HomeMy WebLinkAbout240012_Plan of Action_20190123PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 24-12
Facility Name: Phil Creech
Certified Operator Name: Phillip Creech
County, Columbus
Operator Number: 22379
1% Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of th'e spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
L1
N
14
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances -are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures.* A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Phil Creech
Facility Owner/Manager (print)
Phone: (910)647-6031
�t \t' c,,�Q,oti Date: 1/23/2019
Facility Owner/Manager (signature)
It
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Lagoon 1
line m =
883.6 lb PAN
2. Structure ID:
line m =
lb PAN
3. Structure ID:
line m =
lb PAN
4. Structure ID:
line m =
lb PAN
5. Structure ID:
line m =
lb PAN
6. Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 883.6lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
5
Small Grain
6.30
40.00
252.0
Sept -April
7
Small Grain
13.63
50.00
681.5
Sept -April
6
Small Grain
24.13
50.00
1206.5
Sept -April
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2140.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line in from section 11) = 883.6 lb. PAN
PoA (30 Day) 2/21/00
a
x. Crop's remaining PAN balance (line v from section 111) = 2140.0 lb. PAN
y. Overall PAN balance (W -:x) _ -1256 lb. PAN
Line-y must -show -as a deficit. If line y does not show as a,deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For.pump & haul and herd reduction options' recalculate new PAN
based -on new information. If new fields are'to be included as an option for lowering lagoon level, add these
fields to the PAN. balancer table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available, for pumping if needed.
The fields listed above are all optional fields in the waste plan. Remaining PAN is an estimate.
11 -
PoA (30 Day) 2/21/00
v
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): La oon 1
2. Current liquid volume in 25 yr.124 hr.. storm storage & structural freeboard
a. current liquid level according to marker 14.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 5.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 221960 ft2
e line c/12 x line d x 7.48 gallons/ft3 691775 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 25851 ft3
h. current herd # 3520 certified herd #1 3520
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 11 /20/201 8
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.,
(Click on the next Structure tab shown below) ,
PoA (30 Day) 2/21/00
25851 ft3
0 ft3
19891 667 ft3
57026 gallons
1.18 Ibs/1000 gal.
883.6 Ibs. PAN