HomeMy WebLinkAbout310268_Plan of Action_20180920Z 02)5 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-268 Facility Name: Charles Aycock #1 -- 2660 County: Duplin Certified Operator Name: Charles Aycock Operator Number: AWA 17158 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(-Y-or-N):=- - Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N - — -- 1 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. 'Hydraulic and agronomic balances are within acceptable. ranges. - X Liquid level is within'the 25 year 24 hour storm elevations for one or more. structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DW_ Q prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. - —*Attach-a-complete-schedule-with-corresponding-animal-units-and-dates-for-depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3:_ Earliest ,possible date to begin land application of waste: 9/20/18 Vhereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge.and ability, the information is accurate and correct. Charles Aycock Phone: Facility Owner/Manager (print) `'ivtorGe�U'l' Date: Facility Owner/Manager (signature) CAI- a. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): La oon 1 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 1.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 18.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 20286 ft? e. line c/12 x line d x.7.48 gallons/ft3 227609 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 19048 fO h. current herd # 2600 certified herd # 2600 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 10/15/,18 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 19048 fe �1fo 13387.5 fe 40436 gallons 0.68 Ibs/1000 gal. 182.3 Ibs. PAN r_ II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 182.3 lb PAN 2. Structure ID: line m = lb PAN 3 Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID:_� line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 182.3 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN VtKIUU. UU NU 1 LIS I I-ItLUS IU VVMIUH VAN UANNU I tit AVVLItU UUKINU 1 MIJ 3U UAi rCK1uU. o. tract # p. field # q. crop r. acres s. remaining IRR-2 I. TOTAL PAN u. application window' PAN balance BALANCE FOR (Iblacre) FIELD (lbs.) column r x s 71825 1 bermuda hay 4.64 _ 50.00 232.0 3/1-10/15 71825 1 sm qr overseed 4.64 50.00 232.0 10/1-3/31 _ rurrent crop ending aoDlication date or next croD aoDlication beoinnina date for available receiving crops during 30 day draw down period v. Total PAN available for all fields (sum of column t) = 464.0,Ib. PAN 1V. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 182.3 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 464.0 lb. PAN y. Overall PAN balance (w - x) = -282 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance PoA (30 Day) 2/21/00 table and recalculate the overall PAN balance. It animal waste is to be hauled to another permitted tacility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Prior to Hurricane Florence, Mr. Aycodk's lagoon was in compliance at 37 inches of freeboard. Hurricane Florence brought at least 20 inches of rain to the area in September. The lagoon became inundated and the first day of irrigation after the hurricane was 9/20/18. At the end of October/early November, lagoon was at approximately 17 inches freeboard. On 11/20/18 freeboard level is 22 inches freeboard. PAN balance on bermuda is a conservative estimate at the time of first irrigation after the hurricane. PoA (30 Day) 2/21/00