Loading...
HomeMy WebLinkAbout20160742 Ver 2_More Info Received_20190626Homewood, Sue From: Mularski, Eric <Eric.Mularski@hdrinc.com> Sent: Wednesday, June 26, 2019 11:59 AM To: Leslie, Andrea J Cc: David.W.Brown@usace.army.mil; Homewood, Sue; Ferguson, Jeff C; Macemore, John W.; Goudreau, Chris J.; Wise, Jon; 'John.Eddy@duke-energy.com'; 'Alan.Stuart@duke- energy.com'; Karably, Ken; Banta, Tim; Kulpa, Sarah; Little, Michael; Bennett, Jennifer Wright (Jennifer.Bennett@duke-energy.com) Subject: RE: [External] Cedar Cliff Hydroelectric Development Auxiliary Spillway Upgrade Project - Section 404/401 Amendment #2 Attachments: CedarCliffAccessAreaSite Plans20190626.pdf =External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to NNNNUmff nc. ov Hi Andrea, Thank you for reviewing the email request and plans submitted as part of the Section 404/401 Amendment #2 dated May 16, 2019. The attached plans have been revised to incorporate the NCWRC's comments and a written response to each comment is below. 1. Keynote #1 on sheet CCL -0104-021 states, "Docks are to be removed by others prior to construction." There is a standard floating dock adjacent to the ramp. NCWRC staff have been notified that the floating dock sections will need to be removed and stored off site prior to the start of construction. There is also an old fixed dock in place adjacent to the old concrete ramp. Please verify who will be responsible for removal of this dock. RESPONSE: The Balsam depot crew (John Macemore) of the NCWRC is planning to remove the floating courtesy dock on or about the first day of the drawdown. The crew will transport the floating courtesy dock to their depot, where it will be stored for the duration of the Cedar Cliff project. The old stationary dock should also be removed by NCWRC staff during the project to create the temporary access road. Removal of the old, existing dock should be included at the time the floating courtesy dock is removed. 2. The old concrete ramp located between the floating and fixed dock continues to be used for launching canoes and kayaks at this access area. Will the existing concrete need to be removed prior to or following construction and removal of the access road? Will that be decided based on the condition of the concrete remaining following removal of the construction access? If the concrete is to be removed, is there a plan for shoreline stabilization at this location? RESPONSE: From a license standpoint, the old concrete ramp is not required given the presence of the new ramp that NCWRC installed. It is unclear at this time whether there is a need for shoreline stabilization measures. Part of the old ramp will likely be covered by the rock vane. The plans currently do not specify any shoreline stabilization outside of the channel and rock vane. Unless incompatible with future access area improvement plans, the shoreline can be stabilized with rip rap per the Revetment Detail 2 on Sheet CCL -0105-012. 3. The proposed Ditch #6 along with the construction of a rock vane plug and earthen berm between the ditch and ramp approach (sheet CCL -0104-020) should help with the sediment issues at the ramp. The longitudinal slope in Ditch #6 between the proposed 2024 & 2021 contours flattens out relative to the upstream and downstream channel slopes and at a point just below where flow from Kiesee Creek enters Cedar Cliff Lake at normal levels. It is likely that sediment carried by the creek following heavy rains will continue to deposit in this area. Over time, that section of the ditch channel may be filled in with sediment. Flow from the creek below the lake surface could then overtop the proposed berm and cut a new channel back through the ramp approach area. Has any modeling of sediment flow through Ditch #6 been done to verify that the channel slopes and dimensions will be sufficient to keep sediment moving from the mouth of the creek through to the proposed end of channel at E1.=2300'? RESPONSE: No sediment modeling has been performed. The channel will be subject to deposition of sediment for the duration of construction. Twenty-five (25) -year velocities in the section noted appear to be less than 1 fps over the full channel section, which would favor deposition. Given the limited duration of the project and the contract requirements for temporary facilities to be maintained, the likelihood of the channel filling and overtopping the temporary access road is considered low. In the long-term, the channel configuration below normal pool will have little impact on sediment deposition because velocities will be very low once the flow transitions from channel flow into the lake. Even if the rock vane is extended further into the lake, formation of a sediment delta at about the normal pool elevation is still likely. 4. Detail #3 on sheet CCL -0105-012 shows a typical section of the proposed rock vane. Is there a specification of size and gradation for rock to be used? RESPONSE: Detail #3 on Sheet CCL -0105-012 has been revised to indicate the size and gradation of rock to be used (see attached). 5. Detail #4 on sheet CCL -0105-012 is the typical section for the temporary construction road. It will be built 3'± thick with surge stone placed over a geotextile layer. What are the plans for disposal or reuse of this stone after the temporary construction access road is removed? RESPONSE: "Remove" implies material will be removed and disposed of off-site. This will be the default practice unless a beneficial reuse can be identified on-site, especially any reuse associated with planned access area improvements. Sheet CCL -0105-012 has been revised to include a note to this effect for improved clarity (see attached). 6. Keynote #2 on sheet CCL -0104-021 states, "Contractor shall maintain aggregate base on parking lot in good condition." Will this plan include details for access area site improvements to stormwater drainage & BMPs, paving & parking/ADA delineation, etc. following this project? Will the access area improvements be by a different designer & contractor? What will the timeframe be for access area improvements following the dam modification project and drawdown? RESPONSE: Duke Energy's Recreation Planning team is working on preliminary plans for the Cedar Cliff Access Area improvements associated with the project. The design will be developed in coordination with Duke Energy's Major Projects team and will utilize a design firm with experience in recreational design. (The specific design firm has yet to be identified.) Access Area improvement construction activities will begin as soon as possible after the spillway project construction demobilizes out of the access area. The Recreation Planning team has maintained communication with Jeff Ferguson, NCWRC Engineer in the Asheville Office, and will continue to include NCWRC on the design plans as they progress. Please let us know if you require clarification to the responses detailed above. Thank you, Eric Mularski, Pws Environmental and Regulatory Team Lead HDR 440 S. Church Street Charlotte, NC 28202 D 704-973-6878 M 704-806-1521 Eric. m u larski(cD_hdrinc.com hdrinc.com/follow-us From: Leslie, Andrea J [mailto:andrea.leslie@ncwildlife.org] Sent: Wednesday, May 29, 2019 2:52 PM To: Mularski, Eric <Eric.Mularski@hdrinc.com> Cc: Brown, David W CIV USARMY CESAW (US) <David.W.Brown@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov>; Ferguson, Jeff C <jeff.ferguson@ncwildlife.org>; Macemore, John W. <john.macemore@ncwildlife.org>; Goudreau, Chris J. <chris.goudreau@ncwildlife.org> Subject: RE: [External] Cedar Cliff Hydroelectric Development Auxiliary Spillway Upgrade Project - Section 404/401 Amendment #2 Hi Eric, NCWRC staff have reviewed the documents you sent in your May 16, 2019 email. We are providing the following comments on the plan sheets. Please contact Jeff Ferguson [(828-231-3517); please cc me if via email] to discuss these comments. 1. Keynote #1 on sheet CCL -0104-021 states, "Docks are to be removed by others prior to construction." There is a standard floating dock adjacent to the ramp. NCWRC staff have been notified that the floating dock sections will need to be removed and stored off site prior to the start of construction. There is also an old fixed dock in place adjacent to the old concrete ramp. Please verify who will be responsible for removal of this dock. 2. The old concrete ramp located between the floating and fixed dock continues to be used for launching canoes and kayaks at this access area. Will the existing concrete need to be removed prior to or following construction and removal of the access road? Will that be decided based on the condition of the concrete remaining following removal of the construction access? If the concrete is to be removed, is there a plan for shoreline stabilization at this location? 3. The proposed Ditch #6 along with the construction of a rock vane plug and earthen berm between the ditch and ramp approach (sheet CCL -0104-020) should help with the sediment issues at the ramp. The longitudinal slope in Ditch #6 between the proposed 2024 & 2021 contours flattens out relative to the upstream and downstream channel slopes and at a point just below where flow from Kiesee Creek enters Cedar Cliff Lake at normal levels. It is likely that sediment carried by the creek following heavy rains will continue to deposit in this area. Over time, that section of the ditch channel may be filled in with sediment. Flow from the creek below the lake surface could then overtop the proposed berm and cut a new channel back through the ramp approach area. Has any modeling of sediment flow through Ditch #6 been done to verify that the channel slopes and dimensions will be sufficient to keep sediment moving from the mouth of the creek through to the proposed end of channel at E1.=2300'? 4. Detail #3 on sheet CCL -0105-012 shows a typical section of the proposed rock vane. Is there a specification of size and gradation for rock to be used? 5. Detail #4 on sheet CCL -0105-012 is the typical section for the temporary construction road. It will be built 3'± thick with surge stone placed over a geotextile layer. What are the plans for disposal or reuse of this stone after the temporary construction access road is removed? 6. Keynote #2 on sheet CCL -0104-021 states, "Contractor shall maintain aggregate base on parking lot in good condition." Will this plan include details for access area site improvements to stormwater drainage & BMPs, paving & parking/ADA delineation, etc. following this project? Will the access area improvements be by a different designer & contractor? What will the timeframe be for access area improvements following the dam modification project and drawdown? Thank you, Andrea Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 645 Fish Hatchery Rd., Building B Marion, NC 28752 828-803-6054 (office) 828-400-4223 (cell) www.ncwildlife.org Get NC Wildlife Update delivered to your inbox from the N.C. Wildlife Resources Commission. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Mularski, Eric <Eric.Mularski@hdrinc.com> Sent: Thursday, May 16, 2019 10:23 AM To: 'david.w.brown@usace.army.miI' <david.w.brown@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Mitchell, Robert K <kevin.mitchell@ncdenr.gov>; 'John. Eddy@duke- energy.com' <John.Eddy@duke-energy.com>; Wise, Jon <Jon.Wise@duke-energy.com>; 'Ala n.Stuart@duke-energy.com' <Alan.Stuart@duke-energy.com>; Nicholson, Allen (Furber. Nicholson@duke-energy.com) <Furber.Nicholson@duke- energy.com>; Ken.Karably@duke-energy.com; Banta, Tim <Tim.Banta@hdrinc.com>; Kulpa, Sarah <Sarah.Kul pa@hdrinc.com>; Little, Michael <Michael.Little@hdrinc.com> Subject: [External] Cedar Cliff Hydroelectric Development Auxiliary Spillway Upgrade Project - Section 404/401 Amendment #2 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Mr. Brown & Ms. Homewood, On behalf of Duke Energy, HDR is requesting an amendment to the previously approved Section 404 (Action ID 2015- 02543) and Section 401 (DWR# 2016-0742) Individual Permit for the Cedar Cliff Development Auxiliary Spillway Upgrade Project (Project). As part of the amendment, Duke Energy would like to include the revised water quality monitoring plan, an update to the USACE Individual Special Condition 20.0 regarding required depth of Turbidity Barriers, and authorization for additional impacts to Cedar Cliff Lake to accommodate the proposed Cedar Cliff Access Boat Ramp — Temporary Construction Access Road. Brief descriptions of these components are described below. Water Quality Plan — A rock spoil assessment was initiated following internal review of the subsurface investigation report that indicated the presence of pyrite material in rock core samples in the auxiliary spillway rock face. These findings were discussed during a Project status update meeting with the environmental regulatory agencies (including the U.S. Army Corps of Engineers, NC Division of Water Resources, US Fish and Wildlife Services, and NC Wildlife Resources Commission) on February 8, 2018. The recommendation was made to develop a Water Quality Monitoring Plan to gather baseline data as well as post -construction data as a due diligence measure to ensure that placement of all excavated material from the auxiliary spillway into the reservoir would not adversely affect water quality. Duke Energy developed a draft Water Quality Monitoring Plan and submitted the document to the agencies for review. On June 6, 2018, a teleconference was held to discuss the proposed Water Quality Monitoring Plan. Per recommendations made during the second meeting, the plan has been revised to include a Data Review and Reporting Requirements section (see attached). The revised Water Quality Monitoring Plan will be attached to the Section 404/401 Individual Permit amendment. • Turbidity Barriers - Duke Energy requests that SAW -2015-02543 Special Condition 20.0 regarding Turbidity Barriers be revised to read; "Prior to the initiation of any of the work authorized by the permit, the Permittee shall install floating turbidity barriers with weighted skirts that extend to a depth of at least 5 feet around all work areas that are in, or adjacent to, surface waters. The turbidity barriers shall remain in place and be maintained until the authorized work has been completed and all erodible materials have been stabilized." Cedar Cliff Access Area - Temporary Construction Access Road — Duke Energy would like to include an additional barge access area at the existing North Carolina Wildlife Resources Commission's Cedar Cliff Access Area to support the Project. This will require an approximately 550 -foot -long temporary access road to the proposed barge location. The Cedar Cliff reservoir will be drawn down approximately 30 feet in September 2019 after Labor Day to support the installation of the new spillway hoist, maintenance of the radial gate, and the Project. The required reservoir drawdown will be sustained over the course of approximately 25 months. The barge access temporary construction road is necessary to maintain access to the Cedar Cliff reservoir for equipment and material support for the Project during the 25 -month period. Duke Energy is proposing to install an approximately 500 -foot long temporary stone construction access road below the Cedar Cliff Reservoir full pond elevation of 2,330 feet above mean sea level (feet msl). The proposed road will terminate at the 2,300 ft msl reservoir drawdown elevation for barge access (Drawing CCL -0104-021). Flow from Kiesee Creek has eroded the existing floating boat dock and sediment has been deposited in the shallow portion of the reservoir. Duke Energy is proposing to excavate the excess sediment from the reservoir to elevation 2,322 ft msl as shown on Drawing (CCL -0104-020). All excavated material will be deposited in upland areas. Installation of a permanent rock vane is proposed to deflect flow from Kiesee Creek away from the boat launch. A permanent rock ditch (Ditch 6 on the attached plans) parallel to the proposed access road will be installed to promote flow to the reservoir during the drawdown period. Ditch 6 and rock vane will remain after construction to promote flow away from the boat launch. To facilitate the construction of Rock Ditch 6 a temporary pump -around scheme will be employed along a section of Kiesee Creek as shown on Drawing CCL -0103-012. The proposed limits of the disturbance (LOD) area below the 2,330 ft msl full pond elevation is approximately 1.41 acres. A list of additional impacts below full pond elevation that are requested to be considered as part of this 404/401 permitting addendum are included in the table below. SHEET Number Type of Impact Permanent Impacts Temporary Impacts CCL -0103-012 Dewatering 0 acres 45 linear feet Pum - Around of Kiesee Creek CCL -0104-020 Excavation 0 acres 0.49 acres CCL -0104-021 Barge Access Road (Fill) 0 acres 0.49 acres 2,065 cubic yards of rock fill 0.70 acres CCL -0104-020 Rock Ditch 700 cubic yards of rock fill 0 acres CCL -0104-020 Rock Vane 0.03 acres (100 cubic yards 0 acres of rock fill Attached to this email are the revised Duke Energy Water Quality Monitoring Plan and the proposed Cedar Cliff Access Area Grading Plans and Details. We ask that you review the attached plans and include the additional impacts as part of Duke Energy's Section 404/401 Individual Permit authorization. Please do not hesitate to contact me if you have questions regarding this permit amendment request. Thank you, Eric Mularski, Pws Environmental and Regulatory Team Lead HDR 440 S. Church Street Charlotte, NC 28202 D 704-973-6878 M 704-806-1521 Eric. mularski(cD_hdrinc.com hdrinc.com/follow-us =V 2 3 4 5 6 7 8 CCL -0103-012 it > ,� , , / , , / , , , , , , , , , , , / , / / / / \ CEDAR CLIFF RESERVOIR \ \ \ 1 r/ DRAWDOWN EL 2300.00 / //", r / /lr _ , 'PROPERTY LINE (TYPa' , /,// /'/ / . .'� //' /, / ,./-.� B I I '...� ' � ., O/ l % ,/ / / / , / / / / / / �//// / / / �/, /f / / / / / / . , , ' / /. // / ::' / / / /, . \ �. J TURBIDITY CURTAIN (TYPE 2) \ \ \ �_.;' _- ,. �/,� /,// \ 2 SILT FENCE '•♦• ,� I � \\ \ \\ \\ ��. ' '/, ROCK OUTLET TYP i \ r// 0105007 J \ \ CEDAR CLIFF RESERVOIR _ '•♦ O� \ I \ \ \ \ FULL POND EL 2330.00 '♦ \ \ I \ \ \ \ ` /� / / / / / I /lir •/ �, // / / // . /,- /S/1/, SILT FENCE (T.YP) 0 J� 00LICENSE/ \\ \ \ \ \ \ \ \ \ \� 0105007 PROJECT_ BOUNDARY, _ - , r r �, _ _ I 5 / ''♦ / \ \\ \ \ \ \ C'o SILT FENCE _ 0105 -007J -HOOK (TYP)- -, \ \ �, '� \ \ v O \ \ \ \ \ CONSTRUCTION ACCESS ROAD �% / ANO 001 INC' I - - t A \ \ \ 1 1 I I I1 1 1 I 1 / /' /I r/ ' /1 '' ''/'.r,jv ///'//' /,// //' // /'' /' . ''/J '' '' /' #1* J / / \ �k� pO \ \ \ \ \ \ \ �2305CONCRETE i If I i i 1 I l �)„�r, ,r i ! /�' ,' i// /' �I /� i i i I ' I if ' �' _ _ /'' BOAT. RAMP �O 1 _ _ J/ IQ L00 / if ' / / / 1 /III,'/ , // '/ / '/ / / / / / / / I I I I r , 1 2310 I /r T /* / / / / I / /�)/' / 00 ` �.3 \� LOD •'` \` \` \\ \\ \` \�\ If FLOATING BOAT DOCK / �Op `` ROCK CHECK DAM 0105-007 \ /jF/ / / 1 \ \ \ �\ ♦ `\ ` \ ` ` \ '/ / /# CJS / I /,/� / / / r, 1 ' / i / 1 ) ' ' '` I k / � O� LIMITS OF DISTURBANCE if /1 // 1: /II I Ill If /0!_- // I I ' r \\ `\ \ I I I I ,' ' I 1\ \ �/ / vpp DITCH #6 CL / ' ` I CAUTION: OVERHEAD-----_ ` POWER INE \ L `\ \ \ / ' / // /'//r1' - / Ill / / I / / I � ,' I \ /�' / '�• '��,_• \ \ \ I I I / _ `� \ \ `� If WOOD DOCK --aO�� f �' `\ \\ \ \`�----_- 'TO BE REMOVED \ ` / PARKING LOT / r ;/ r'//' • /',' /' ' / \ ��. _ \\ I CAUTION: OVERHEAD If POWER LINE : - •♦ \ \ \ \ / \ Nqell' '// 1 /• r// /' /�/ / // \\ \\ \` \ \ ,' / !III ,//'' /' \\ '`'• 1 �-_-- -\�\\ ` �`\ \` \`� \``� ,'' / '” � ---_ \�� \`\ 2340 go /0 v, k--------- OL CULVERT - \ - -- _ - ♦, \ 00 • / �\ �__J �/ / / �`�' „ APPROXIMATE LOCATION \/ - 1 '�. - 1 ------ --- .♦• `\\�\ - r O TEMPORARY GRAVEL .�r� r // _ ----- \-- - -____ - \ �.• .� 'INSTALL PUMP -AROUND MEASURES 5�. - \\ _ _ -- __-- \\,�`_, ♦ ♦. \- \\` CONSTRUCTION ENTRANCE0105-005,-*O .�• `� / i _ --- --- -- -- _-__ '_ I I __ ♦ \ O 00 , - FOR_ DITCH CONSTRUCTION /0105-008 _ / /-•.•-"--1---- _ 1 , --- 360 / / ��•/ —_ — ^, ' / i r / � / _/ / / /i /— _ 370' � — _ \__-- --__ -\ ___-- —_____ —__� --____—_' � _ ____—'--_____ ` \\ � �f'✓�'-._/ COORDINATE WITH OWNER BEFORE REMOVINGr_-----_ ____-------- _ ------ \'�,,/ �.•�•;/ ••,�.--�wa� .----__ \ ONLY CLEAR TREES NECESSARY TO INSTALL PUMP/ /' ,/ , _____________ - `_-- `\_ - - ----__ `-------__'\--------- - --- ---- ��.AROUND MEASURES ' /r ,'//' /' ;,--- ---_- __;�; ------------- ___ ------------- �` -` -� TITLE REV. B GENERAL NOTES: 1. FOR ADDITIONAL GENERAL NOTES SEE CCL -0100-004. ---------� FOR DRAWING INDEX SEE CCL -0100-001. FOR ABBREVIATIONS SEE CCL -0100-002. FOR LEGEND AND SYMBOLS SEE CCL -0100-003. CEDAR CLIFF ACCESS AREA 2. SEE CCL -0104-020 AND CCL -0104-021 FOR GRADING PLAN AND BOAT LAUNCH AREA CONSTRUCTION SEQUENCE. 3. TEMPORARY IMPACTS BELOW ELEVATION 2330.0 = 1.5 ACRES, KEYNOTES: 1O AFTER DITCH CONSTRUCTION IS COMPLETE, REMOVE ALL TEMPORARY MEASURES AND RESTORE DITCH TO EXISTING CONDITIONS ABOVE FULL POND ELEVATION 2330. 30 0 30 0009 SCALE: FEET PLAN SCALE: 1 "=30' FOR SCALE: AS NOTED DES: MGL PRELIMINARY DUKE DWG TYPE: DGN DFTR: JTTD NOT FOR ENE RG%/ JOB N0: 10060948 CHKD: CONSTRUCTION DATE: FILENAME: CCL-0103-012.DGN APPD: OR DWG SIZE DRAWING NO. REVISION HDR Engineering Inc. of the Carolinas License Number: F-0116 RECORDING B 6/26/2019 LOD AREA REVISION. JTTD MGL ANSI D — A 3/13/2019 ISSUED FOR BIDS. JTTD MGL — 22.0"x34.0" CCL -0 103-012 B 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 PE SEAL N0. DATE REVISION DFTR DES CHKD APPD INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 8 9 10 1 I 1 1 1 1 1 •' \ '� '-- � ' ' --- --- ---------� AUXILIARY SPILLWAY -- -- '♦,; ,,/, `_ ,- / , , 1 / \, ,_-- -, -' `\ --------- ------------ - ----------- ,, -'-------- --- CEDAR CLIFF ACCESS AREA -F - -----_ -- EROSION AND SEDIMENT CONTROL PLAN PLAN SCALE: 1 "=30' FOR SCALE: AS NOTED DES: MGL PRELIMINARY DUKE DWG TYPE: DGN DFTR: JTTD NOT FOR ENE RG%/ JOB N0: 10060948 CHKD: CONSTRUCTION DATE: FILENAME: CCL-0103-012.DGN APPD: OR DWG SIZE DRAWING NO. REVISION HDR Engineering Inc. of the Carolinas License Number: F-0116 RECORDING B 6/26/2019 LOD AREA REVISION. JTTD MGL ANSI D — A 3/13/2019 ISSUED FOR BIDS. JTTD MGL — 22.0"x34.0" CCL -0 103-012 B 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 PE SEAL N0. DATE REVISION DFTR DES CHKD APPD INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 8 9 10 1 I 1 1 1 1 1 r�1 2 3 4 5 6 7 8 CCL -0104-020 GENERAL NOTES: v 2 CEDAR CLIFF RESERVOIR DRAWDOWN EL 2300.00 \ \ \ \ ,PROPERTY LINE (TYP)/ / / / // y / \ I I •�, I \ _ CEDAR CLIFF RESERVOIR FULL POND EL 2330.00 bo 13 FERC LICENSE / / , _ .1 1/ /, / / �, / , /,,. PROJECT BOUNDARY, I �_, ,, / / / / �, - 1 ` �'\ \ \ \ \ \ o 1 1 , \ \ \ \ \ \ \ \ TERMINATE PERMANENT\ \ \ \DITCH AT ELEVATION '\ \ \ \ �� AB 1 ` \ 2300.00 \ \ \ \ REMOVE SEDIMENT DEPOSITS. GRADE / / , / , ,/ / / , I , f / / \ \ \ \ \ 1 / , / � , \ � TO ELEVATION 2322.00 /p N \ \ \ / , / / / // / / '' /' --'' ' ' ' / \ ' 12322-\ C`1 , f ,I // i l T� // / / / / / / / i i I ' r' - y ' i i 1 // FILL CHANNEL AND GRADE AREA FOR POSITIVE \ \ \ \\ \\ \\ \\\ / / , / ., / / r / ♦ /, / / III I \ / T R T R \ \ \ \ \ \ REV. B FOR GENERAL NOTES SEE CCL -0100-004. FOR DRAWING INDEX SEE CCL -0100-001. FOR ABBREVIATIONS SEE CCL -0100-002. FOR LEGEND AND SYMBOLS SEE CCL -0100-003. BOAT LAUNCH AREA GRADING CONSTRUCTIO SEQUENCE: 2.1 VERIFY FLOATING BOAT DOCK HAS BEEN REMOVED BY OTHERS. COORDINATE WITH OWNER. 2.2 INSTALL EROSION AND SEDIMENT CONTROL MEASURES AND TURBIDITY CURTAIN AS SHOWN ON CCL -0103-012. 2.3 DEMOLISH AND REMOVE WOOD DOCK. 2.4 REMOVE SEDIMENT DEPOSITS AND GRADE TO ELEVATION 2322 AS SHOWN ON PLAN, 2.5 INSTALL PUMP AROUND MEASURES TO CONSTRUCT DITCH 6. 2.6 INSTALL DITCH 6 AS SHOWN ON CCL -0104-021; IMMEDIATELY STABILIZE WITH RIPRAP. 2.7 FILL CHANNEL AND COMPACT. INSTALL ROCK VANE TO ELEVATION 2329. 2.8 AFTER DITCH 6 IS INSTALLED REMOVE PUMP AROUND MEASURES. 2.9 GRADE AREA ADJACENT TO BOAT RAMP AS SHOWN ON PLAN. DO NOT DISTURB CONCRETE BOAT RAMP. 2.10 INSTALL TEMPORARY STONE CONSTRUCTION ACCESS ROAD AS SHOWN ON CCL -0104-021. CONCRETE / / OWA DS 2322.0 CON OU 11n \ c`I 11,2.11 AFTER PROJECT IS COMPLETE, 01 BOAT r// , / r / l , l , 1 \ \ I BOAT RAMP •�, I I I , � / �\ \ ` ` ` ` \\ �\ REMOVE ACCESS ROAD AND RESTORE GRADES AS SHOWN ON CCL -0104-020. CONSULT WITH OWNER PRIOR TO ,'/ r ///// '/ /,/� !• ,'// �'' ,' '' /� //,' / l 1 1 \\ \\ \ o \\ \ / I / / OCA REMOVING STONE MATERIAL FROM 1 l I / / // ',✓/ / / . / , I ` \ , \ \ 1 / J \ ``\ `\ `\ \\ `\ `\ `\ \\ \ \\ l SITE. CA , l Ill /l,/// /,/ / , /�/ , ,/ / -_ // , / , I I ` `\ \ ♦ \ I / `\ \\\ \ ``\ `\ `\ ` \ \ `\ '1\ 2.12 CONSTRUCT ROCK VANE TO \ \ \ \ \ II ELEVATION 2332. 3 3. PERMANENT IMPACTS BELOW ELEVATION I / \ \ \ /,// 1 / / �/ '• ,!' I \\ ' / I ' , I 1 I \ \ I \ \ 2330.0 - 0.70 ACRES. DITCH 6 RIPRAP LINED 0105-012 O FLOATING BOAT DOCK \ 1 ` If ,r /l ,/ I '/ / , / I l / I ' ', 1 I \ \ I I \ \-------- \` �` KEYNOTES: ----------------- FLOATING / '� / r /'/1 / --- / / / 1 / ' \ I I /'--• \ \\ li i I O FLOATING DOCK TO BE REMOVED BY l / , l / /' � /,' /' \ 1 ., • `\ ` \ \ / __ . \ . \ ,� 2 PARKING LOT I\\ \\ I I /, , \ WOOD DOCK C 2 _ _ _ \ I I r \ OTHERS PRIOR TO CONSTRUCTION. �' -- ,__--- ------ QCONTRACTOR SHALL MAINTAIN ' ' �• \ \ 1 ' \ AGGREGATE BASE ON PARKING LOT IN I/ / // r/ ' ' ' ' /' ' ; TOP OF ROCK VANE = 2332.0 3 / '--" ``\ \�\ \\ \\ `\ \ \\ _ ,� ,' `.`\`�\ `\\ GOOD CONDITION. - RIP -RAP REVETMENT SHORELINE STABILIZATION. SEE DETAIL 2/CCL-0105-012. ROCK VANE1 �� I' ` `\, �` `\ \ \ \ ` DEMOLISH AND REMOVE WOOD DOCK. \ 0105-Q 12 I I '� � '�/,/' J -,' \ ••\ `\ \ `\ \ `\ ` \ i' ' /' - \ `\ /` ,�� / , / l \ \ /.• /j ,, / \ \ - __ __ O5 CONCRETE BOAT RAMP SHALL REMAIN r/, / I,/ ' / \ \ \ I I /'I % /j /r/�'> \ •�' `\_-\ ` --- /'' -------- \ IN PLACE. •x.2340 _ l / �\ 1 / / , / ,/ � / moi' , ,/ \ - �\ __ � -\ \ `� ! � \ _--_-�-- _- .��, •�• \ � \ 1 I � / \ / / �// � '�� , • ,-./`, '_ _ _- _ - �__ -� - `-�` _ ter.` -/` l�'-�--_�-- -- .�• '�• � \ ��\ �\\ CULVERT _ \ - 1 •♦ - -\ - _ywia ����'�1----- .'•.�• •�`•• `\\\\ `�\� / , ♦ \ ` / \ - ;� ,/ // / ; /_ APPROXIMATE LOCATION \` - \ ''�. ----------- -------- �•,�• �•• `�\\ ;`e. 235 _---_-- \_ \ - I ---------------------- v*) --_'_---------•_ _ •�• _- - _ '--- _--- - - \ '� \\ 1 \ �` 30 0 30 ♦'� / / ( / /��•• <I I ~ /, / ice`- - --'-_' �/ ,' �/' i-'" _ '� /'-`_\`----`--�-- - - ` - -_-_-' _-\ \ `\\ `♦. ♦��. ' 1 :��.��'' --- ^\_ - /� /' \\ \ ` _ -- - 2370`___ -_-- -- -- _--- _-_ --------- _----=�-` SCALE: FEET TITLE AUXILIARY SPILLWAY --- CEDAR CLIFF ACCESS AREA -F GRADING PLAN PLAN SCALE: 1 "=30' HDR Engineering, Inc. of the Carolinas License Number: F-0116 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 INCHES 1 2 3 TENTHS 10 20 30 4 5 I I PRELIMINARY NOT FOR CONSTRUCTION OR RECORDING PE SEAL B 6/26/2019 A 3/13/2019 NO. DATE DITCH GRADING AND RIP -RAP REVETMENT REVISION. ISSUED FOR BIDS. REVISION FOR DUKE SCALE: AS NOTED DWG TYPE: DGN ENE RGYF DATE:JOB 10060948 FILENAME: CCL-0104-020.DGN DWG SIZE DRAWING NO. JTTD MGL JTTD MGL - - ANSI D L_0104-020 DFTR DES CHKD APPD CC 22.0"x34.0" v v 9 11 DES: MGL DFTR: JTTD CHKD: APPD: REVISION IV =V 2 3 4 5 6 7 8 CCL -0104-021 ,/�,�/♦♦ , , / / // , �// /// //,//// ///i/,,� / i /� /%-'•, .' / / //, ♦/ / ,/// / / , / / / ,'�,/♦ '�s=' ♦/,//, ,��, � I I I , CEDAR CLIFF RESERVOIR /,�'�',' ♦, /, //// // // / ry0`/ , O ,/ / /i' 1 x ///-�♦ /'//,' ♦,/ / ' / ',' //,', �' ♦//i'/','i// �'/'/,' ,'// 1/r 1\ I I DRAWDOWN EL 2300.00 "'�♦�♦' �/ ♦/ �/ / ,' J/ i / ,// / / O /ii' l I ` ,, �� - ,PROPERTY LINE�(TYP)� / �./ � / :' /7 Ili / . / , , , , / / � , ♦ / / , \ \ -__\ \ \ 1 \ \ REV. B GENERAL NOTES: 1. FOR GENERAL NOTES SEE CCL -0100-004. FOR DRAWING INDEX SEE CCL -0100-001. FOR ABBREVIATIONS SEE CCL -0100-002. FOR LEGEND AND SYMBOLS SEE CCL -0100-003. 2. SEE CCL -0104-020 FOR BOAT LAUNCH AREA CONSTRUCTION SEQUENCE. 3. TEMPORARY IMPACTS BELOW ELEVATION 2330.0 = 1.5 ACRES. / / / , / , / , , . O, /,/ ♦ / / . / / / / // // / , ♦ / / \ \ - '.` \ \ 1 \ KEYNOTES: , CEDAR CLIFF RESERVOIR J'' ',' �' ' ' ' / ' / '/ , / ' ' / ' / // ' / ' FULL POND EL 2330.00 \ I ` �'� \ \ ' ` \ \ O FLOATING DOCKS TO BE REMOVED BY I , 1/ / 1 / / / / / \ \ o I \ \ (O / / / / l \ 1 I \ \ /„I , 0 , , , / , , / / \ ''� ZG�. \ , \ \ \ \ OTHERS PRIOR TO CONSTRUCTION. / / f I INSTALL TEMPORARY STONE ACCESS 5 \ CONSTRUCTION ROAD AFTER GRADING SHOWN ON CCL -0104-020 IS LICENSE / VD, PRUJECT BOUNDARY �_,_, ,/ / I / / / / �, ---- \`\\\'_, I \ / '•� \ \ \ \ \ o COMPLETE. SEE GENERAL NOTE 2. ,�♦ , _/ , //// ; /� I I / ' ,' , / / / ,, , J 1 , ,♦ ,/ ,' / / \\ GRADES,----___ \ \ \ `\ •�'•� \\\ \ \\ \ O \\ \\ \\ \\ O3 SEE CCL -0104-020 FOR FINAL DITCH J � / ,�� % / / / � / / / �,♦ / / ! \ \ \ \ \ \ \ \ \ \ \ \ O4 CONFIRM PAD DIMENSIONS WITH OWNER ,// / ,, ' / / / / \ 1 / \ \ p / \ \ \ \ ` \ \ PRIOR TO CONSTRUCTION. PAD SIZE / / / \' 1 I / r / I \ k0 \ \ \ \ \ \ \ l„/ /i,,J / / / / , , , , / , , \ l l I \ X � \ \ \ SHALL ACCOMMODATE CRANE USED FOR ' // /i !• // Al / / / / / / ' /' / ,' / l / ��' 1 // �/ f / l 1� \ O4 0 '� 2 \ \ BARGE ASSEMBLY. TERMINATE TEMPORARY DITCH AT \ \ I , / , , , / , / I / • / / v' DRAWDOWN ELEVATION 2300.00 I I, , / / / , l , / , l _-�\ TEMPORARY STONE ' ' '' ' ' ' '' ' ' 1 ' l •� l \ 2 0105-012 CONSTRUCTION ACCESS ROAD / ♦ /�' / , /I, / / / / I I I I I / / /1/ ! / / � / / / // / /, � -. / ,♦ / I \ \ 2305\ \ 1 1 1 1 /rri' C, - 2310 / ki /, / / / // / J / , I / , • / / , CONCRETE \ \ \ \ \ \ \ \ //�1 ,//„ / „// �11� ,/, // ,/ __♦ /// , I I 1 BOAT RAMP \- / FLOATING 1 BOAT DOCK � 2 DITCH #6 CIL O3 \ \ ob PARKING LOT ALIGNMENT CURVE TABLE CURVE NO. PI STATION 0 RADIUS TANGENT LENGTH CHORD DIRECTION CHORD LENGTH C 1 0+68.70 036°45'21.93” 100.00' 33.22' 64.15' N39.39'44.47"E 63.06' C2 1+43.53 043°36'23.08" 50.00' 20.00' 38.05' N43.05' 15.04"E 37.14' C3 3+77.67 010°48'00.14" 200.00' 18.91' 37.70' N70.17'26.65"E 37.64' � it I:/ /,/// /'�/' / ,' \ �'\ ��//�/�/♦ \ \ I \ * •� \\ •,�• \\ \��_�_ \\\ � 1-1 549.89 N65° 21' 18"E (779427.4419,569436.4247) / L2 14.45 N61 • 42' 35"E (779464.501 6,569350.7985) (779477.2297,569357.6491) 1-3 21.02 N58° 02' 25"E (779477.2297,569357.6491) (779495.0632,569368.7752) L4 23.90 N21* 17' 04"E (779535.3102,569417.3177) (779543.9863,569439.5889) L5 197.19 N64- 53' 27'E (779569.3585,569466.714 1) (779747.9107,569550.3893) L6 152.16 N75° 41' 27"E (779783.3489,569563.0845) -- 2340 - B `- CULVERT APPROXIMATE LOCATION \ \ _ --- ----2350.----- \V ALIGNMENT LINE TABLE LINE NO. LENGTH DIRECTION START POINT (N,E) END POINT (N,E) 1-1 549.89 N65° 21' 18"E (779427.4419,569436.4247) (779927.2402,569665.7248) L2 14.45 N61 • 42' 35"E (779464.501 6,569350.7985) (779477.2297,569357.6491) 1-3 21.02 N58° 02' 25"E (779477.2297,569357.6491) (779495.0632,569368.7752) L4 23.90 N21* 17' 04"E (779535.3102,569417.3177) (779543.9863,569439.5889) L5 197.19 N64- 53' 27'E (779569.3585,569466.714 1) (779747.9107,569550.3893) L6 152.16 N75° 41' 27"E (779783.3489,569563.0845) (779930.7856,569600.6910) \ •�\\ \\II rte+ 30 0 30 �..�.-.._.---------- �, ,' ' ' �`r✓�' ----- -\_--_�`'- _ ,' /' � \ .'/' \ ` -, -- �, .' , ,'" _____'- 2370 `' --�`---___ -__---- _--------=�� ------ --_\\ ,\ \ SCALE: FEET '� �• / - , —\-- — ; ,',' \ ---- '" — , / ,' , ,- ---__ --_` `___ — --__—\�---/- — TITLE AUXILIARY SPILLWAY \\-- ' ' ' \ \ \\ - _ CEDAR CLIFF ACCESS AREA _ , , , r - `\ ----- ------------ - -- - - -- --- - - -- -------- ---' - CONSTRUCTION ACCESS ROAD -F GRADING PLAN PLAN SCALE: 1 "=30' FOR HDR Engineering, Inc. of the Carolinas License Number: F-0116 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 PRELIMINARY NOT FOR CONSTRUCTION OR RECORDING INCHES 1 2 3 TENTHS 10 20 30 4 5 6 I I I B 6/26/2019 CONSTRUCTION ROAD AND GRADING REVISION. A 3/13/2019 ISSUED FOR BIDS. PE SEAL NO. DATE REVISION I DUKE SCALE: AS NOTED DWG TYPE: DGN ENEnl*"**%/ JOB NO: 10060948 DATE: FILENAME: CCL -0104-021 .DGN DWG SIZE DRAWING NO. JTTD MGL JTTD MGL — — ANSI D CCL -0 104-021 22.0"x34.0" v DFTR DES CHKD APPD C 9 11 DES: MGL DFTR: JTTD CHKD: APPD: REVISION B -E -F PIPE AS REQUIRED PROVIDE TYPE 1 GEOTEXTILE UNDER STONE 6" MIN MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH SEDIMENT, CLEAN OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE DETAIL 1 SCALE: NOT TO SCALE 0103-003 0103-009 0103-010 0103-012 0103-023 SILT FENCE FABRIC INSTALLED TO SECOND WIRE FRON GALVANIZED WOVEN WIRE FIELD FENCE, 14 GAUGE WITH 6" M VERTICAL STAY SPAM 6"X6" MAX MESH SPACII GRADE SPACING: 8' OC MAX W/WIRE FENCE 6' OC MAX EXTRA STRENGTH EXTRA STRENGTH FILTER FABRIC NEEDED WITHOUT WIRE MESH FABRIC- HARDWARE ABRIC-HARDWARE CLOTH 19 GAUGE WITH 1/4" SPACING MSN STEEL POST �, MP (1.25 LB/LIN FT STEEL-51FT MIN LENGTH) 3' MIN STEEL POST 4' MAX (1.25 LB/LIN FT STEEL - 5FT MIN HARDWARE CLOTH LENGTH) MEDIAN 8" DIA RIPRAP MAX: 1'-6" HIGH FLO\N 6" MAX SPACING GENERAL NOTES: 1. SEDIMENT FILTER OUTLET AND HARDWARE CLOTH SHALL BE 16 INCHES HIGH BUT NO TALLER THAN 18 INCHES. 2. HARDWARE CLOTH SHALL BE ANCHORED TO THE STEEL POSTS SECURELY USING APPROPRIATE ANCHORS. HARDWARE CLOTH SHALL BE KEYED A MINIMUM OF 12 INCHES IN LENGTH AND BACKFILLED PROPERLY AS SHOWN IN ABOVE DETAIL. 3. POST SHALL BE NO MORE THAN 4 FEET APART. 4. SITE OUTLETS AT ANY POINT WHERE SMALL CONCENTRATED FLOW IS ANTICIPATED AND AT THE DIRECTION OF THE INSPECTOR. MAINTENANCE NOTES: 1. WASHED STONE (#57) TO BE REMOVED AND REPLACED ONCE IT BECOMES CLOGGED WITH SEDIMENT. 2. SEDIMENT TO BE REMOVED WHEN ACCUMULATIONS REACH 113 HEIGHT OF SILT FENCE. 3. THE KEY TO FUNCTIONAL ROCK OUTLETS IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL. SILT FENCE (MAX) 1 L<� A 1 (MAX) 1.5 1.5 0 J LL. ROCK PLAN 0'-9" MIN PONDING HEIGHT STEEL POST 3' ABOVE GRADE (MAX) V7RUNOFF ��� 6" MIN THICK WASHED STONE (NCDOT #5 OR #57) FACE ON UPSTREAM SIDE SILT FENCE ROCK OUTLET DETAIL SCALE. NOT TO SCALE C7 `1 POST (1.25 LB/FT) ✓EN WIRE FABRIC FENCE FABRIC FILL SLOPE GRADE EXCAVATE TRENCH 8" DEEP X 4" WIDE BURY FABRIC 8" ALONG SIDE AND 4" ACCROSS THE BOTTOM =11 III r muiN I VIr-VV 1111 SIDE VIEW II II :III I- II II -III I- =11 1= I I I I III�I_I=„II �III�liil NOTES: 1. FABRIC, PER NCDEQ 6.62, TO BE ANCHORED IN THE TRENCH 8" DOWN AND 4" HORIZONTAL AND THEN BACKFILLED WITH EARTH AND COMPACTED. 2. POSTS TO BE MIN. OF 2'-0"IN GROUND. 3. BRACE POSTS WHERE NECESSARY. 4. ATTACH FABRIC WIRE AND POSTS WITH METAL RINGS ON PLASTIC ZIP TIES (50 LB MIN. TENSILE). 5. POST SHALL BE 5' (MIN.) STEEL "T" POST WEIGHING A MIN. 1.25 LB PER LF, MANUFACTURED WITH CLIPS. 6. WATER SHALL NOT BE IMPOUNDED TO A DEPTH GREATER THAN 1.5 FT AT ANY POINT ALONG FENCE, CONTRACTOR SHALL INSTALL A FENCE IMPOUNDMENT OUTLET, SEE DETAIL 3. MAINTENANCE NOTES: 1. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN EVENT AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 3. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. SILT FENCE DETAIL K SCALE: NOT TO SCALE 0103-003 0103-007 0103-011 0103-025 1/4 0103-004 0103-008 0103-022 0103-027 0103-022 0103-005 0103-009 0103-023 0103-028 0103-023 0103-010 0103-024 0105-005 0103-025 4" ROCK SECTION TRENCH WITH GRAVEL DESIGN TYPE DRAINAGE AREA APPROX WEIR LENGTH (L) MIN 1/4 1/2 ACRE 3.0 FT 0103-002 0103-002 0103-011 0 0103-004 0103-003 0103-024 0103-022 0103-005 0103-005 0103-025 0103-023 0103-006 0103-007 0103-026 0103-025 0103-007 0103-008 0103-027 0103-027 0103-010 0103-028 LOCATE FENCE OUTSIDE OF TREE BRANCH SPREAD IN PLAN 3'-0" HT ORANGE WARNING FENCE 2"X2" PT STAKE @ 8'-0" OC NOTE: TREE PROTECTION SHALL BE ORANGE SAFETY FENCE, 3FT MINIMUM HEIGHT. TREE PROTECTION FENCE DETAIL r SCALE: NOT TO SCALE 0103-002 0 0 0 0103-004 0103-024 0103-005 0103-025 0 0 0103-006 0 0 0103-026 (n 0103-007 N 111 0103-027 SF 0103-008 0103-028 0103-022 2' MIN SIDE VIEW PLAN CCL -0105-005 STRAW 10' MIN BALE (TYP) STAKE (2 PER BALE) Cn w dE 0 0 0 0 0 0 0 FLOW 0 0 0 0 0 0 0 0 1/8" DIA STEEL WIRE STAPLES (2 PER BALE) PLAN 10 MIL PLASTIC {} �� LINER a '--10 MIL PLASTIC LINER BINDING WIRE EXISTING GRADE GENERAL NOTES: w_1 1. FOR GENERAL NOTES SEE CCL -0100-004. FOR DRAWING INDEX SEE CCL -0100-001, FOR ABBREVIATIONS SEE CCL -0100-002 FOR LEGEND AND SYMBOLS SEE CCL -0100-003. WOOD OR V u METAL STAKESJ STRAW (2 PER BALE) NATIVE MATERIAL BALE (OPTIONAL) SECTION A NOTE: INSTALL CONCRETE WASHOUT A MINIMUM OF 50' FROM DRAINAGE FEATURES. IF 50' MINIMUM DISTANCE CANNONT BE MAINTAINED, INSTALL SECONDARY PERIMETER CONTAINMENT. CONCRETE WASHOUT DETAIL SCALE: NOT TO SCALE 0103-022 C K `TrrL POST (1.25 LB/FT) SEN WIRE FABRIC F FENCE FABRIC STEEL POST (1.25 LB/FT)- -SF- B/FT)--SF- -SF- -SF- SF - TITLE AUXILIARY SPILLWAY EROSION AND SEDIMENT CONTROL DETAILS FOR CEDAR CLIFF IDF &SPILLWAY UPGRADE SCALE: AS NOTED DES: MGL PRELIMINARY DUKE DWG TYPE: DGN DFTR: JTTD NOT FOR ENERGY JOB N0: 10060948 CHKD: CONSTRUCTION DATE: FILENAME: CCL -0105-005. DGN APPD: OR DWG SIZE DRAWING NO. REVISION HDR Engineering, Inc. of the Carolinas License Number: F-0116 RECORDING A ISSUED FOR BIDS. CL MGL - - ANSI D CCL_p 105-005 A 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 22.0"x34.0" v PE SEAL N0. DATE REVISION DFTR DES CHKD APPD INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 8 9 1 0 I I I I I I I M -A N GRADE SEE NOTE 1 FLOW `� _ _ p III -1 1=1 ill - =1 1II` III=III-111- -I I I I I T -I 1I- -1 _I I-1 I- (n N 111 - 1IT1111- 1 SII EXCAVATE TRENCH 8" DEEP X 4" WIDE SF III�IBURY FABRIC 8" ALONG SIDE AND 4" �== III�IIi ACCROSS THE BOTTOM III=III=III= 2' MIN SIDE VIEW PLAN NOTE: 1. J -HOOKS TO BE CONSTRUCTED WITH ONE CONTINUOUS LENGTH OF SILT FENCE FABRIC. MAINTENANCE NOTES: 1. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 2. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN EVENT AND TO REDUCE PRESSURE ON THE FENCE, TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT, 3. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, SILT FENCE J -HOOK DETAIL SCALE: NOT TO SCALE 0103-003 0103-005 0103-023 0103-007 0103-025 0103-010 0103-027 0103-011 TITLE AUXILIARY SPILLWAY EROSION AND SEDIMENT CONTROL DETAILS FOR CEDAR CLIFF IDF &SPILLWAY UPGRADE SCALE: AS NOTED DES: MGL PRELIMINARY DUKE DWG TYPE: DGN DFTR: JTTD NOT FOR ENERGY JOB N0: 10060948 CHKD: CONSTRUCTION DATE: FILENAME: CCL -0105-005. DGN APPD: OR DWG SIZE DRAWING NO. REVISION HDR Engineering, Inc. of the Carolinas License Number: F-0116 RECORDING A ISSUED FOR BIDS. CL MGL - - ANSI D CCL_p 105-005 A 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 22.0"x34.0" v PE SEAL N0. DATE REVISION DFTR DES CHKD APPD INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 8 9 1 0 I I I I I I I M -A i -E -F 2" X 2" WOOD STAKES OR 1.25 #/FT STEEL POST 2' SPACING (TYPICAL) CONTINUOUS ALONG TUBE 2 3 4 5 6 7 8 0 3�1 J ILL. SEDIMENT TUBE INSTALLATION SEDIMENT TUBE SPACING SLOPE MAX. SEDIMENT TUBE SPACING LESS THAN 2% 150 -FEET 2% 100 -FEET 3% 75 -FEET 4% 50 -FEET 5% 40 -FEET 6% 30 -FEET GREATER THAN 6% 25 -FEET SEDIMENT TUBES - GENERAL NOTES: 1. SEDIMENT TUBES MAY BE INSTALLED ALONG CONTOURS, IN DRAINAGE CONVEYANCE CHANNELS, AND AROUND INLETS TO HELP PREVENT OFF-SITE DISCHARGE OF SEDIMENT -LADEN STORMWATER RUNOFF. 2. SEDIMENT TUBES ARE ELONGATED TUBES OF COMPACTED GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBER, OR HARDWOOD MULCH. STRAW, PINE NEEDLE, AND LEAF MULCH -FILLED SEDIMENT TUBES ARE NOT PERMITTED, 3. THE OUTER NETTING OF THE SEDIMENT TUBE SHOULD CONSIST OF SEAMLESS, HIGH-DENSITY POLYETHYLENE PHOTODEGRADABLE MATERIALS TREATED WITH ULTRAVIOLET STABILIZERS OR A SEAMLESS, HIGH-DENSITY POLYETHYLENE NON -DEGRADABLE MATERIAL. 4. SEDIMENT TUBES, WHEN USED AS CHECKS WITHIN CHANNELS, SHOULD RANGE BETWEEN 18 INCHES AND 24 INCHES DEPENDING ON CHANNEL DIMENSIONS. DIAMETERS OUTSIDE THIS RANGE MAY BE ALLOWED WHERE NECESSARY WHEN APPROVED. 5. CURLED EXCELSIOR WOOD, OR NATURAL COCONUT PRODUCTS THAT ARE ROLLED UP TO CREATE A SEDIMENT TUBE ARE NOT ALLOWED. 6. SEDIMENT TUBES SHOULD BE STAKED USING WOODEN STAKES (2 -INCH X 2 -INCH) OR STEEL POSTS (STANDARD "U" OR "T" SECTIONS WITH A MINIMUM WEIGHT OF 1.25 POUNDS PER FOOT) AT A MINIMUM OF 48 INCHES IN LENGTH PLACED ON 2 -FOOT CENTERS. 7. INSTALL ALL SEDIMENT TUBES TO ENSURE THAT NO GAPS EXIST BETWEEN THE SOIL AND THE BOTTOM OF THE TUBE. MANUFACTURER'S RECOMMENDATIONS SHOULD ALWAYS BE CONSULTED BEFORE INSTALLATION. 8. THE ENDS OF ADJACENT SEDIMENT TUBES SHOULD BE OVERLAPPED 6 INCHES TO PREVENT FLOW AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT. 9. SEDIMENT TUBES SHOULD NOT BE STACKED ON TOP OF ONE ANOTHER, UNLESS RECOMMENDED BY MANUFACTURER. 10. EACH SEDIMENT TUBE SHOULD BE INSTALLED IN A TRENCH WITH A DEPTH EQUAL TO 1/5 THE DIAMETER OF THE SEDIMENT TUBE. 11, SEDIMENT TUBES SHOULD CONTINUE UP THE SIDE SLOPES A MINIMUM OF 1 FOOT ABOVE THE DESIGN FLOW DEPTH OF THE CHANNEL. 12, INSTALL STAKES AT A DIAGONAL FACING INCOMING RUNOFF. NOTES: 1. CHECK DAMS MAY BE USED IN SLOPING DITCHES OR CHANNELS TO SLOW VELOCITY OR TO CREATE SEDIMENT TRAPS. 2. ENSURE THAT MAXIMUM SPACING BETWEEN DAMS STAKES PLACED PLACES THE TOE OF THE UPSTREAM DAM AT THE AT 2' MINIMUM SAME ELEVATION AS THE DOWNSTREAM DAM (SEE SPACING PROFILE BELOW). 3. A AND B ARE AT EQUAL ELEVATIONS. NCDOT CLASS B RIPRA "ill:_ PLAN SYMBOL SEDIMENT TUBES - INSPECTION & MAINTENANCE: 1. THE KEY TO FUNCTIONAL SEDIMENT TUBES IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL, 2. REGULAR INSPECTIONS OF SEDIMENT TUBES SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24 HOURS AFTER EACH RAINFALL EVEN THAT PRODUCES 1/2 INCH OR MORE OF PRECIPITATION. 3. ATTENTION TO SEDIMENT ACCUMULATIONS IN FRONT OF THE SEDIMENT TUBE IS EXTREMELY IMPORTANT. ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY MONITORED AND REMOVED WHEN NECESSARY. 4. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 113 THE HEIGHT OF THE SEDIMENT TUBE. 5. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED. 6. LARGE DEBRIS, TRASH, AND LEAVES SHOULD BE REMOVED FROM IN FRONT OF TUBES WHEN FOUND. 7. IF EROSION CAUSES THE EDGES TO FALL TO A HEIGHT EQUAL TO OR BELOW THE HEIGHT OF THE SEDIMENT TUBE, REPAIRS SHOULD BE MADE IMMEDIATELY TO PREVENT RUNOFF FROM BYPASSING TUBE. 8. SEDIMENT TUBES SHOULD BE REMOVED AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN COMPLETELY STABILIZED. PERMANENT VEGETATION SHOULD REPLACE AREAS FROM WHICH SEDIMENT TUBES HAVE BEEN REMOVED. SEDIMENT TUBE DETAIL SCALE. NOT TO SCALE q MAXIMUM SPACING B =III=III_ =III=III_III_111_111=111_111=11=111=111=111_ 111_111=III= PROFILE ul-ul=ul -� p1_I11-1N- 12" OF #57 Alnnn_r 1n1ncul7'n cTnnlC I ILI LI\ VLVIII SECTION A ill ��� r; ���r���•�1 ��+ � mWI ail-� �.►�+� SIT 'v/t'�r�► FILTER CLO I11�_III-111II I1I I,I1 1111=111-111= A ELEVATION (LOOKING UPSTREAM) MAINTENANCE: 1. INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2" OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. 2. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. 3. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. ROCK CHECK DAM DETAIL r SCALE: NOT TO SCALE 0103-007 0103-012 0103-022 0103-025 0103-026 0103-027 NCDOT CLASS B RIPRAP - 12" OF #57 NCDOT WASHED STONE FLOW NON -WOVEN GEOTEXTILE FABRIC MAINTENANCE NOTES: 1. INSPECT AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT (AS DEFINED BY NCDEQ) AND REPAIR IMMEDIATELY, 2, SEDIMENT TO BE REMOVED WHEN ACCUMULATIONS REACH 1/3 OF HEIGHT OF BERM. 3. REMOVE AND REPLACE NCDOT #5 OR #57 WASHED STONE WHEN IT BECOMES CLOGGED WITH SEDIMENT. GRAVEL FITLER BERM DETAIL SCALE: NOT TO SCALE 0103-008 0103-028 COMPACTED SOIL --,- 2' MIN CCL -0105-007 NOTES: 1. CONSTRUCT TEMPORARY DIVERSION AS SPECIFIED IN THE DIVERSION DITCH TABLE ON CCL -0105-012 WHERE DEPTH, SIDE SLOPE, BASE WIDTH AND PROPOSED LINING ARE PROVIDED, USE THE ABOVE DETAIL FOR DESIGN SPECIFICATIONS NOT NOTED IN THE TABLE OR WHERE ADDITIONAL TEMPORARY DIVERSION DITCHES MAY BE NEEDED BUT NOT IDENTIFIED. SEED AND MULCH BERM. 2. SIDE SLOPES SHALL NOT EXCEED A 5:1 (H:V) SLOPE IN AREAS WHERE VEHICLES MUST CROSS, 2:1 SLOPE (MAX) IN ALL OTHER AREAS. 3. ALL DIVERSION DITCHES SHALL BE VEGETATED AND MAINTAINED TO HAVE A FULL STAND OF TALL FESCUE GRASS COVER. WHERE GRASS COVER IS NOT PROVIDED, THE AREAS SHALL BE RESEEDED OR REPAIRED TO MAINTAIN FULL COVER OR PROVIDE OTHER COMPARABLY PERFORMING DITCH LINING, TEMPORARY DIVERSION DITCH DETAIL SCALE: NOT TO SCALE COMPOST SOCK 3" FLOW- AREA TO BE - - - PROTECTED "�I i 1=I I EI 11-1I EI 11=1 I EI 11=1I --'Mi!�II -' JAI=111=i - =III III-III=III=11- - '_ •_ _ 2,> X 2$' STAKES SECTION B WOOD MULCH OR COMPOST TO ' 1/2 HEIGHT OF LOG F /I I_, I I ITIS -1 � IITI-11 _ WI "P3117i 1=1 = I UNTRENCHED INSTALLATION 31' COMPOST SOCK FLOW AREA TO BE =1ir�TEIT1-1�1-I�,,,_„_ • PROTECTED _-�IIII�gi1=11gIL=11L=11 L= • ' -"-"'-III=111=IIITIII-III I 2" X 2" STAKES SECTION G TRENCH INTO GROUND 4" MIN GENERAL NOTES: M_1 1. FOR GENERAL NOTES SEE CCL -0100-004. FOR DRAWING INDEX SEE CCL -0100-001. FOR ABBREVIATIONS SEE CCL -0100-002 FOR LEGEND AND SYMBOLS SEE CCL -0100-003, NOTE: THIS APPLICATION MAY NOT BE USED WITH COMPOST SOCKS SMALLER THAN 12", ENTRENCHED INSTALLATION 0 _J MULCH OR COMPOST LL WORK FOR UNTRENCHED SOCKS w AREA w COMPOST SOCK AREA TO BE PROTECTED PLAN NOTES: 1. INSTALL COMPOST SOCKS ALONG LEVEL CONTOUR PERPENDICULAR TO STORMWATER FLOW TO ASSIST IN DISSIPATING LOW CONCENTRATED FLOW INTO SHEET FLOW AND REDUCING RUNOFF VELOCITY. 2. COMPOST SOCKS SHALL BE A MINIMUM OF 12" DIAMETER UNLESS OTHERWISE NOTED. 3. STAKES SHALL BE MADE OF OAK OR OTHER DURABLE HARDWOOD. 4. PLACE COMPOST SOCKS END TO END AND JOIN ENDS SLEEVING ONE SOCK END INTO ANOTHER. 5. IN ORDER TO PREVENT WATER FLOWING AROUND THE ENDS OF THE COMPOST SOCK, THE ENDS OF THE SOCK MUST BE CONSTRUCTED POINTING UPSLOPE SO THE ENDS ARE AT A HIGHER ELEVATION. A MINIMUM OF 10 LINEAR FEET AT EACH END PLACED AT AN ANGLE OF 30° IS RECOMMENDED. MAINTENANCE: INSPECT COMPOST SOCKS WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT (AS DEFINED BY NCDEQ). REMOVE ACCUMULATED SEDIMENT AND ANY DEBRIS. THE COMPOST SOCK MUST BE REPLACED IF CLOGGED OR TORN. IF PONDING BECOMES EXCESSIVE THE SOCK MAY NEED TO BE REPLACED WITH A LARGER DIAMETER OR A DIFFERENT MEASURE. THE SOCK NEEDS TO BE REINSTALLED IF UNDERMINED OR DISLODGED. THE COMPOST SOCK SHALL BE INSPECTED UNTIL LAND DISTURBANCE IS COMPLETE AND THE AREA ABOVE THE MEASURE HAS BEEN PERMANENTLY STABILIZED. COMPOST SOCK DETAIL r5 SCALE: NOT TO SCALE 0103-002 0103-004 0103-024 0103-005 0103-025 0103-007 0103-027 0103-022 PRELIMINARY NOT FOR F)l CONSTRUCTION OR HDR Engineering, Inc. of the Carolinas License Number: F-0116 RECORDING I A I ISSUEFD FOR BIDS. 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 PE SEAL N0. DATE INCHES 1 2 3 TENTHS 10 20 30 4 5 6 7 I 1 1 1 TITLE AUXILIARY SPILLWAY EROSION AND SEDIMENT CONTROL DETAILS FOR CEDAR CLIFF IDF & SPILLWAY UPGRADE DUKE SCALE: AS NOTED DES: MGL DWG TYPE: DGN DFTR: JTTD ENERGYP' JOBNO:10060948 CHKD: FILENAME: CCL-0105-007.DGN APPD: DWG SIZE DRAWING NO. REVISION JTTD MGL - - ANSI D 22.0"x34.0" CCL -0105-007 A REVISION DFTR DES CHKD APPD 8 9 10 I I I M -A D'1 -E -F 2 3 La (FT) 4 5 6 7 8 D50 RIPRAP SIZE (IN) ' W2 - 11.5 - - NOTES: 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE SHOWN ON PLANS. 2. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF :1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 3. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1. 5. ALL SUBGRADE FILL FOR STRUCTURE TO BE COMPACTED TO 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY OR TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. 6. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED, IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 7. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON UNLESS OTHERWISE SHOWN. 8. TYPE 1 GEOTEXTYLE FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO PLACEMENT OF RIPRAP. 9. ANY DISTURBED AREA FROM END OF APRON TO RECEIVING CHANNEL MUST BE STABILIZED. END OF FLARED SECTION NATURAL GRADE 0 % SLOPE IN 1'-6" MIN � \ TYPE 1 GEOTEXTILE FILTER FABRIC LAP (IFN ELEVATION % NOTE: MINIMUM H=2/3 PIPE DIAMETER T (THICKNESS) T = 1. X DMAX GEOTEXTILE FILTER FABRIC SECTION B NOTE: USE USDA NOMOGRAPH FROM NC SEDIMENT AND EROSION CONTROL MANUAL. OUTLET La (FT) W1 (FT) W2 (FT) *T (IN) H (IN) D50 RIPRAP SIZE (IN) HW Al 10.0 11.5 4.5 13.5 12 6 HW A2 16.0 18.0 6.0 13.5 16 6 *D50 (SEE FIG 8.06 A&B "NC SEDIMENT AND EROSION CONTROL MANUAL" DMAX = 1.5 * D50 T = 1.5 * DMAX T(MIN) = 10" RIPRAP APRON AT PIPE OUTFALL DETAIL SCALE: NOT TO SCALE 0103-022 SILT FENCE AS NEEDED FILTER MEDIA (SEE NOTE 2) /--- PUMP FLOW VEGETATIVE BUFFER I NOTES: 1, PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS OF FILTER MEDIA SHALL BE PROVIDED TO THE EROSION CONTROL INSPECTOR FOR APPROVAL AND USE. DISCHARGE FROM FILTER MEDIA SHALL MEET OR EXCEED THE PROVISIONS OF THE CLEAN WATER ACT. 2, ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER MEDIA PRESSURE RATING. 3, FILTER MEDIA MAY BE, BUT NOT LIMITED TO, SAND MEDIA FILTRATION DEVICES, RATED FILTER FABRIC BAGS OR POLYMER BASED DEWATERING PRACTICES. 4, PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM OF POND. EROSION CONTROL DEWATERING DETAIL 3 SCALE: NOT TO SCALE 0105-001 TEMPORARY FLEXIBLE HOSE SEDIMENT BAG TOP OF BANK (TIE TO TEMPORARY (SEE NOTE 2) CTA SII 17Cn nl ITI CTN FILTER FABRIC TYPE 2 SEDIMENT REMOVAL DEVICE APPROXIMATE BASE FIOW WATER TOP OF BANK TrLAnnnnnv OSE �T BAG TEMPORARY STABILIZED OUTLET SECTION FLOW IMPERVIOUS DIKE (SEE nInTU Q\ 0 APPROXIMATE BASE '7 - FLOW WATER LEVEL 0 (6") BASE FLOW + 1' (2' MIN) SANDBAG/STONE _ (CLASS A) (SEE NOTE 8) F W WORKING AREA I/R`IMPERVIOUS MEMBRANE TYPE 2 IMPERVIOUS DIKE DETAIL NOTES: 1. SEDIMENT FILTER BAG FABRIC SHALL BE GEOTEXTILE MANUFACTURED FROM WOVEN POLYPROPYLENE OR POLYMER MATERIAL. SEDIMENT FILTER BAG FABRIC MAY BE MADE FROM RECYCLED POLYMER MATERIALS. POLYMER MATERIALS SHALL NOT CONTAIN BIODEGRADABLE FILLER MATERIALS AND SHALL CONFORM TO THE REQUIREMENTS IN ASTM DESIGNATION: E 204 3. THE SEDIMENT FILTER BAG SHALL BE 10'X12'X1.5' (MIN) AND SHALL BE COMPLETE WITH LIFTING LOOPS AND DUMP STRAPS ATTACHED AT THE BOTTOM TO FACILITATE EMPTYING OF THE SEDIMENT FILTER BAG. 4. LIFTING STRAPS SHOULD BE PLACED UNDER THE DEWATERING SEDIMENT FILTER BAG TO FACILITATE REMOVAL AFTER USE. 5. PLACE THE DEWATERING SEDIMENT FILTER BAG ON A LEVEL STABILIZED AREA OVER DENSE VEGETATION/STRAW, OR GRAVEL (IF INCREASED DRAINAGE SURFACE AREA IS NEEDED). 6. INSERT DISCHARGE HOSE FROM PUMP INTO THE DEWATERING SEDIMENT FILTER BAG A MINIMUM OF 6 INCHES AND TIGHTLY SECURE WITH ATTACHED STRAP TO PREVENT WATER FROM FLOWING OUT OF THE UNIT WITHOUT BEING FILTERED. 7. REPLACE THE UNIT WHEN 1/2 FULL OF SEDIMENT OR WHEN SEDIMENT HAS REDUCED THE FLOW RATE OF THE PUMP DISCHARGE TO AN IMPRACTICAL RATE. 8. REMOVE THE UNIT AND SEDIMENT FROM ENVIRONMENTALLY SENSITIVE AREA AND WATERWAYS. AT THE APPROVED DISPOSAL SITE, OPEN OR SLIT THE UNIT, REMOVE SEDIMENT AND GRADE SMOOTHLY INTO EXISTING TOPOGRAPHY. DISPOSE OF THE DEWATERING SEDIMENT FILTER BAG, AT AN APPROPRIATE RECYCLING OR SOLID WASTE FACILITY. DEWATERING SEDIMENT FILTER BAC DETAIL SCALE: NOT TO SCALE 0105-001 i -iii -iii -iii -iii -iii -iii -iii -iii SILT FENCE ill=III-III_ III -III =III=III-III-III-III=III SEE DETAIL TIN I -llllllilll�ll'-�Ilill11_ 2\CCL-0105-005 d)1111= . 10" (TYP)3 =111111; SOIL/SEDIMENT II�11= 3 '' X 1 P F STOCKPILE AREA z '11 �I-�I11¢ 11iQ :2 '.rc111- 1 -i1 -i WATER LEVEL - - f� - -11-111-111- ORIGINAL GROUND SURFACE I1 NOTES: I` 1. SILT FENCE TO EXTEND AROUND ENTIRE PERIMETER OF STOCKPILE, OR IF STOCKPILE AREA IS LOCATED ON/NEAR A SLOPE, THE SILT FENCE IS TO EXTEND ALONG CONTOURS OF THE DOWN -GRADIENT AREA, 2. IF STOCKPILE IS TO REMAIN FOR MORE THAN 14 DAYS, TEMPORARY STABILIZATION LOW POINT MEASURES MUST BE IMPLEMENTED. 3. SILT FENCE SHALL BE MAINTAINED UNTIL STOCKPILE AREA HAS EITHER BEEN REMOVED OR PERMANENTLY STABILIZED. 4. THE KEY TO FUNCTIONAL TEMPORARY STOCKPILE AREAS IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL. 5. TEMPORARY STOCKPILE TO HAVE A MAXIMUM HEIGHT OF 15' TEMPORARY STOCKPILE E&SC DETAIL 4 SCALE: NOT TO SCALE 0105-001 PRELIMINARY NOT FOR F)l CONSTRUCTION OR HDR Engineering, Inc. of the Carolinas License Number: F-0116 RECORDING 440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 INCHES 1 2 3 TENTHS 10 20 30 4 5 6 1 1 1 TEMPORARY ` FLEXIBLE HOSE DEWATERING PUMP 1 I I J� I CCL -0105-008 IREv. B GENERAL NOTES: 1. FOR GENERAL NOTES SEE CCL -0100-004. FOR DRAWING INDEX SEE CCL -0100-001. FOR ABBREVIATIONS SEE CCL -0100-002. FOR CCL LEGEND AND SYMBOLS SEE -0100-003. V CLEAN WATER B PUMP -AROUND PUMP /-- TEMPORARY FLEXIBLE HOSE EXISTING CHANNEL IMPERVIOUS DIKE (SEE DETAIL, THIS DRAWING) l� TEMPORARY STABILIZED SEDIMENT REMOVAL DEVICE 6, OUTLET SEE DETAIL 4/CCL-0105-009 (SEE DETAIL 2 THIS i DRAWING) PLAN VIEW NOTES: 1. ALL CHANNEL WORK INVOLVING EXCAVATION SHALL BE PERFORMED IN DRY CONDITIONS OR IN CHANNEL SECTIONS ISOLATED BY IMPERVIOUS DIKES AND KEPT DE -WATERED. 2. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED THE SAME WORKING DAY. 3. PUMP -AROUND PUMP AND HOSE SHALL ADEQUATELY CONVEY BASEFLOW (CONTRACTOR TO VERIFY). DE -WATERING PUMP SHALL ADEQUATELY DE -WATER THE WORKING AREA AT THE DOWNSTREAM IMPERVIOUS DIKE. 4. GRAVITY -BASED GEOTEXTILE BAG FILTERS SHALL BE USED TO COLLECT SILT AND SEDIMENT FROM WORK AREA DE -WATERING. THE DESIGNER MAY SPECIFY A SEDIMENT BASIN OR OTHER SEDIMENT CONTROL MEASURE IN LIEU OF A SEDIMENT BAG IF SITE CONDITIONS ARE FAVORABLE (I.E. - TREES WILL NOT BE IMPACTED FOR BASIN EXCAVATION, ETC.). 5. EFFLUENT FROM CLEAN WATER PUMP AROUND MAY BE DISCHARGED DIRECTLY INTO STABILIZED OUTLET (NO SEDIMENT REMOVAL DEVICE REQUIRED). 6. A STABILIZED OUTLET SHALL BE USED TO CONTROL THE EFFLUENT FROM ALL PUMPING OPERATIONS, THE DESIGNER SHALL SPECIFY ALL MATERIALS AND DIMENSIONS ASSOCIATED WITH STABILIZED OUTLETS, 7. FILTER FABRIC AS SPECIFIED BY THE DESIGNER SHALL BE USED UNDERNEATH ALL STONE/RIP RAP PLACED FOR SEDIMENT BAGS, STABILIZED OUTLETS, SPLASH PADS. 8. IMPERVIOUS DIKES SHALL BE CONSTRUCTED TO ISOLATE THE IN -STREAM WORKING AREA, AN IMPERVIOUS FABRIC MEMBRANE AND SAND BAGS OR STONE, AS SPECIFIED BY THE DESIGNER, SHALL BE USED TO CREATE THE DIKES, 9. THE WORK SEQUENCE IN PUMP -AROUND OPERATIONS PROCEEDS TYPICALLY AS FOLLOWS: A. INSTALL SEDIMENT REMOVAL DEVICE AND TEMPORARY STABILIZED OUTLETS AT THE DOWNSTREAM END OF WORKING AREA. B. INSTALL PUMP -AROUND PUMP AND FLEXIBLE HOSE, C. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING (CLEAN WATER) DOWNSTREAM TO STABILIZED OUTLET. D. INSTALL DOWNSTREAM IMPERVIOUS DIKE AND DE -WATERING PUMP. E. PERFORM CHANNEL WORK IN ACCORDANCE WITH THE PLANS IN THE WORKING AREA. F. DE -WATER THE WORKING AREA (AS NEEDED) INTO THE SEDIMENT REMOVAL DEVICE AND TEMPORARY STABILIZED OUTLET. G. UPON COMPLETION OF WORK, REMOVE ANY SEDIMENT ACCUMULATION BEHIND IMPERVIOUS DIKES. H. REMOVE DOWNSTREAM AND THEN UPSTREAM DIKES AND ALL PUMPS AND HOSE. I. SEED AND MULCH ALL DISTURBED AREAS PER THE PLANTING PLAN. PUMP -AROUND DETAIL 1� SCALE: NOT TO SCALE 0103-012 TITLE AUXILIARY SPILLWAY EROSION AND SEDIMENT CONTROL DETAILS FORCEDARCLIFF IDF & SPILLWAY UPGRADE DUKE SCALE: AS NOTED DES: MGL DWG TYPE: DGN DFTR: JTTD ENEnt"'If �' JOB DATEN0:10060948 CHKD: FILENAME: CCL-0105-008.DGN APPD: DWG SIZE DRAWING NO. REVISION B 6/26/2019 ADDED PUMP AROUND DETAIL JTTD MGL A 3/13/2019 ISSUED FOR BIDS. JTTD MGL - - ANSI D 22.0"x34.0" CCL -0105-008 B PE SEAL NO. DATE REVISION DFTR DES CHKD APPD 7 8 9 10 I I I I