Loading...
HomeMy WebLinkAbout710014_Plan of Action_20181219t 2, - 4. -1 � �D/9600z1-0 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number 71-14 County: Ponder Facility Name: Locklin Farms Certified Operator Name; " Ottls Cavanaugh Operator Number. 71* 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon NameAD: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 N 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section Ill tables. Included within this plan is a list of the proposed sites with related facifity numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. " _ Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates for depopulation T animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and hens population for the receiving facility 3. Earliest possible date to begin land application of waste: 1 hereby certify that 1 have reviewed the Information listed above and Included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate.and correct _ Ottis Cavenaugh Phone: 910-284-2416 a ' ity Ow�rr�r/Manager (print) Date: 12/14/2018 Facility Owner/Manager (' ature) In PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 20.0 inches c. line b - line a (inches in red zone) = 3.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 95250 ftZ e. line c/12 x line d x 7.48 gallonsflt' 178118 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 46888 ft3 h. current herd # 3500 certified herd # - 3672 actual waste produced = current herd # x line g = 44692 fe certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/16/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I. FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 Offs 62040 ft3 133059 gallons 0.99 Ibs/1000 gal. 308.1 Ibs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon#1 line m = 308.1 lb PAN 2. Structure ID: line m = -lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN- 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 308.1 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIFI nS TO WWIrH PANT rANMr1T RI= Aom mn nl IDIAI!_ -ruic qn r►wv ncmjr,n o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) L TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u, application window' 7046 Al Small Grain Overseed 4.07 50.00 203.5 10/1-3/31 A5&6 Small Grain Overseed 5.71 50.00 285.5 10/1-3/31 Acenter Small Grain Overseed 12.18 50.00 609.0 10/1-3/31 131-4 Small Grain Overseed 15.73 50.00 786.5 10/1-3/31 C1-4 Small Grain Overseed 18.34 50.00 917.0 10/1-3/31 D14 Small Grain Overseed 10.79 50.00 539.5 10/1-3/31 Mate current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3341.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied -(line n from section II) = 308.1 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 3341.0 Ib. PAN y. Overall PAN balance (w - x) _ .3033 lb. PAN PoA (30 Day) 2/21/00 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Information for POA was supplied by producer on 12/14/18. This POA was completed by Jason Turner Pender SWCD on 12/14/18.. PoA (30 Day) 2/21/00