Loading...
HomeMy WebLinkAbout710020_Plan of Action_20181213)41�6 0300 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 71-20 Facility Name: Makto1&2 County: Pender Certified Operator Name: Ray Register Operator Number: 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 2 Spillway(Y or N): N N Level(inches): 17 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXX ' Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance Is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ray Register Phone: 910-284-0822 Facility Owner/Manager (print) 0L" Ir`�_N_ .� Date: Facility w er/ nager (signature) . PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Lagoon #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 2.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 67326 ftZ e. line c/12 x line d x 7.48 gallons/fe 104916 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 46888 ft3 h. current herd # 2655 certified herd # 2640 actual waste produced = current herd # x line g = 47154 ft3 certified herd # i. volume of wash water according to structural design �0 ft3 j. excess rainfall over evaporation according to design 62040 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 136129 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/26/2018 0.81 Ibs/1000 gal. m. ((lines•e + k)/1000) x line 1 = 195.2 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon #2 New 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to -marker 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 2.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 816,318 ftz e. line c/12 x line d x 7.48 gallons/ft' 1272096 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 495,720 ft3 h. current herd # 377 certified herd # 880 actual waste produced = current herd # x line.g = 212371 fi' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/26/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 I� �l ft3 73,320 ft3 356161 gallons 0.64 Ibs/1000 gal. 1042.1 lbs. PAN i II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon#1 line m = 195.2 lb PAN 2. Structure ID: Lagoon #2 (New) line m = 1042.1 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5.+ 6 = 1237.3 lb PAN 111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN oCoinn nn k1nT I IeT n=t nc Tn VUMIru PAN rAMMnT RF APPI IFn MIRING THIS 3n DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u, application window' 7216 F1 Small Grain Overseed 7.78 41.53 323.1 10/15-3/31 7216 F2 Small Grain Overseed 12.96 41.46 537.3 10/15-3/31 7216 F3 Small Grain Overseed 5.19 41.52 215.5 10/15-3/31 7216 F4 Small Grain Overseed 15.83 43.44 687.7 10115-3/31 7216 F9 Small Grain Overseed 1.43 41.52 59.4 10115-3/31 7216 F10 Small Grain Overseed 13.48 41.52 559.7 10/15-3/31 'State current crop ending application date or next crop application beginning pate Tor avaiiaDie receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2382.6 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 1237.3 lb. PAN x. Crop's remaining PAN. balance (line v from section Ill) = 2382.6 lb. PAN y. Overall PAN balance (w - x) = -1145 lb. PAN PoA (30 Day) 2/21/00 Line y must show as a deficit. If line y does not show as a deficit, list course -of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to -be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. This farm has more pumping fields if necessary.Producer called on 12-12-18 to report high freeboard. This POA was completed by Jason Turner Pender SWCD on 12-13-18. Producer provided data for plan on 12-13-18. PoA (30 Day) 2/21/00