Loading...
HomeMy WebLinkAbout710031_Plan of Action_20181116v PLAN OF ACTION(Poa) FOR -HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 71-31 County: Tender Facility Name: Hall V& 2 ; Certified Operator Name: Donald Hall Operator Number: 16453 , 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 2 Spillway(Y or N): no no Level(inches): 12 12 a- 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one;or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day -Plan of Action is attached. Agronomic balance is within acceptable range: Waste is -to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste' to a site not covered in the facility's CAWMP. ` Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted -facility, provide facilitylnumber, lagoon freeboard levels_and herd population for the receiving facility 3. Earliest possible date to begin land application of -waste: 11/16/2018 j I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. { { Donald Hall- Phone: 910-520-355 Facility Owner/Manager (print) f ��- Date: Facility Owner/Manager-(signature) I il PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL'FACILITIES 30 DAY DRAW DOWN PERIOD z I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): lHall 1 2,-Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 12.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 ,inches c. line b - line a (inches in red zone) = 7.0 inches d. top of dike surface area according to design freeboard 497083 ft i (area at below'structural elevation) ` e. line c/12 x line d x 7.48 gallons/ft3 2168939 gallons s 3. Projected volume of waste liquid produced during draw -down period f, temporary storage period according to structural design I 180 days g. volume of waste produced according to structural design 330480 ft3 h. current herd # 2448 certified herd #1 2448 actual waste produced = current herd # x line g = 330480 ft' certified herd # i. volume of wash water according to structural design �� ft3 j, excess rainfall over evaporation according to design 37188 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 458359 gallons, 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/1/20Lo 1.05 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 2758.7 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2121/00 i PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND,APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Hall 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 7 12.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19,0 inches c. line b - line a (inches in red zone) = 7.0 inches d. top,of dike surface area according to design (area at below structural freeboard elevation) 497083, ft2 e. line -c/12 x line d x 7.48 gallons/ft3 21�68939 gallons 3. Projected 'volume'of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 330480 ft3 h, current herd # 2448 certified herd # 2448 actual waste produced = current, herd # X line g = 530480_ ft° certified herd # i. volume of wash water according to structural design 0 ft3 j, excess rainfall over evaporation according to design 37188 ft3 k. (lines h t i + j) x 7.48'x 30 days/line f= _ 458359 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated '10/112018 1..07 Ibs/4000 gale m..((lines e + k)/1000).x line 1= 2811.2 Ibs. PAN e f REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00