17796 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: (1-3) . (10-13) Spillway(Y or N): N N Level(inches): 13 14 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/24/18 Weather permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and'to the best of my knowledge and ability, the information is accurate and correct. Prestage Farms Inc. Phone: 910-592-5771 Facility Owner/Manager (print) - law Date: 10/25/2018 Facility Owner/Manage(signature) 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier(ID): 1-3) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 13.0 inches b. designed 25 yr./24 hr, storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 6.0 inches top of dike surface area according to design d. (area at below structural freeboard elevation) 48814 fe e. line c/12 x line d x 7.48 gallons/ft3 182564 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 61320 ft3 h. current herd # 1860 certified herd # 1860 actual waste produced = current herd # x line g = 61320 ft3 certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 28475 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 111944 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/24/2018 0.53 ibs/1000 gal. m., ((lines e + k)/1000) x line 1 = 156 lbs. PAN REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 r PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): (10-13) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 14.0 inches 19.0 inches 5.0 inches 53941 ft2 168116 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 35430 ft3 h. current herd # 2480 certified herd # 2480 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/24/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 35430 f t' �0 ft3 31466 ft3 83397 gallons 0.55 Ibs/1000 gal. 138.3 Ibs. PAN 1w Il. TOTAL POUNDS OF PAN, STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: (1-3) line m = 156.1 lb PAN 2. Structure ID: (10-13) line m = 138.3 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines +2+3+4+5+6= 294.4lbPAN 111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNfIT RR ADDI IFn nl IDIAIr TWIQ an nnv Doninn o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 4202 1A Bermuda 3.91 177.00 692.1 Mar -Oct v. Total PAN available for all fields (sum of r_nl imn tl - Foo 1 ih Deu IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 294.4 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 692.1 lb. PAN y. Overall PAN balance (w - x) _ -397.6 lb. PAN Line y must show as a deficit. if line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information_ If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Called in to DWR on 9/19118.