Loading...
HomeMy WebLinkAbout310390_Plan of Action_201901241-2a« oo02AR - 31-390 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31_ - _390 County: Duplin. Facility Name: Earth Right Farms, Inc. — Goshen Farm Certified Operator Name: _Stephen M Williamson Operator # 19128 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point'on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon NamelIdentifier (ID): _1_ Spillway (Yes or No) Level (inches): _No • _18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. _ Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 01-27-2019, I hereby certify that I have reviewed the Information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Earth Right Farms, Inc. / Stephen M Williamson PoA Cover Page 2121100 Phone: _(910)296-1513 Jan. 22, 2019 . PLAN OF ACTION ToA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN, PERIOD 1. TOTAL PAN TO BE -LAND APPLIED PER WASTE STRUCTURE .1. Structure Name/identifier (ID): _31-390 1. 2. Current liquid volume in 25 yr./24 hr. storm storage &-structural freeboard a. current liquid level according to marker inches �18 b. designed 25 yr./24 hr. storm & structural freeboard 19 inches c. line b - line a (inches -in red zone) = 1 inches d. top of dike surface area according to design _52796 ftz (area at below structural freeboard elevation) e. line c x line d x 7.48 aQ Ilo3 s = _33022 gallons 12 ft 3. Projected volume of waste liquid produced during draw -down period f. temporary storage period according to structural design _180T days g. volume ofwaste produced according to structural design 71384 ft3 h. actual waste produced = current herd # x line g = 35692 ft3• certified herd # i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 32667_ ft3 k. (lines h + i +i). x 7.48 x 30 days = _85220_ gallons line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 12/2112018 2.10 Ib/1000 gal. m. (lines e + k) x line 1 = _248 lb PAN 1000 REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE -II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM -STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PLAN OF ACTION-(PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES PoA (30 Day) 2121100 1 1. structure ID: 1 line m = I 248 lb PAN 2. structure -ID: __ line m = lb PAN 3. structure ID: line m = lb PAN 4. stnicture, ID: .. line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. Ilnesl+2+3+4+5+6 = 248 lb PAN 111. TOTAL PAN 'BALANCE -REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN a�Rlnn- • nn NnT 1 ICT FIFI ria Tn WHlcla PAN CAN NnT RF APPLIED DURING T141S 30 DAY PERIOD_ o. tract # -p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 3879 1 SG 1.7.5 10 17 Se -Ma 3879 2 SG 2.54 50 127 Sep -May 3879 3 SG 2.94 0 0 Sep -May 3879 , 4 BH .89 30 26 Sep -May 3879 5 BH .46 20 9 Sep -May 3879 6 BH .84 40 33 Sep -May 3879 7 BH 1.45 15 21 Sep -May 73874 1 HW BH .87 50 43 Sep -May 73874 2HW BH 4.9 20 98 Se o -Ma 73874 3HW BH 1.08 50 54 Sep -May 73843 2 -BP 9.89 25 247 Sep -May State current crop ending application date or next crop -application beginning date for available receiving crops during 30 day drawn down period V. Total PAN available for all fields (sum of column t) _ �676 lb. PAN IV. FACILITY~'$ POA OVERALL PAN BALANCE' PoA (30 Day) 2121100 2 w. Total PAN to be land applied (line n from section 11) = 248 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 675 lb. PAN y. Overall PAN balance (w - x) = T<4.27> lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump S haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance: If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: . We have been working diligently to recover from Florence but the recent weather pattern has made it difficult to make significant gains. David Powell was notified on 1122119 via email of the lagoon level and a copy forwarded also to Morella Sanchez -King. PoA (30 Day) 2I21/00 3