Loading...
HomeMy WebLinkAbout310403_Plan of Action_2018121131 _ OcI3 PLAN OF'ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-403 County: Duplin Facility Name: Jerry Kennedy Farm Certified Operator Name: Jerry Kennedy Operator Number. AWA17235 1. Current liquid level(s) in inchep as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2- Lagoon 3 Lagoon 4 Lagoon 5 N 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information_ Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Jerry Kennedy Phone, Facility Owner/Manager (print) 6-p—�"V—(Date: Facility Owne Manager signature) 910-290-3052 n. a] II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 132.6 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID- line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 132.6lbPAN Ili. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RF APPI IFn nilIRINr, THIR 3f1 nAY PFRICIn o tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 70812 1A Small Grain 4.77 50.00 238.5 Sept -April 70812 6K Small Grain 2.74 50.00 137.0 Sept -April 70812 31D Small Grain 3.21 50.00 160.5 Sept -April 70812 3E Small Grain 2.09 50.00 104.5 Sept -April State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 640.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line in from section II) = 132.6 lb. PAN PoA (30 Day) 2/21/00 n .f x. Crop's remaining PAN balance (line v from section III) = 640.5 lb. PAN y. Overall PAN balance (w - z) _ 1 .508 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the over-all PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. - Irrigation onto. existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. M PoA (30 Day) 2/21/00 r G PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1_ Structure Name/Identifier (ID): Lagoon 1 2. Current liquid volume in 25 yr./24 hr storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d., top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3 Projected volume of waste liquid produced during draw down period 18.0 inches 19.0 inches 1.,0 inches 71002 ft2 44258 gallons f. temporary storage period according -to structural design 180 days g. volume of waste produced according to structural design 69101 ft3 h current herd # 1600 certified herd #1 2096 actual waste produced = current herd # x line g = 52749 ft' certified herd # i volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 41418 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 117395 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 11/7/2018 0.82 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 132.6 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00