Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
310776_Plan of Action_20181211
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-776 Facility Name: Leslie Whitted 1 Certified Operator Name: Leslie Whitted County: Duplin Operator Number: AWA16602 1. Current liquid level(s) in inches as measured from the current liquid level in the1agoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon Lagoon Lagoon 3 Lagoon Lagoon 5 1 N 16 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic,and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the. attached Plan of Action, and to the best of my knowledge and ability, the information Is . accurate and correct. Leslie Whitted Facility Owner/Manager (print) Facility Owner/Manager (signature) 1�� -. 3 ,-1, 1 Phone: 919-344-2449 Date: 12/11 /2018 �f i II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 417.3 lb PAN 2. Structure ID: line m = lb PAN 3 Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = . lb PAN 6. Structure ID: fine m = lb PAN n.lines 1+2+3+4+5+6= 417.3lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT I-IRT FIFI r)_q Tn Wlalru DAKI rnmkin-r MCAnfiI InM Miamm... �� o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (fb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u application window' new new 12 13 Wheat Wheat 1.13 2.16 85.00 110.00 96.1 237.6 Sept -April Sept -April new 14 Wheat 3.00 110.00 330.0 Sept -April new 15 Wheat 2.66 110.00 292.6 Sept -April .,.. mow,I �V U1 1u111y aNNnUdLIU,1 uate ui next crop application beginning elate for available receiving crops during 30 day draw down period. v. Total -PAN available for all fields (sum of column t) = 956.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (fine n from section II) = 417.3 lb. PAN PoA (30 Day) 2/21/00 x. ' Crop's remaining PAN balance (line v from section III) = 956.3 lb. PAN y. Overall PAN -balance (w - x) _ -539 -lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions -permit. Wheat has not been planted but grower expects to be able to plant by next week, if weather permits. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): La oon 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0inches c. line b - line a (inches in red zone) = 3.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 89300 ft2 e. line c/12 x line d x 7 48 gallons/ft3 166991 gallons 3 Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121058.2 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4.-Total PAN to be land applied during draw down period I. current waste analysis dated 10/24/20 88 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 ©ft3 52091.7 ft3 215860 gallons 1.09 Ibs/1000 gal. 417.3 Ibs. PAN