HomeMy WebLinkAbout310776_Plan of Action_20181126�aAAW" aid i l 3 -775 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number, 31-776 . County: Duplin Facility Name. Leslie Whitted 1 Certified Operator Name: Leslie Whitted Operator Number: AWA16602 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon Lagoon Lagoon 3 Lagoon Lagoon 5 1 N 18 2 Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges_ X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. _Operation will be partially or fully depopulated. `Attach a complete schedule with corresponding animal -units and dates fro depopulation "if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Leslie Whitted Phone: 919-344-2449 Facility Owner/Mana r (print) Date: 11/20/2018 Facility Owner/Manager (signature) i 0 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 296.0 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6, Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 296.0lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO. NOT LIST FIFI nS TO WHICH Pam CANNnT RF Appl u=n nl 1PINn TNlc-an nav aFainn o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' new 12 Wheat 1.13 96.50 109.0 Sept -April new 13 Wheat 2.16 125.40 270.9 Sept -April new 14 Wheat 3.00 125.40 376.2 Sept -April new -15 Wheat 2.66 1,25.40 333.6 Sept -April ,state current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1089.7 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 296.0 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section Ill) = 1089.7 lb. PAN y. Overall PAN balance (w - x) _ -794 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and, haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NAKKA I 1 V t: Irrigation onto existing spray fields will continue as weather and field conditions permit. Wheat has not been I but grower expects to be able to plant by next week, if weather permits. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): La oon 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 89300 1ftz e. line c/12 x line d x 7.48 gallons/ft3 55664 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design I 180 days g. volume of waste produced according to structural design 121058.2 Jft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k: (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/24/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 �lft3 52091.7 ft3 215860 gallons 1.09 Ibs/1000 gal. 296.0 Ibs. PAN Sheetl IRRIGATION SYSTEM DESIGN PARAMETERS Landowner/Operator Name: Leslie Whiffed - Whitted-King 1 Farm (old Halls Marsh) County:.Duplln Address: 2147 NC 55 East AWS310776 Mt. Olive, NC 28365 Pull Add't. #2' Date: 11/20/2018 Telephone: 919-344-2449 (via aluminum pipe) Table 1 - Field Specifications Approximate Maximum Useable Size Field of Field Ni imhar (aerQcl RN TvnA RInnn a/ Crnn(s) Maximum Maximum Application Application per Irrigation Rate Cycle (In/hr) (inches) Comments Sh eet2 TABLE 2 - Travelling Irrigation Gun Settings Make, Model and Type of Equipment: Cadman 3000 Traveler w/Nelson 150 Big Gun Field No. Travel Application TRAVEL LANE Wetted Nozzle Operating Operating and Speed Rate Effective Effective Diameter Diameter Pressure Pressure Arc Hvdrant No fft/mini (in/hr i Wirlth(ft 1 1 annth(ft) (fact\ M—h-1 r)-" ., Sh eet3 TABLE 3 - Solid Set Irrigation Gun Settings Make, Model and Type of Equipment NIA Operating Parameters Field No Wetted Hydrant Spacing(ft) Application Nozzle _ Operating Operating and Number of Diameter Along Between Rate Diameter Pressure Time Line NO. Yi arants Met ri eiines Ni elines Inmr inches) at Gun si at H drant(hr.) Comments -Acres per zone TOTAL 0.00 Sheet4 TABLE 4 - Irrigation System Specifications Traveling Solid Set Irrigation Gun Irrigation Flow Rate of Sprinkler m 160 0 Operating Pressure at Pump (psi) #DIV/0! #DIV/0! Design Precipitation Rate in/hr 0.31 0.00 Hose Length feet 960 xxxxxXXX Type of Speed Compensation Mechanical XXXXXXXX Pump Type PTO, Engine, Electric Engine En ine Pump Power Requirement h #DIV/0! #DIV/0! TABLE 5 - Thrust Block Specifications 6" 4" 2" THRUST BLOCK THRUST BLOCK THRUST BLOCK LOCATION AREA (sq. ft. AREA (sq. ft.) AREA (sq. ft.) 90 degree bend 8.8 4.3 1.1 Dead End 6.2 3.0 0.8 Tee 4.4 2.1 0.5 Gate Valve 6.2 3.0 0.8 45 degree bend 4.7 2.3 0.6 Page 1 Sheet5 IRRIGATION SYSTEM DESIGNER �y�' • Q Name: Micah Kevin Weston CID Company: Murphy -Brown, LLC dba Smithfield Hog Production w Z r Address: 2822 Hwy 24 West, P.O. Box 856 Warsaw, NC 28398 �02Qj9 , Phone: (9'10) 293-3434 l �' Required. Documentation' ,S�o�,IN ;'+ The following details of design and materials must accompany all irrigation designs: 1. A scale drawing of the proposed irrigation system which includes hydrant locations, pipelines, thrust block locations and buffer areas where applicable. 2. Assumptions and computations for determining total dynamic head and horsepower requirements. 3. Computations used to determine all mainline and lateral pipe sizes. 4. Sources and/or calculations used for determining application rates. 5. Computations used to determine the size of thrust blocks and illustrations of all thrust block configurations required in the system 6. Manufacturer's specifications for the irrigation pump, traveler and sprinkler(s). 7. Manufacturer's specifications for the irrigation pipe and/or USDA-NRCS standard for IRRIGATION WATER CONVEYANCE. 8. The information required by this form are the minimum requirements. It is the responsibility of the designer to consider all relevant factors at a particular site and address them as appropriate. 9. Irrigation pipes should not be Installed in lagoon or storage pond embankments without the approval of the designer. NOTE: A buffer strip of 25' or wider must be maintained between the limits of the irrigation system and all perennial streams and surface waters per NC Statutes. Sheet6 Narrative of Irrigation System Operation This design is for an addition of pulls to an existing facility. The acres were calculated based on the equipment specified, field calibrations and the charts created by NCSU for calculating Area Allowances for Hard Hose Traveler Systems. This irrigation system is designed to use above -ground aluminum pipe. The system is designed to accommodate the flow velocities, flow rates and pressure requirements associated with a Cadman 3000 traveler with a Nelson Big Gun sprinkler. The design of the traveler system requires the use of a 1.08" ring nozzle in the gun. Each pull has a specific arc setting and travel speed which must be used to achieve the desired application. This information is given In Table 2 of this design. A detail of the traveler setup points and pull layout is also included. The suction assembly for the pump to be used should be a minimum of 6" aluminum. A pressure gauge should be installed on the discharge side of the pump where it can be seen during start up of the system. Refer to owner's manual and irrigation deafer for information on maintenance, winterization, and operation of system. s Sheet7 CALCULATIONS Sprinkler Specifications - Sprinkler Type: Nelson 150 Nozzle Size: 1.08 inches Sprinkler Pressure: 50 psi Flowrate(GPM)-. 160 gpm Wetted Diameter.- 280 feet ` Reflects field measurement Lane Spacinas Desired Spacing (%): 70 % Design Spacing(feet): 196 'PVC irrigation pipe normally comes in 20' pieces, so°round to the nearest multiple of 20. Actual Spacing (feet): 180 feet Actual Spacing (%): 64 % Application Rate Application Rate =(96.3xFlowrate)/(3.1415x(_9xradi, us) squared) Design App. Rate = 0.31 In/hr 300 degree arc = 0.37 in/hr 330 degree arc = 0.34 in/hr 220 degree arc = 0.51 in/hr 180 degree arc = 0.62 in/hr Traveller Speed Travel speed = 1.605 x Flowrate / Desired application amount x Lane Spacing Desired-app. (in.) = 0.5 inches 360 degree arc = 2.85 ft/min 300 degree arc = 3.42 ft/min 330 degree arc.= 3.11 ft/min 220 degree arc = 4,57 ft/min 180 degree arc = 5.71 ft/min Mainline Velocity Velocity = .408 x Flowrate / pipe diameter squared feet/sec." "For buried pipelines, velocity should be below 5 feet per second Pipe size: inches Velocity-- #tDIV/01 ft/sec. Page 1 Sheet8 (2) Whitted Farm; AWS310776 Acreage Calculations 4/06/2018 Pulls 12-15 11/20/2018 Width_ Len th Acres Total Acres Start End Stop End _ Total _ Pull #TjR) Sft l 6midsection) (midsection) ac. _- ac. _ Pull Acres 9 199.2 329 1.505 1.5_05 0.408 0.338 2.2_5 10 180 532 _ 2.198 _ 2.198 0.316 2.91 11 199.2 820 3.750 3.750 __0.394 0.408 0.338 4.50 12 199.2 84 0.384 0.384 , 0.408 0.338 1.1_3 13 180 352 1.455 1.455 0.394 I 0 316 2.16 14 132 230 0.697 2.288 0,394 0.316 3.00 180 385 1.591 0.000 0.000 0.000 0.00 _ 15 199.2 0 419 0 1.916 0.000 1.916 0.000 _ 0.408 0.000 - _ _ 0.338 0.000 2.66 000 0 0 0.000 0.000 0.000 0.000 0.00 0 0 0.000 0.000 0.000 0.000 0.00 0 0 0.000 0.000 0.000 0.000 0.00 0 0 0.000 i 0.000 0.000 - 0.000 a.bo 0 0 0.000 0.000 o-000 0.000 0.00 o a a.000 o.000 0.000 0.000 0.00 o 0 0.000 0.000 0.000 0 000 I _ 0.00 0 0 0 000 0.000 0.000 0.000 0.06 -- 0 - - 0.000 - 0.000 - 0.000 0.000 0.00 0 .0- 0 0.000 0.000 J 0.000 0.000 i 0.00 - - - -0-- 0 0.000 0.000 0. boo' • 0:000 1 0.00 0 0- o._aoo 0.000 0.000 1 0.000- -- 0.00 _ I Total Acres 18.61 Page 1 Wh itted—Ki_n g, 1 Farm (Old Halls Marsh Farm) AWS310776 Irrigation Add't.. Specifications: Pulls Cadman 3000 Traveler �'80 Nelson 150 Big Gun' w/1.08" Nozzle @ 50 PSI 160 GPM; 280' WD Q CV 180' Lone Spacing (TYP) (Via above —ground pipe) 0)/ N / 0. To.v ap >J " n OY INMI 11 /20/2018 — Added pulls 12-15 A 66 c. 16 13 Ac. Existing Pulls (1-6) GRAPHIC SCALE 300 0 150 300 600 ( IN FEET ) 1 inch, = 300 fL Existing Pulls Sotbodw V From Property Lbe 2W From Raddwxw 7- BARWICK AG SERVICES, LLC Clinton, NC 28328 910-386-1000 Irrigation Equipment Field Calibration Form Location: Date of Field Calibration: Flow Meter Serial Number: j (�YY) G.ZG 0-2- 203 Equipment Number: ' Measured ring size: �.S inches Is ring size Witbi.n 0.01" of original manufactured size? _ZL Yes or No. If not replace ring. Pressure Gauge Readings At Pump: At Traveler; psi psi (if applicable) At Sprinkler/Gun:;` psi Expected Flow Rate (From manufacturers chart): '! S GPM Measure Flow Rate (from flow meter): b, - GPM Flow rate variance greater than 10% Yes No ,.' Expected Wetted Diameter (from the wettable acres determination) Measured Wetted Diameter: Wetted diameter variance greater than 15% &/or measured flow variance greater than 10%: Yes No V'" If Ties, then contact a technical specialist or irrigation dealer for assistance, enter work order number: And/or explain findings; Calibrator: , & (Signature) Irrigatiou Equipment Field Cahbracon Form 4-1-03.doe Rttention Period. 3 year Original 4/1103 SpecificationsReception Area Tract Field Irrigated Soil Ist Crop Timeto IstCrop IstCrop LbsN/Ac Lbs N Total lbs N Acreage Type Code Apply Yield lbs N/Unit Re§lduaf /Ac Utilized MZ