HomeMy WebLinkAbout310048_Plan of Action_2018092031-48 J' ) 80.?5_jg q-20 _/ E; PLAN. OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-48 County: Duplin Facility Name: Stockinghead Creek Certified Operator Name: Bret Brown Operator Number: AWA 100151.2 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 2 3 4 5 Spillway(Y or N): Level(inches): 14 14 14 15 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/20/2019 I hereby certify that 11have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Derek Brown Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: 910-271-1305 Date: _ 9/20/2018 4. II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Stockinghead #1 line M = 875.9 lb PAN 2. Structure ID: Stockinghead #2 line m = 888.4 lb PAN 3 Structure ID: Stockinghead #3 line m = 778.2 lb PAN 4. Structure ID: Stockinghead #4 line m = 3028.6 lb PAN 5. Structure ID: "Stockinghead #5 , line m = 929.5 lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 6600.6lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD_ o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 1398 1A-813 Grazed Bermuda 38.07 1649.82 62808.6 10/20/2018 1398 9B Grazed Fescue 4.92 150.00 738.0 7/31/2019 1398 11-15 Grazed Bermuda 23.35 1166.07 27227.7 10/20/2018 3286 23-25B Grazed Bermuda 22.17 1218.75 27019.7 10/20/2018 3286 26-30 Soybeans 21.52 640.00 13772.8 9/15/2018 3286 1-1-1-5 Soybeans 103.83 495.29 51426.0 9/15/2018 3286 P1 Grazed Bermuda 99.61 22.25 2216.3 10/20/2018 1398 P2 Grazed Bermuda 29.97 80.03 2398.5 10/20/2018 1397 P3 Grazed Fescue 30.07 51.42 1546.2 7/31/2019 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 189153.9 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 6500.6 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 189153.9 lb. PAN y. Overall PAN balance (w - x) _. 182.653 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. We will begin pumping as soon as field conditions permit. We took on roughly 25+ inches of rain during Florence. All lagoons were in good shape leading up to the storm. We notified the inspector on 9-17-18. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Stockinghead #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 14.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 5.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 72000 ft2 _ e. line c/12 x line d x 7.48 gallons/ft3 224400 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 94947 ft3 h. current herd # 3100 certified herd # 3381 actual waste produced = current herd # x line g = 87056 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x '30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/4/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) A 0 ft3 45208 ft3 164889 gallons 2.25 Ibs/1000 gal. 875.9 Ibs. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Stockinghead #2 2.. Current liquid volume in 25 yr./24-hr. storm storage & structural freeboard a. current liquid level according to marker 14.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 5.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 72956 ft2 e. line c/12 x line d x 7.48 gallons/ft3 227380 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 94947 ft3 h. current herd # 3200 certified herd #1 3381 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design- J. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during drawdown period I. current waste analysis dated 7/4/20,18 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 89864 ft3 0 ft3 44479 ft3 167481 gallons 2.25 Ibs/1000 gal. 888.4 Ibs. PAN l PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Stockinghead #3 2. Current liquid volume in 25 yr./24 hr. storm storage & structural, freeboard a. current liquid level according to marker 14.0 inches b. designed 25yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 5.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) I 71476 fC e. line c/12 x line d x 7.48 gallons/ft3 222767 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 78912 ft3 h. current herd # 4200 certified herd #1 3756 actual waste produced =. current herd # x line g = 88240 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design r _ k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/4/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 fti 43633 1ft3 164402 gallons 2.01 Ibs/1000 gal. 778.2 Ibs. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Stockinghead #4 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 15.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 4.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 300304 ft2 e. line c/12 x line d x 7.48 gallons/ft3 748758 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 415247 ft3 h. current herd # 15200 certified herd #1 14786 actual waste produced = current herd # x line g = 426874 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/4/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Oft3 175177 ft3 750557 gallons 2.02 Ibs/1000 gal. 3028.6 Ibs. PAN PoA (30 Day) 2/21/00 t' 0 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Stockinghead #5 I 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 165204 ftz e. 'line c/12 x line d x 7.48 gallons/ft3 102977 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 254945 ft3 h. current herd # 7900 certified herd #1 9078 actual waste produced = current herd # x line g = 221862 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 7/4/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 96369 ft3 396728 gallons 1.86• Ibs/1000 gal. 929.5 Ibs. PAN PoA (30 Day) 2/21 /00