Loading...
HomeMy WebLinkAbout310392_Plan of Action_20181004Oi�.03SC�� LO 44- 31-W- PLAN OF ACTION (P®A) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: ` _3I - ��a County: Ode !n Facility Name:___ 'S�eVe SmI4-A Farm Certified Operator Name: SevejMIA Operator # f 1A 78 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid. level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/Identifier (ID): Spillway (Yes or No) Level (inches): Structure 1' Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Ss.2 No =2 C.hepk_all_applicaUp_it - -- l�_--T ------ - Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste.is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact -and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation �- if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and- included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Sfe F�,j (frgrf) Facility Owner/Manager (print) cility Owner1Ma`Ka6er (signature) PoA Cover Page 2121loO Phone: Otso�-�S-O-01 p Date: 7-2F,,00tP PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 199132 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 12.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 1-9.5-1 inches c. line b - line a (inches in red zone) = 7.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 70000 fe e. line=c/1-2=xdine-d-x=7 48-gallons/ftL — --- ,. 3272507gallons 3-. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 71211 fe h. current herd # 21001 certified herd # 2160 actual waste produced = current herd # x line g = 69233 W certified herd # I. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period. I. current waste analysis dated 9/24/2018 m. ((lines e + k)/1000) x line 1= REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2121/00 0 fe 40833.3 fe 137216 gallons 0.83 1 lbs/1000 gal. 385.5 lbs. PAN ' S-51 1: structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. lines '1+2+.3+4+5+6 m line m = 3 �s . lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN 38S S lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NnT RP APPI IPQ nt 1P1K1r. TUIQ 'zn rnnv DI=Dinn o. tract # - p. field # q. crop r. acres s. remaining IRR-2 PAN balance Iblacre) - t. TOTAL PAN BALANCE FOR FIELD =column-r- u. application window' -- Y630 Coast 7 97-6 533.93 %30 T 1 9: JA 370. ) y630. P3 C Oq,3 U-40- aoy.3 Y630 P Coas ( a.57 rl�,gl 179-97 •Jtdte current crop enoing applicauon aate or next crop application beginning date for available receiving crops during 30 day drawn down period 13n8. v. Total PAN available for all fields (sum of•column t) d � LIs lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 ,Day) 2121100 2 w. Total PAN to be land applied (line n from section 11) 3g�'S Ib. PAN x. Crop's remaining PAN balance (fine v from section III) m 11,308. Y8 lb. PAN y. ®verall.PAN balance (w e x) o 9oU.9Y lb. PAN Line y must show as a deficit. if line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. for pump & haul and herd reduction options; recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table.and recalculate the overall PAN balance. if animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: l PoA (30 Day) 2121100 3 NCDA&CS Agronomic Division Phone: (919) 733-2655 1Neb'site: www.ncagr.gov/agronomi/ Report No. FY19-W001017 Predictive Client Steve Smith ! Advisor. o4�c"°uLror��o 142 Woodland Church Rd Waste Albertson, NC 28608 Report Duplin County bue°eo. Links to Helpful Information Sampled: 08/14/2018 Received: 08/16/2018 Farm: 99132 Completed: 08/22/2018 PALS #: 404236 ; I PALS #: Sample Information Nutrient Measurements are given in units of parts per million (ppm), unless utherwise specifed. Other Results ID: 99132 Nitrogen n (N) I P K Ca Mg S Fe Mri I. Zn Cu B Mo I C Al Na CI Code: ALS Total N: I 27.8 551 45.6 - 43.8 37.9 1.73 0.24 '. 0.42 0.60 0.48 - I - 0.24 133 - Description: Swine Total Keldahl N: 199 :• LagoonLiq, Inorganic: - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - Grower Comments: NH4-N I SS EC pH BD CCE ALE C:N DM Not Provided Nos-N I (I e S/cm) (mS/cm) (Unitless) (lb/yd') (%) (1000 gal) (Unitless) (°!o) - - 7.95 - - - - - Estimate of Nutrients Available for First Year (Ib/100.0 gal) Other Results (lb/1000 gal) Application Method: N P205 K20 Ca Mg S Fe Mn i Zn Cu B Mo I Al Na CI Irrigation I 0.83 0.53 5.51 0.38 0.37 0.32 0.01 T• T 0.01 T - I T 1,11 - Sample Information Nutrient Measurements are given in units of parts per million (ppm), unless utherwise Nitrogen (N) I P K Ca Mg S Fe Mrs ;; Zn specifed, Cu B Other Results Mo I C AI Na CI 1D: 99080 code: ALS Total N: I 36.2 424 55.5. 43.8 22.9 4.41 0.36 : 0.85 0.83 0.43 - I - 1.67 114 - Description: Swine Total Kjeldahl N: 295 -...._----_ LagoonLiq• Inorganic: --.----------------- Grower Comments: NH4-N S EC pH BD C. C ALE C:N DM Not Provided NO3-N s I (10 S/cm) (mS/cm) (Unitless) (lb/yd') (% (1000 gal) (Unitless) (%) I - - 7.60 - - - - - Estimate of Nutrients Available for First Year (lb/100, gal) Other Results (lb/1000 gal) Application Method: I N P205 K20 Ca • Mg S Fe W Zn Cu B Mo I Al Na CI Irrigation I 1.23 0.69 4.25 0.46 0,37 0.19 0.04 T 0.01 0.01 T - 0.01 0.95 - North Carolina -A Tobacco Trust Fund Commisslon Reprogramming.of the laboratory -information -management system that makes this report possible is being funded \ through a grant from the North Carolina Tobacco Trust Fund Commission. Thank you for using agronomic services to manage nutrients and safeguard environmental quality. - Steve Troxler, Commissioner ofAgriculture.