Loading...
HomeMy WebLinkAboutNCG190010_Compliance Inspection Report_20190620Compliance Inspection Report Permit: NCG190010 SOC: County: Carteret Region: Wilmington Contact Person: Eric Denton Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Effective: 06/02/15 Expiration: 05/31 /20 owner: Parker Offshore LLC Effective: Expiration: Facility: Parker Offshore LLC 2570 Hwy 101 Inspection Date: 06/20/2019 Primary Inspector: Brian P Lambe Secondary Inspector(s): Title: Entry Time: 02:OOPM Certification: Beaufort NC 28516 Phone: Phone: Exit Time: 03:OOPM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG190010 Owner - Facility: Parker Offshore LLC Inspection Date: 06/20/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Met with Eric Denton. Site is very well maintained and potential pollutants are properly stored. SPPP is maintained properly. Site typically reports no discharge and properly reports monitoring results. Site in compliance. Page 2 of 3 Permit: NCG190010 Owner - Facility: Parker Offshore LLC Inspection Date: 06/20/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3