Loading...
HomeMy WebLinkAbout20160979 Ver 1_Initial Credit Release_20190626Strickland, Bev From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent: Wednesday, June 26, 2019 9:00 AM To: Bradley Breslow; Jamey Mceachran Cc: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Merritt, Katie; Davis, Erin B; Wilson, Travis W.; Bowers, Todd Subject: [External] SAW -2016-01985 Poplar Creek Mitigation Site Initial Credit Release Attachments: SAW -2016-01985 Poplar Creek Initial Credit Release.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> Good morning Brad/Jamey, Attached is the initial credit release letter for the: SAW -2016-01985 / EBX Neuse I, LLC / Neu -Con UMBI / Poplar Creek Mitigation Site / Johnston County Please let me know if you have any questions. Thank you, Sam Samantha Dailey Regulatory Project Manager U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 22 Samantha.j.dailey@usace.army.mil 1 Regulatory Division/ 1200A DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 Action ID No. SAW -2016-01973 June 26, 2019 Re: Initial Credit Release associated with Neu -Con Umbrella Mitigation Bank, Poplar Creek Mitigation Site Mr. Brad Breslow EBX-Neuse I, LLC 302 Jefferson Street, Suite 110 Raleigh, North Carolina 27605 Dear Mr. Breslow: This correspondence is in reference to the Neu -Con Umbrella Mitigation Bank, Poplar Creek Mitigation Site, located between 538-848 Lee Youngblood Loop, Smithfield, Johnston County, North Carolina; within the Poplar Creek watershed in the Upper Neuse Cataloging Unit (03020201). The purpose of this letter is to confirm the initial release of credits for this mitigation site. Pursuant to the Mitigation Banking Instrument (LIMBI) entitled, Neu -Con Umbrella Wetland Mitigation and Stream Restoration Bank, approved April 2, 2001 and amended April 10, 2009; the site-specific Poplar Creek Final Mitigation Plan dated November 2018 and approved February 11, 2019, 15 percent of the mitigation site's total restoration and enhancement stream credit shall be available for sale immediately upon completion of all of the following: a. Approval of the final mitigation plan (February 11, 2019); b. Issuance of the 404 permit authorization for construction of the site (February 11, 2019); c. Delivery of the executed financial assurance documents as described in Section III (F) of the UMBI and Section 13, Page 45 of the Poplar Creek Mitigation Site Final Mitigation Plan, dated November 2018 and approved February 2019; and d. Recordation of the Corps -approved site protection mechanism described in Section III (G) of the LIMBI, and Appendix C of the Poplar Creek Mitigation Site Final Mitigation Plan, dated December 2018 and approved February 2019, including a title opinion covering the property. By copy of this correspondence, we confirm that you have satisfied the above requirements for the initial credit release; and 588.9 stream mitigation units (SMU's), constituting 15 percent of the mitigation site's total restoration and enhancement stream credits (3926 SMUs), are now available for sale. Thank you for your interest in restoring and protecting waters of the United States. If you have questions regarding this letter, please contact Samantha Dailey, Raleigh Regulatory Field Office at Samantha.J.Dailey(c,usace.army.mil or telephone (919) 554-4884, Extension 22. Sincerely, LASTINGERJAM Digitally signed by LASTI NGER.JAM ES.C.136364 ES.C.136364240 2400 Date: 2019.06.26 08:43:14 0 -04'00' Jean B. Gibby Chief, Raleigh Regulatory Field Office Regulatory Division Electronic Copies Furnished: NCIRT Distribution List