Loading...
HomeMy WebLinkAbout310589_Plan of Action_20181220.� H 6o639 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILI Facility Number: 31-589 County: Duplin Facility.Name- Booty Branch Farms Inc. Certified operator Name: Steve M. Whitfield Operator Number: 18803 1. Current liquid level(s) In inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoonl Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: A B Spillway(Y or N). N N Level (inches). 13 13 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more strucl Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. r 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of vv to be pumped and hauled is reflected in section Ill tables. Included within this plan is z of the proposed sites with related facility numbers, number of acres and receiving croK information. Contact and secure approval from the'DWQ prior to transfer of waste to.E not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulati *if animals are to be moved to another permitted facility, provide facility number, lagoo freeboard levels and herd population for the receiving facility 3 Earliest possible date to begin land application of waste:.9/21/18 Weather permitting. hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Phone: _ 919-738-9110 Date: 12/2012018 N 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): JA 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 13.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 6 0 inches top of dike surface area according to design d (area at below structural freeboard elevation) 65000 fe e. line c/12 x lined x 7.48 gallons/ft3 243100 gallons 3. Projected volume of waste liquid produced during draw down penod f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 79152 ft3 h. current herd # 2420 certified herd # 2420 actual waste produced = current herd # x line g = 79152 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line i= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/18/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) a ©ft, 37917 ft3 145946 gallons 0.96 Ibs/1000 gal 373 Ibs. PAN PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): B 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 13 0 b. designed 25 yr.124 hr. storm & structural freeboard 19.0 c. line b - line a (inches in red zone) = 6.0 d. top of dike surface area according to design (area at below structural freeboard elevation) 58976 e. line c/12 x line d x 7.46 gallons/ft3 220570 3. Projected volume of waste liquid produced during draw down period f temporary storage period according to structural design 180 g. volume of waste produced according to structural design 79738 h. current herd # 2420 certified herd # 2420 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design Ic (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9118/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 PoA (30 Day) 2/21 /00 36166.7 AAAnc 0.94 7AA A t II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDIOR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID, A line m = 373.5 Ib PAN 2. Structure ID: B line m = 343.2 Ib PAN 3. Structure ID' line m = Ib PAN 4. Structure ID: line m = Ib PAN 5. Structure ID: line m = Ib PAN 6. Structure ID: line m = Ib PAN n. lines 4 +2 + 3 +4 +5 +6 = 716.6 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOn_ DO NOT LIST FIFI IDS TO 1NHir-w PAN r AKIKWIT RF APDI IRn ni ioimt,_ Tuic ,2n nAv nooinn 0. tract # p field # q. crop r. acres s. remaining IRR- 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 71617 4 Bermuda 2.10 83.00 174.3 MAR-OCT 71617 7 Bermuda 2.50 139.00 347.5 MAR-OCT 71617 1 Bermuda 2.20 101.001 222.2 MAR-OCT JUI an ncru� tbuiu Or cuiurlln L) IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) _ x. Crop's remaining PAN balance (line v from section Ill) y. Overall PAN balance (w - x) = I44.0 Ib. PAN 716.6 Ib. PAN 744.0 lb. PAN -27.4 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump& haul and herd reduction options, recalculate new PAN based on new information If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Called in to DWR on 9/17118.