Loading...
HomeMy WebLinkAbout310683_Plan of Action_20181214-� �L011 000 9,4- J2_ - i q-6 31 G�3 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-683 Facility Name: S GRADY 6-9 County: Duplin Certified Operator Name: Steve Grady Operator Number: 18050 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon 6 Lagoon Name/ID: 6 6A 7A 7B 8 9 Spillway(Y or N): N N N N N N Level(inches): 15 15 14 14 16 13 2._ Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation "if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 12/20/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Steve Grady Phone: 919 658-5757 Facility Owner/Manager (print) Date: 12/14/2018 Facility Owner/Manager (signature) ;i r II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 6 line m = 360.0 Ib PAN 2. Structure ID: 6A line m = 147.0 lb PAN 3. Structure ID: 7 line m = 519.7 lb PAN 4. Structure ID: 7A line m = 199.9 lb PAN 5. Structure ID: 8 line m = 369.8 lb PAN 6. Structure ID: 9 line m = 390.8 lb PAN n.lines I+2+3+4+5+6= 1987.2lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 1128 1 small grain overseed 12.51 60.00 750.6 MAR-SEP 1128 2 small grain overseed 3.27 60.00 196.2 MAR-SEP 1128 3 small grain overseed 13.79 60.00 827.4 MAR-SEP 1128 4 small grain overseed 12.79 60.00 767.4 MAR-SEP 1128 5 small grain overseed 5.33 60.00 319.8 MAR-SEP 1128 6 small grain overseed 1.77 60.00 106.2 MAR-SEP 1128 7 small grain overseed 7.67 60.00 460.2 MAR-SEP 1128 8 small grain overseed 6.08 60.00 364.8 MAR-SEP 1128 9 small grain overseed 6.27 60.00 376.2 MAR-SEP 1128 10 small grain overseed 7.46 60.00 447.6 MAR-SEP 1128 11 small grain overseed 10.59 60.00 635.4 MAR-SEP N amounts estimated State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 5251.8 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1987.2 lb: PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 5251.8 lb. PAN y. Overall PAN balance (w - x) _ -3265 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc.- For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included -as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. ' Irrigation onto existing spray fields has begun and will continue as weather and field conditions permit. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 16 2. Current liquid volume in 25 yr/24 hr. storm storage & structural freeboard a. current liquid level according to marker 15.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 4.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 90000 ft2 e. line c/12 x line d x 7.48 gallons/ft3 252450 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121352 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line- g = 121352 ft'j certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 56058 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 221'171 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/26/2018 0.76 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 360.0 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 16A 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 15.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 4.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 37656 ft2 e. line c/12 x line d x 7.48 gallons/ft' 105625 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 40353 ft' h. current herd # 1224 certified herd #1 1224 actual waste produced = current herd # x line g = 40353 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated -1 9/26/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) �W 24223 ft3 80505 gallons 0.79 Ibs/1000 gal. 147.0 lbs. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 7 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a current liquid level according to marker 14.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 5.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 96100 ftz e. line c/12 x line d x 7.48 gallons/ft3 329463 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121352 1ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121352 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/26/2018 m._((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 57881 ft3 223444 gallons 0.94 Ibs/1000 gal. 519.7 Ibs. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I 7A 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 14.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red,zone) = 5.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 38144 ft2 e, line c/12 x line d x 7.48 gallons/ft3 130770 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 40353 ft3 h. current herd # 1224 certified herd # 1224 actual waste produced = current herd # x line g = 40353 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. ,(lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/26/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. .(Click on the next Structure tab shown below) 0 ft3 25317 ft3 81869 gallons 0.94 Ibs/1000 gal. 199.9 Ibs. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW -DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 8 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19 5,11iniches c. line b - line a (inches in red zone) = 3.5 inches d. top of dike'surface area according to design (area at below structural freeboard elevation) 76772 1ftz e. line c/12 x line d x 7.48 gallons/ft3 167491 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according #o structural design 180 days g. volume of waste produced according to structural design 121352 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121352 ft3 . certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according, to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4 Total PAN to be land applied during draw down period I. current waste analysis dated 9/26/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 1 ft3 46958 ft3 209826 gallons 0.98 Ibs/1000 gal. 369.8 Ibs. PAN PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): F 9 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard I a. current liquid level according to marker 13.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c line b - line a (inches in red zone) = 6.5 inches d top of dike surface area according to design (area at below structural freeboard elevation) 62411 ft2 e. line c/12 x line d x 7.48 gallons/ft3 252869 gallons 3. Projected volume of waste liquid producedduring draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 80706 ft3 h. current herd # 2448 certified herd # 2448 actual waste produced = current herd # x line g = 80706 ft3 certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 1 430351 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 154264 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/26/2011 8811 0.96 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 390.8 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure.tab shown below) PoA (30 Day) 2/21 /00