HomeMy WebLinkAbout20170920 Ver 1_USACE As-Built Review_20190625From: Browning, Kimberly D CIV USARMY CESAW (US)
To: Tuawell, Todd J CIV USARMY CESAW (US); Hauot, Mac; Davis, Erin B; Wicker, Henry M Jr CIV USARMY CESAW
jUSl; McLendon, C S CIV USARMY CESAW (US); Wells. Emily N; Wilson, Travis W.; Bowers, Todd; Matthews,
Monte K CIV USARMY CESAW (US); Higgins, Karen; David. E. Bailev2(alusace.army.mil
Cc: worth (a)restorationsystems.corn; Crocker. Lindsay
Subject: [External] Notice of NCDMS As -Built Review / Heron Site / Alamance County / SAW -2017-01471 (UNCLASSIFIED)
Date: Tuesday, June 25, 2019 12:28:13 PM
Attachments: Heron ReauesttoAmendMP.Ddf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as
an attachment to report.spam@nc.gov<mailto:report.spam e.nc.gov>
CLASSIFICATION: UNCLASSIFIED
Folks,
The below referenced FINAL As -Built Report review has been requested by NCDMS. Per Section 332.8(0)(9) of
the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period
of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15 -day comment
deadline shown below. When providing comments please indicate if your concerns are great enough that you intend
to request a site visit prior to the initial credit release. Comments provided after the 15 -day comment deadline
(shown below) may not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT
along with District Engineer's intent to approve or disapprove this Final As -Built and initial credit release.
The final Heron As -Built report (baseline) associated drawings is posted to the SharePoint IRT for your review. The
30% Credit Release debit ledger is forthcoming. Please note that there is a request to modify the Mitigation Plan as
part of this submittal (SEE ATTACHED). The memo provides details, along with the As -Built report:
Name: Heron
RFP: 16-006990
RFP Issued: 9/16/2016
Project#: 100014
River Basin: Cape Fear
CU#: 03030002
County: Alamance
Mitigation Plan Assets -5,264 SMU
Amended Mitigation Plan Assets -5,293 SMU
Provider: Restoration Systems
DMS Project Manager: Lindsay Crocker lindsay.crocker@ncdenr.gov<mailto:lindsay.crocker@ncdenr.gov>
Link to Heron As -Built on SharePoint:
httns://ncconnect.shareDoint.com/sites/dea ext/dwm in/AsBuilt%20ReDort%20%20Drawine/Forms/AllItems.asnx?
web= 1&id=%2Fsites%2Fdeq ext%2Fdwm_irt%2FAsBuiIt%20Report%20%20Drawing%2FHeron%20100014
15 -Day Comment Start Date: June 25, 2019
15 -Day Comment Deadline: July 11, 2019
45 -Day Credit Release Approval Deadline: August 10, 2019
*NOTE: If a site visit is request by the IRT, comments are due 15 days after the site visit is complete.
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 I Wake Forest, NC 27587 I 919.554.4884 x60
BUILDING STRONG (r)
CLASSIFICATION: UNCLASSIFIED