HomeMy WebLinkAbout310317_Plan of Action_20190204PLAN OFACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number. 31-317
Facility Name:
Vaden Bond Home Farm
Certified Operator Name:
Vaden Bond
RECEIVED/NCDENROR
FEB 0 4 2019
Water Quality Regional
County: Duplin Operations Section
Wilmington Regional Office
Operator Number:
AWA 17170
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways;'and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
H
N
14
2. Check all applicable items
X Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 9/18/18
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Vaden Bond
Facility Owner/Manager (print)
Phone
gla- ;-Sq' 550
°%Lj Date: 3 )
Facility Owner/Manager (signature)
r- N
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: H
line-m =
864.2 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1 +2+3+4+5+6=
864.2 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFRInn_ nn NnT I IST FIFI nS Tn Vwi4irH PAN CANNAT RF APPI
IFn niiRimr; THIS Rn nAY PFRInn
.:
�BALANCEFOR
• ..
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1399.9 lb. PAN
IV. FACILITY'S PoA OVERALL -PAN BALANCE
w. Total PAN to be land applied (line n from section ll) = 864.2 lb. PAN
x. Crop's remaining PAN balance (line v from section. III) = 1399.9 lb. PAN
y. Overall PAN balance (w -x) _ -536 lb. PAN
PoA (30 Day) 2/21 /00
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance
table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
Irrigation onto existing spray fieldswill continue asweatherand field conditions permit.
Prior to Hurricane Florence, lagoon was well into compliance. Recorded freeboard on 9/10/18 was 38 in. Approximately
26 in of rainfall was recorded from the hurricane Sept 13-15. Irrigation began afterthe storm on 9/18/18, and by 10/1/18,
the lagoon was in compliance. An inspection was doneon November7, 2018with no structural issues noted and no
stuctural issues noted by producerfromthe hurricane.
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
H
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 14.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches
c. line b - line a (inches in red zone) = 5.5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 83700 ft2
e. line c/12 x line d x 7.48 gallons/ft3 286952 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 517730 ft3
h. current herd # 2000 certified herd #1 2480
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/2/18
m., ((lines e + kU1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
417524 ft3
0 ft3
59680 ft3
594915 gallons
0.98 Ibs/1000 gal.
864.2 Ibs. PAN
PoA (30 Day) 2/21 /00