HomeMy WebLinkAbout310392_Plan of Action_20181004Oi�.03SC�� LO 44- 31-W-
PLAN OF ACTION (P®A) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: ` _3I - ��a County:
Ode !n
Facility Name:___ 'S�eVe SmI4-A Farm
Certified Operator Name: SevejMIA
Operator # f 1A 78
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid. level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/Identifier (ID):
Spillway (Yes or No)
Level (inches):
Structure 1' Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Ss.2
No
=2 C.hepk_all_applicaUp_it - -- l�_--T ------ -
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste.is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact -and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
�- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that I have reviewed the information listed above and- included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Sfe F�,j (frgrf)
Facility Owner/Manager (print)
cility Owner1Ma`Ka6er (signature)
PoA Cover Page 2121loO
Phone: Otso�-�S-O-01 p
Date: 7-2F,,00tP
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 199132
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 12.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 1-9.5-1 inches
c. line b - line a (inches in red zone) = 7.5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 70000 fe
e. line=c/1-2=xdine-d-x=7 48-gallons/ftL — --- ,. 3272507gallons
3-. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 71211 fe
h. current herd # 21001 certified herd # 2160
actual waste produced = current herd # x line g = 69233 W
certified herd #
I. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period.
I. current waste analysis dated 9/24/2018
m. ((lines e + k)/1000) x line 1=
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121/00
0 fe
40833.3 fe
137216 gallons
0.83 1 lbs/1000 gal.
385.5 lbs. PAN
'
S-51
1:
structure ID:
2.
structure ID:
3.
structure ID:
4.
structure ID:
5.
structure ID:
6.
structure ID:
n.
lines '1+2+.3+4+5+6 m
line m = 3 �s .
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
line m =
lb PAN
38S S
lb PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NnT RP APPI IPQ nt 1P1K1r. TUIQ 'zn rnnv DI=Dinn
o. tract #
-
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
Iblacre)
-
t. TOTAL PAN
BALANCE
FOR FIELD
=column-r-
u.
application
window'
--
Y630
Coast
7
97-6
533.93
%30
T 1
9: JA
370. )
y630.
P3
C
Oq,3
U-40-
aoy.3
Y630
P
Coas (
a.57
rl�,gl
179-97
•Jtdte current crop enoing applicauon aate or next crop application beginning date for available receiving
crops during 30 day drawn down period
13n8.
v. Total PAN available for all fields (sum of•column t) d � LIs lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
PoA (30 ,Day) 2121100 2
w. Total PAN to be land applied (line n from section 11) 3g�'S Ib. PAN
x. Crop's remaining PAN balance (fine v from section III) m 11,308. Y8 lb. PAN
y. ®verall.PAN balance (w e x) o 9oU.9Y lb. PAN
Line y must show as a deficit. if line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. for pump & haul and herd
reduction options; recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table.and
recalculate the overall PAN balance. if animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
l
PoA (30 Day) 2121100 3
NCDA&CS Agronomic Division
Phone: (919) 733-2655 1Neb'site: www.ncagr.gov/agronomi/
Report No. FY19-W001017
Predictive
Client Steve Smith !
Advisor.
o4�c"°uLror��o
142 Woodland Church Rd
Waste
Albertson, NC 28608
Report Duplin County
bue°eo. Links
to Helpful
Information Sampled: 08/14/2018
Received: 08/16/2018
Farm: 99132
Completed: 08/22/2018 PALS #: 404236 ; I
PALS #:
Sample Information
Nutrient Measurements are given in units of parts per million (ppm), unless utherwise
specifed.
Other Results
ID: 99132
Nitrogen n (N) I P K Ca Mg S Fe Mri I. Zn
Cu B
Mo I C Al Na CI
Code: ALS
Total N:
I 27.8 551 45.6 - 43.8 37.9 1.73 0.24 '. 0.42
0.60 0.48
- I - 0.24 133 -
Description: Swine
Total Keldahl N: 199 :•
LagoonLiq,
Inorganic:
- - - - - - - - - - - - - - - -- - -
- - - -
- - - - - - - - - - -
Grower Comments:
NH4-N
I SS EC pH BD CCE
ALE
C:N DM
Not Provided
Nos-N
I (I e S/cm) (mS/cm) (Unitless) (lb/yd') (%)
(1000 gal)
(Unitless) (°!o)
- - 7.95 - -
-
- -
Estimate of Nutrients Available for First Year (Ib/100.0 gal)
Other Results (lb/1000 gal)
Application Method:
N P205 K20 Ca Mg S Fe Mn i Zn
Cu B
Mo I Al Na CI
Irrigation
I
0.83 0.53 5.51 0.38 0.37 0.32 0.01 T• T
0.01 T
- I T 1,11 -
Sample Information
Nutrient Measurements are given in units of parts per million (ppm), unless utherwise
Nitrogen (N) I P K Ca Mg S Fe Mrs ;; Zn
specifed,
Cu B
Other Results
Mo I C AI Na CI
1D: 99080
code: ALS
Total N:
I 36.2 424 55.5. 43.8 22.9 4.41 0.36 : 0.85
0.83 0.43
- I - 1.67 114 -
Description: Swine
Total Kjeldahl
N: 295
-...._----_
LagoonLiq•
Inorganic:
--.-----------------
Grower Comments:
NH4-N
S EC pH BD C. C
ALE
C:N DM
Not Provided
NO3-N
s
I (10 S/cm) (mS/cm) (Unitless) (lb/yd') (%
(1000 gal)
(Unitless) (%)
I - - 7.60 - -
-
- -
Estimate of Nutrients Available for First Year (lb/100,
gal)
Other Results (lb/1000 gal)
Application Method: I
N P205 K20 Ca • Mg S Fe W
Zn
Cu B
Mo I Al Na CI
Irrigation I
1.23 0.69 4.25 0.46 0,37 0.19 0.04 T
0.01
0.01 T
- 0.01 0.95 -
North Carolina
-A
Tobacco Trust Fund Commisslon
Reprogramming.of the laboratory -information -management system that makes this report possible is being funded \
through a grant from the North Carolina Tobacco Trust Fund Commission.
Thank you for using agronomic services to manage nutrients and safeguard environmental quality.
- Steve Troxler, Commissioner ofAgriculture.