HomeMy WebLinkAbout310268_Plan of Action_20180920Z 02)5
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
31-268
Facility Name: Charles Aycock #1 -- 2660
County: Duplin
Certified Operator Name: Charles Aycock Operator Number: AWA 17158
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(-Y-or-N):=- -
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1
N - — --
1
2. Check all applicable items
X Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. 'Hydraulic and agronomic balances are
within acceptable. ranges. -
X Liquid level is within'the 25 year 24 hour storm elevations for one or more. structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DW_ Q prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
- —*Attach-a-complete-schedule-with-corresponding-animal-units-and-dates-for-depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3:_ Earliest ,possible date to begin land application of waste: 9/20/18
Vhereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge.and ability, the information is
accurate and correct.
Charles Aycock Phone:
Facility Owner/Manager (print)
`'ivtorGe�U'l' Date:
Facility Owner/Manager (signature)
CAI-
a.
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): La oon 1
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker 1.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 18.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 20286 ft?
e. line c/12 x line d x.7.48 gallons/ft3 227609 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 19048 fO
h. current herd # 2600 certified herd # 2600
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 10/15/,18
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
19048 fe
�1fo
13387.5 fe
40436 gallons
0.68 Ibs/1000 gal.
182.3 Ibs. PAN
r_
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Lagoon 1
line m = 182.3 lb PAN
2. Structure ID:
line m =
lb PAN
3 Structure ID:
line m =
lb PAN
4. Structure ID:
line m =
lb PAN
5. Structure ID:
line m =
lb PAN
6. Structure ID:_�
line m =
lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 = 182.3 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
VtKIUU. UU NU 1 LIS I I-ItLUS IU VVMIUH VAN UANNU I tit AVVLItU UUKINU 1 MIJ 3U UAi rCK1uU.
o. tract # p. field # q. crop r. acres s. remaining IRR-2 I. TOTAL PAN u. application window'
PAN balance BALANCE FOR
(Iblacre) FIELD (lbs.)
column r x s
71825 1 bermuda hay 4.64 _ 50.00 232.0 3/1-10/15
71825 1 sm qr overseed 4.64 50.00 232.0 10/1-3/31 _
rurrent crop ending aoDlication date or next croD aoDlication beoinnina date for available
receiving crops during 30 day draw down period
v. Total PAN available for all fields (sum of column t) = 464.0,Ib. PAN
1V. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 182.3 lb. PAN
x. Crop's remaining PAN balance (line v from section 111) = 464.0 lb. PAN
y. Overall PAN balance (w - x) = -282 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance
PoA (30 Day) 2/21/00
table and recalculate the overall PAN balance. It animal waste is to be hauled to another permitted tacility, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit.
Prior to Hurricane Florence, Mr. Aycodk's lagoon was in compliance at 37 inches of freeboard. Hurricane Florence
brought at least 20 inches of rain to the area in September. The lagoon became inundated and the first day of irrigation
after the hurricane was 9/20/18. At the end of October/early November, lagoon was at approximately 17 inches freeboard.
On 11/20/18 freeboard level is 22 inches freeboard. PAN balance on bermuda is a conservative estimate at the time of
first irrigation after the hurricane.