Loading...
HomeMy WebLinkAbout310026_Plan of Action_20181214a- I q-(� PLAN OF ACTION(Poa) FOR.HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-26 County: Duplin Facility Name: Gilt Free Farms Certified Operator Name: Staci Bailey Quinn Operator Number: 1002241 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 2 Y 2. Check all applicable items 24 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for. the receiving facility 3. Earliest possible date to begin land application of waste 12/19/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Sheila Graham .Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: 910-290-0427 Date: 12/14/2018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = lb PAN 2. Structure ID: 2 line m = 470.4 lb PAN 3 Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines I+2+3+4+5+6= 470.4lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u application window' 1 small grain overseed 1.46 75.00 109.5 Oct 20-Mar 2 small grain overseed 3.91 75.00 293.3 Oct 20-Mar 3 small grain overseed 6.28 75.00 471.0 Oct 20-Mar 4 small grain overseed 5.76 75.00 432.0 Oct 20-Mar 5 small grain overseed 6.05 75.00 453.8 Oct 20-Mar 6 small grain overseed 2.48 75.00 186.0 Oct 20-Mar 7 small grain overseed 2.92 75.00 219.0 Oct 20-Mar 8 small grain overseed 2.88 75.00 216.0 Oct 20-Mar 9 small grain overseed 4.50 75.00 337.5 Oct 20-Mar 10 small grain overseed 4.38 75.00 328.5 Oct 20-Mar 11 small grain overseed 3.85 75.00 288:8 Oct 20-Mar 12 small grain overseed 4.03 75.00 302.3 Oct 20-Mar 13 small grain overseed 5.35 75.00 401.3 Oct 20-Mar N amouts estimated 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4038.8 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE C w. Total PAN to be land applied (line n from section II) = 470.4 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 4038.8 lb. PAN y. Overall PAN balance (w - x) _ -3568 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. PoA (30 Day) 2/21/00 i PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 24.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) _ -5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 165426 ftz e. line c/12 x line d x 7.48 gallons/ft3 464020 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 232094 ft3 h. current herd # 7040 certified herd #1 7040 actual waste produced = current herd # x line g = 232094 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/10/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 99400 ft3 413263 gallons Olbs/1000 gal. 0 lbs. PAN PoA (30 Day) 2/21/00 16 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 12 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 28.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 32.0 inches c. line b - line a (inches in red zone) = 4.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 113709 ftz e. line c/12 x line d x 7.48 gallons/ft3 283514 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 116047 ft3 h. current herd # 3520 certified herd # 3520 actual waste produced = current herd # x line g = 116047 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 1 10/10/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 105760 ft3 276519 gallons 0.84 Ibs/1000 gal. 470.4 Ibs. PAN PoA (30 Day) 2/21 /00