HomeMy WebLinkAbout310870_Plan of Action_20181218PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-870 County: Duplin
Facility Name: Kenan Hog Farm
Certified Operator Name: Reginald Kenan Operator Number: AWA 22043
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
-Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Kenan
N
15
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered, in the facility's CAWMP. -
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number,.lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that 1 have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
-accurate and correct.
Reginald Kenan Phone: 910-289-2144
Facility Owner/Manager (print)
Date: 9%16/2018
Facil ner anager (signature)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Kenan Lagoon line m = 2067.5 lb PAN
2. Structure ID: line m = lb PAN
3. Structure ID. line m = lb PAN
4. Structure ID: line m = lb PAN
5. Structure ID: line m = lb PAN
6. Structure ID. line m = lb PAN
n.lines I+2+3+4+5+g= 2067.51bPAN
111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD_ DO NOT I IRT PIFI nC Tn VVWlr u DAKI rAkikinr or Anni irn mi ins- -
o tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
I. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
T865
F2 RTI 5
Small Grain
4.13
100.00
413.0
Sept - April
T865
T865
T865
T865
F2 RTI 6
F2 RT 8
F3 RT 9
F3 RT 10
Small Grain
Small Grain
Small Grain
Small Grain
3.31
1 34
2.20
2.36
100.00
100.00
100.00
100.00
331.0
134.0
220.0
236.0
Sept - April
Sept - April
Sept - April
Sept - April
T865
T865
T865
T865
F3 RT 11
F4 RT 14
F3 RT 15
F3 RT 16
Small Grain
Small Grain
Small Grain
Small Grain
2.98
3.90
2.48
2.89
100.00
100.00
100.00
100.00
298.0
390.0
248.0
289.0
Sept -April
Sept - April
Sept - April
Sept.- April
appncauvn sate or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2559.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) = 2067.5 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v irom section'lll) = 2559.0 lb. PAN
y. Overall PAN balance (w - x) _ 491 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed.
PoA (30 Day) 2/21 /00
r-
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID). JKenan Lagoon
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
I15.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard
E7-1-9.01 inches
c. line b - fine a (inches in red zone) =
4.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation)
185400 ft2
e. line c/12 x line d x 7.48 gallons/W
462264 gallons
3. Projected volume of waste liquid produced during draw down period
- f. temporary storage period according to structural design
180 days
g. volume of waste produced according to structural design
242116.4 ft3
h. current herd # 7344 certified herd # 7344
actual waste produced = current herd # x line g =
242116 fts
certified herd #
i. volume of wash water according to structural design
r-ft3
j. excess rainfall over evaporation according to design
108150 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f=
436665 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/6/2018
2.30 Ibs/1000 gal,
m. ((lines e + k)/1000) x line I =
2067.5 Ibs PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.