HomeMy WebLinkAbout310390_Plan of Action_201901241-2a« oo02AR - 31-390
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31_ - _390 County: Duplin.
Facility Name: Earth Right Farms, Inc. — Goshen Farm
Certified Operator Name: _Stephen M Williamson Operator # 19128
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point'on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon NamelIdentifier (ID): _1_
Spillway (Yes or No)
Level (inches):
_No
• _18
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
_ Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 01-27-2019,
I hereby certify that I have reviewed the Information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Earth Right Farms, Inc. / Stephen M Williamson
PoA Cover Page 2121100
Phone: _(910)296-1513
Jan. 22, 2019
. PLAN OF ACTION ToA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN, PERIOD
1. TOTAL PAN TO BE -LAND APPLIED PER WASTE STRUCTURE
.1. Structure Name/identifier (ID): _31-390 1.
2. Current liquid volume in 25 yr./24 hr. storm storage &-structural freeboard
a. current liquid level according to marker
inches
�18
b. designed 25 yr./24 hr. storm & structural freeboard
19
inches
c. line b - line a (inches -in red zone) =
1
inches
d. top of dike surface area according to design
_52796
ftz
(area at below structural freeboard elevation)
e. line c x line d x 7.48 aQ Ilo3 s =
_33022
gallons
12 ft
3. Projected volume of waste liquid produced during draw -down period
f. temporary storage period according to structural design
_180T
days
g. volume ofwaste produced according to structural design
71384
ft3
h. actual waste produced = current herd # x line g =
35692
ft3•
certified herd #
i. volume of wash water according to structural design
0
ft3
j. excess rainfall over evaporation according to design
32667_
ft3
k. (lines h + i +i). x 7.48 x 30 days =
_85220_
gallons
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/2112018
2.10
Ib/1000 gal.
m. (lines e + k) x line 1 =
_248
lb PAN
1000
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE
-II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM -STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PLAN OF
ACTION-(PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
PoA (30 Day) 2121100 1
1.
structure ID: 1
line m =
I
248 lb PAN
2.
structure -ID: __
line m =
lb PAN
3.
structure ID:
line m =
lb PAN
4.
stnicture, ID: ..
line m =
lb PAN
5.
structure ID:
line m =
lb PAN
6.
structure ID:
line m =
lb PAN
n.
Ilnesl+2+3+4+5+6 =
248
lb PAN
111. TOTAL PAN 'BALANCE -REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
a�Rlnn- •
nn NnT 1 ICT FIFI ria Tn WHlcla PAN CAN
NnT RF APPLIED DURING T141S 30 DAY PERIOD_
o. tract #
-p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(lb/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(Ibs.)
column r x s
u.
application
window'
3879
1
SG
1.7.5
10
17
Se -Ma
3879
2
SG
2.54
50
127
Sep -May
3879
3
SG
2.94
0
0
Sep -May
3879 ,
4
BH
.89
30
26
Sep -May
3879
5
BH
.46
20
9
Sep -May
3879
6
BH
.84
40
33
Sep -May
3879
7
BH
1.45
15
21
Sep -May
73874
1 HW
BH
.87
50
43
Sep -May
73874
2HW
BH
4.9
20
98
Se o -Ma
73874
3HW
BH
1.08
50
54
Sep -May
73843
2
-BP
9.89
25
247
Sep -May
State current crop ending application date or next crop -application beginning date for available receiving
crops during 30 day drawn down period
V. Total PAN available for all fields (sum of column t) _ �676 lb. PAN
IV. FACILITY~'$ POA OVERALL PAN BALANCE'
PoA (30 Day) 2121100 2
w. Total PAN to be land applied (line n from section 11) = 248 lb. PAN
x. Crop's remaining PAN balance (line v from section 111) = 675 lb. PAN
y. Overall PAN balance (w - x) = T<4.27> lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump S haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance: If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE: .
We have been working diligently to recover from Florence but the recent weather pattern has
made it difficult to make significant gains. David Powell was notified on 1122119 via email of
the lagoon level and a copy forwarded also to Morella Sanchez -King.
PoA (30 Day) 2I21/00 3