HomeMy WebLinkAbout310245_Plan of Action_20180922PLAN OF ACTION (POA) FOR HIGH
3 1 - 02- 4L 51"
FREEBOARD AT ANIMAL FACILITIES
Facility Number: t�� - ^1� County: in
EacAi Nay e::
Certified Operator Name:'-, Lmix tnve d Aim Operator # I
1. b�tmnt ti trill -ievei s- in inches :�s bsured -ffom the: tct-uent -i' .level in the -la
q . _- gootro the
lowest point on -the tap =of "the -dam -for-lagoons �iiitl 66t spillV�ayw �and�Irorri'the -durrenfligwd'levei
in.the lagoon to the bottom of the spillway -for lagoons with spillways. "
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Namelldentifier (ID):
SpiNway (lies or, N6j:-
Level (inchesy: i �• _ - -
2. Check all applicable items
Liquid -level is within' the designed structural freeboard elevations of one or more structures_ . Five
and 30 i ay'Plans oTAc`tion,are attached.-.`t-iyiiraulic:and:agronomicbalances .are Wthin_.
acceptable ranges.
Z'Ligiiid,feve)-as v0IM Elie 26.year�4 hour sform elevations for.olie °ormore factures. A 30 day
Plan of Action- is attached. Agronomic balance is within acceptable range.
Waste is to be pumped.and hauled to off site locations. Volume and PAN content of waste to
-.:prtmpe4.. and hauled Is reflected. iri section lit fables: laclOded within this. _plan is: a.= ffst. of ffie-
proposed-'site`s with reiated-fa6Ml numtier(s),-=hu1'nber _acres ane'receiving' crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
-wasfe.fQ.asite. rjot-covore0iii the4a011t3eaxertified animal waste. mariagpmentplaii.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates fot depopulation
- if animals are_to be moyed-to-another,permitted facility,
..ide-facility-number,.lagoonp
freeboard euesax�erd pItrortaereingi,
3. .Earliest-possible.date to begin nand -application" -of waste:,W-,V-Yh-
1 hereby certify that I have reviewed the Information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the Information Is accurate and correct
jia✓+o+ �=•tw.
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
VoA,CoverVage 2121/00
Phone: �dS�'CffD
Date:—Z/--�j%�'
PLAN OF ACTION (PoA) FOR HIGHTRE15bOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Narne/Jdentifier.(11)).-;
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid -level according to marker inches
b. designed 25 yr.124 hr. storm & structural freeboard inches
0. ilne'b - line a Vhches'ltr red --zone) inches
d. top. of -dike: surface area according; to. design ?k0 ft2-
.-(area at below structural freeboard elevation)
e. line c x line d x 7.48_ggLLons
.12 f#3
A(*, qfo gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 —days
g. volume,of waste produced according to structural design —fo
�M_enf he'rd"ff, x rine g h. actual waste Oroduced,
certified herd #
1. volume of wash water according to structural design ft3
j. excess rainfall over evaporation according to design 38,20.3 W
, k �{b h+'I*�x7.48-x '30jais es 603,&agaltons
line f
4. Total PAN to be land applied during draw down period
1. current waste analysis dated i A- 18 - 18 1-40 1b/1000gal.
m. (Khm e,+ K. x line r lb --PAN
1000
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
41. TaT-JCS-Jt4DS-.0f.P-AN�,TORED,-,WITHIN STRUCTURAL FREEBOARDANDIOR26YR.124,:
STRUCTURES FOR 'FAZILITY
Aft TORM,STORAIGEiF-L-EVTtAONSINA-L-LAS-MT-E.- -
PdA -PO -DzA -X2110D 1 .1