Loading...
HomeMy WebLinkAbout310519_Plan of Action_2018121912-1q-1�5 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 12/18/2018 1. Structure Name/Identifier (ID): E&B Farms Inc. 4 FN: 31-519 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to'marker% I 16.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 3.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 16066.4 ft2 e. line c/12 x line d x 7.48 gallons/W 30044_ gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 39561 ft3 h. current herd # 1200 certified herd #1 1200 actual waste produced = current herd # x line g = 39561 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 11/15/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 25989 ft3 81719 gallons 0.98 Ibs/1000 gal. 109.5 Ibs. PAN PoA (30 Day) 2/21/00 12/19/2018 ti II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: E&B Farms Inc.(4) line m = 109.5 lb PAN 2. Structure ID. line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 109.5lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD_ o. tract # p. field # q. crop r. acres s remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u application window' Brinkley 1 Fescue- Hay 3.51 25.00 87.8 Aug. - Jul Brinkley 2 Fescue- Hay 3.23 25.00 80.8 Aug. - Jul Brinkley 3a Fescue- Hby 2.61 25.00 65.3 Aug. - Jul Brinkley p3b Fescue- Hay 1.14 25.00 28.5 Aug. - Jul 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 262.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE W. Total PAN to be land applied (line n from section II) = 109.5 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 262.3 lb. PAN y. Overall PAN balance (w - x) = -153 lb. PAN PoA (30 Day) 2/21/00 12/19/2018 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Farm still in red from hurricane Florance. Waste will be applied agronomically and hydraulically as weather permits. PoA (30 Day) 2/21 /00 12/19/2018