HomeMy WebLinkAbout310122_Plan of Action_20181119Y )-lot 03 r PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 11/19/2018 1. Structure Name/Identifier (ID): E&B Farms Inc. 3 FN: 31-122 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard - a. current liquid level according to marker 17.0 inches ` b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard- elevation) 109512 ft2 e. line c/12 x line d x 7.48 gallons/ft3 136525 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121058.2 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft'j certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 66220 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 233473 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/24/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 1.19 Ibs/1000 gal. 440.3 Ibs. PAN PoA (30 Day) 2/21/00 11/19/2018 r -y II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: E&B Farms Inc.(1) line m = lb PAN 2. Structure ID. E&B Farms Inc. (2) line m = lb PAN 3. Structure ID: E&B Farms Inc. (3) line m = 440.3 lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 440.3lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application wndow' 2900 P1 Small Grain 3.04 50.00 152.0 Oct -March P2 Small Grain 4.30 50.00 215.0 Oct -March P3 Small Grain 6.72 50.00 336.0 Oct -March P5 Small Grain 5.05 50.00 252.5 Oct -March P6 Small Grain 2.49 50.00 124.5 Oct -March P7 Small Grain 4.34 50.00 217.0 Oct -March P9 Small Grain 2.43 5000 121.5 Oct -March P11 Small Grain 4.30 50.00 215.0 Oct -March P16 Small Grain 4.02 50.00 201.0 Oct -March P17 Small Grain 3.97 50.00 198.5 Oct -March P18 Small Grain 4.00 50.00 200.0 Oct -March P19 Small Grain 2.95 50.00 147.5 Oct -March P20 Small Grain 3.15 50.00 157.5 Oct -March 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2538.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 440.3 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 2538.0 lb. PAN y. Overall PAN balance (w - x) = -2098 lb. PAN PoA (30 Day) 2/21 /00 11 /19/2018 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Lagoon 3 still in red from hurricane Florance. Waste will be applied agronomically and hydraulically as weather permits. PoA (30 Day) 2/21/00 11/19/2018