Loading...
HomeMy WebLinkAbout310105_Plan of Action_20190204C 201 Q op 3o RECEIVED/NCDENR/M PLAN OFACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 31-105 Facility Name Vaden Bond New Ground Farm Certified Operator Name Vaden Bond FEB 0 4 2019 , Water Quality Regional County: Duplin Operations Section ty Wilmington Regional Office Operator Number. AWA 17170 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current' liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: NG Spillway(Y or N): N Level(inches): 14 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/18/18 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Vaden Bond Phone: 5 [ U - Facility Owner/Manager (print) !\/�J� A-0-� I Date: 1 , 30 — 19 Facility Owner/Manager (signature) 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: NG line m = 599.3 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = - lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 599.3 lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRlnn nO NnT 1 IST FIFI n-q Tn Wi4lrl1 PAN rANNnT RF APPI IFn nl lRlnlr- TUIQ zn nev o=olnn O. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' pivot pivot bermuda 11.55 22.80 263.3 Mar 1-Oct 20 pivot pivot sm gr 11.55 50.00 577.5 Oct 1 -Mar 31 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 840.8 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 599.3 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 840.8 lb. PAN y. Overall PAN balance (w - x) = -242 lb. PAN PoA (30 Day) 2/21 /00 Line y must show as a deficit. If line y-does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Prior to Hurricane Florence, lagoon was well into compliance. Recorded freeboard on 9/10/18 was 39 in. Approximately 26 in of rainfall was recorded from the hurricane Sept 13-15. Irrigation began afterthe storm on 9/18/18, and by 10/1 A 8, the lagoon was in compliance. An inspection was doneon November7, 2018with no structural issues noted and no stuctural issues noted by producerfrom the hurricane. PoA (30 Day) 2/21/00 .c. —i— M PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): NG 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 14.0 inches 19.5 1 inches 5.5 inches 756,11 ft2 259220 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 88152 ft3 h. current herd # 3000 certified herd #1 4120 actual waste produced = current herd # x line g = certified herd # i. volume,of wash water according to structural design j. excess rainfall over evaporation according to design, k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/2/18 m. ((lines e + ky1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 64188 ft3 0 ft3 48369.1 Ift3 140322 gallons 1.50 Ibs/1000 gal. 599.3 lbs. PAN PoA (30 Day) 2/21 /00