HomeMy WebLinkAbout310122_Plan of Action_20181219(04, 1 &VJ
PLAN OF ACTION (PoA) FOR.H'IGH FREEBOARD AT AN FACILITIES
30-DA1' DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 12/18/2018
1 Structure Name/Identifier (ID): E&B Farms Inc.(2) FN: 31-122
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 17.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 105716 ft2
e, line c/12 x line d x 7.48 gallons/W 131793 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 121058.2 ft3
h. current herd # 3672 certified herd # 3672
actual waste produced = current herd # x line g = 121058 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 11/15/2018
m. -((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE.STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Oft3
68750 ft3
236628 gallons
1.15 Ibs/1000 gal.
423.7 Ibs. PAN -,
0
PoA (30.Day) 2/21/00 12/19/2018
C
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: E&B Farms Inc.(1)
line m =
lb PAN
2.
Structure ID: E&B Farms Inc. (2)
line m =
423.7 lb PAN
3.
Structure ID: E&B Farms Inc. (3)
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
In. lines 1+2+3+4+5+6= 423.7lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD_ DO NOT LIST FIELDS TO WHICH PAN CANNOT RIP APPI IFn niIRIN[; THIS 3n nAv pFRlnn
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
2900
P1
Small Grain
3.04
40.00
121.6
Oct -March
P2
Small Grain
4.30
40.00
172.0
Oct -March
P3
Small Grain
6.72
40.00
268.8
Oct -March
P5
Small Grain
5.05
40.00
202.0
Oct -March
P6
Small Grain
2.49
40.00
99.6
Oct -March
P7
Small Grain
4.34
40.00
173.6
Oct -March
P9
Small Grain
2.43
40.00
97.2
Oct -March
P11
Small Grain
4.30
40.00
172.0
Oct -March
P16
Small Grain
4.02
40.00
160.8
Oct -March
P17
Small Grain
3.97
40.00
158.8
Oct -March
P18
Small Grain
4.00
40.00
160.0
Oct -March
P19
Small Grain
295
40.00
118.0
Oct -March
P20
Small Grain
3.15
40.00
126.0
Oct -March
State current crop ending application date or next crop_ application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2030.4 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 423.7 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 2030.4 lb. PAN
y. Overall PAN balance (w - x) = -1607 lb. PAN
PoA (30 Day) 2/21/00 12/19/2018
r
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Still having troubles getting lagoons down do heavy rains from Florance and heavy rains every week. Get
one lagoon of the three out of red and another goes in the red. Waste will be applied agronomically and
hydraulically as weather'permits.