Loading...
HomeMy WebLinkAbout20170920 Ver 1_USACE As-Built Review_20190625From: Browning, Kimberly D CIV USARMY CESAW (US) To: Tuawell, Todd J CIV USARMY CESAW (US); Hauot, Mac; Davis, Erin B; Wicker, Henry M Jr CIV USARMY CESAW jUSl; McLendon, C S CIV USARMY CESAW (US); Wells. Emily N; Wilson, Travis W.; Bowers, Todd; Matthews, Monte K CIV USARMY CESAW (US); Higgins, Karen; David. E. Bailev2(alusace.army.mil Cc: worth (a)restorationsystems.corn; Crocker. Lindsay Subject: [External] Notice of NCDMS As -Built Review / Heron Site / Alamance County / SAW -2017-01471 (UNCLASSIFIED) Date: Tuesday, June 25, 2019 12:28:13 PM Attachments: Heron ReauesttoAmendMP.Ddf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam e.nc.gov> CLASSIFICATION: UNCLASSIFIED Folks, The below referenced FINAL As -Built Report review has been requested by NCDMS. Per Section 332.8(0)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15 -day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you intend to request a site visit prior to the initial credit release. Comments provided after the 15 -day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final As -Built and initial credit release. The final Heron As -Built report (baseline) associated drawings is posted to the SharePoint IRT for your review. The 30% Credit Release debit ledger is forthcoming. Please note that there is a request to modify the Mitigation Plan as part of this submittal (SEE ATTACHED). The memo provides details, along with the As -Built report: Name: Heron RFP: 16-006990 RFP Issued: 9/16/2016 Project#: 100014 River Basin: Cape Fear CU#: 03030002 County: Alamance Mitigation Plan Assets -5,264 SMU Amended Mitigation Plan Assets -5,293 SMU Provider: Restoration Systems DMS Project Manager: Lindsay Crocker lindsay.crocker@ncdenr.gov<mailto:lindsay.crocker@ncdenr.gov> Link to Heron As -Built on SharePoint: httns://ncconnect.shareDoint.com/sites/dea ext/dwm in/AsBuilt%20ReDort%20%20Drawine/Forms/AllItems.asnx? web= 1&id=%2Fsites%2Fdeq ext%2Fdwm_irt%2FAsBuiIt%20Report%20%20Drawing%2FHeron%20100014 15 -Day Comment Start Date: June 25, 2019 15 -Day Comment Deadline: July 11, 2019 45 -Day Credit Release Approval Deadline: August 10, 2019 *NOTE: If a site visit is request by the IRT, comments are due 15 days after the site visit is complete. Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 I Wake Forest, NC 27587 I 919.554.4884 x60 BUILDING STRONG (r) CLASSIFICATION: UNCLASSIFIED