HomeMy WebLinkAbout310026_Plan of Action_20181214a- I q-(�
PLAN OF ACTION(Poa) FOR.HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-26 County: Duplin
Facility Name: Gilt Free Farms
Certified Operator Name: Staci Bailey Quinn Operator Number: 1002241
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
2
Y
2. Check all applicable items
24
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for. the receiving facility
3. Earliest possible date to begin land application of waste
12/19/2018
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Sheila Graham
.Facility Owner/Manager (print)
Facility Owner/Manager (signature)
Phone: 910-290-0427
Date: 12/14/2018
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: 1
line m =
lb PAN
2.
Structure ID: 2
line m =
470.4 lb PAN
3
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines I+2+3+4+5+6= 470.4lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u application window'
1
small grain overseed
1.46
75.00
109.5
Oct 20-Mar
2
small grain overseed
3.91
75.00
293.3
Oct 20-Mar
3
small grain overseed
6.28
75.00
471.0
Oct 20-Mar
4
small grain overseed
5.76
75.00
432.0
Oct 20-Mar
5
small grain overseed
6.05
75.00
453.8
Oct 20-Mar
6
small grain overseed
2.48
75.00
186.0
Oct 20-Mar
7
small grain overseed
2.92
75.00
219.0
Oct 20-Mar
8
small grain overseed
2.88
75.00
216.0
Oct 20-Mar
9
small grain overseed
4.50
75.00
337.5
Oct 20-Mar
10
small grain overseed
4.38
75.00
328.5
Oct 20-Mar
11
small grain overseed
3.85
75.00
288:8
Oct 20-Mar
12
small grain overseed
4.03
75.00
302.3
Oct 20-Mar
13
small grain overseed
5.35
75.00
401.3
Oct 20-Mar
N amouts estimated
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 4038.8 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE C
w. Total PAN to be land applied (line n from section II) = 470.4 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 4038.8 lb. PAN
y. Overall PAN balance (w - x) _ -3568 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit.
PoA (30 Day) 2/21/00
i
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 24.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches
c. line b - line a (inches in red zone) _ -5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 165426 ftz
e. line c/12 x line d x 7.48 gallons/ft3 464020 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 232094 ft3
h. current herd # 7040 certified herd #1 7040
actual waste produced = current herd # x line g = 232094 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 10/10/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0 ft3
99400 ft3
413263 gallons
Olbs/1000 gal.
0 lbs. PAN
PoA (30 Day) 2/21/00
16
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 12
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 28.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 32.0 inches
c. line b - line a (inches in red zone) = 4.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 113709 ftz
e. line c/12 x line d x 7.48 gallons/ft3 283514 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 116047 ft3
h. current herd # 3520 certified herd # 3520
actual waste produced = current herd # x line g = 116047 ft'
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
1. current waste analysis dated 1 10/10/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0 ft3
105760 ft3
276519 gallons
0.84 Ibs/1000 gal.
470.4 Ibs. PAN
PoA (30 Day) 2/21 /00