Loading...
HomeMy WebLinkAbout240112_Plan of Action_20181228 (2)PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 24-112 Facility Name: _ Donald Strickland County: Columbs Certified Operator Name: Jonathon Hayes Operator Number: 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 5 2. Check all applicable items XXX Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30, day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Jonathon Hayes (Manager) Facility Owner/Manager (print) , Phone: �`L r Date: 12/28/2018 Facility Owner/Manager (signature) II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 24-112 line I = 395733 gallons 2. structure ID: line I = gallons 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. lines + 2 + 3 + 4 + 5 + 6 = o. line n / 27154 = line I = gallons line I = gallons line 1= gallons line I = gallons 395733 gallons 14.57 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD 1,2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) W. maximu m applicat ion amount (inches 93855 A-1 Small Grain 2.80 50 0.5 1 93855 A-2 Small Grain 2.90 50 0.5 1 93855 A-3 Small Grain 3.10 50 0.5 1 93855 A-4 Small Grain 3.40 50 0.5 1 93855 B-1 Small Grain 1.00 50 0.5 1 93855 4 Small Grain 1.30 50 0.5 1 93855 2-5 Small Grain 2.50 50 0.5 1 93855 2-6 Small Grain 2.10 50 0.5 1 93855 B-2 Small Grain 1.20 50 0.5 1 93855 B-3 Small Grain 1.20 50 0.5 1 93855 B-4 Small Grain 1.30 50 0.5 1 x. total acres available during 5 day draw down (sum of column t) = 22.80 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE b Y. line o = 0.64 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recaicuiate new nydraunc ioad based on new intormation. I Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without run Fields are very wet. 2. Date and amount of last rainfall event? DATE: 1 12/28/18 AMOUNT: 1.00 inches 3. Dates of last waste application event per field: 2/3/2016 ff, etc.) 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in ine "n" at appropriate seasonal (i.e. winter) application rates within 5 days? Yes it is capable 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and a Shorter pumping times and lower applications will be used. Mr. Hayes called 12/27/2018 to self report his lagoon was in structure of 5 inches. This POA was created on 12/28/2018 by Sam Edwards Environmental Specalist/Division of Soil and Water Conservation. 3tion. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 24-112 2. Current liquid volume in structural freeboard a. current liquid level according to marker 5.0 inches b. designed structural freeboard zone 12.0 inches (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = 7.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 1 85800 Jft2 e. line c/12 x line d x 7.48 gallons/ft3 374374 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 1 180 days g. volume of waste produced according to structural design 1 105497 Ift3 h. current herd # 1600 certified herd #1 3200 actual waste produced = current herd # x line g = 52749 ft3 certified herd # i. volume -of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 50050 ft3 k. (lines h + i +j) x 7.48 x 5 days/line f = _ 21359 gallons 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 395733 gallons , REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab'shown below)