PLAN OFACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number. 31-105
Facility Name
Vaden Bond New Ground Farm
Certified Operator Name
Vaden Bond
FEB 0 4 2019 ,
Water Quality Regional
County: Duplin Operations Section
ty Wilmington Regional Office
Operator Number.
AWA 17170
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current' liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: NG
Spillway(Y or N): N
Level(inches): 14
2. Check all applicable items
X Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 9/18/18
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Vaden Bond Phone: 5 [ U -
Facility Owner/Manager (print)
!\/�J� A-0-� I Date: 1 , 30 — 19
Facility Owner/Manager (signature)
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: NG
line m =
599.3 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
- lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 599.3 lb PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFRlnn nO NnT 1 IST FIFI n-q Tn Wi4lrl1 PAN rANNnT RF APPI IFn nl lRlnlr- TUIQ zn nev o=olnn
O. tract #
p. field #
q. crop
r. acres
s. remaining IRR-2
PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
pivot
pivot
bermuda
11.55
22.80
263.3
Mar 1-Oct 20
pivot
pivot
sm gr
11.55
50.00
577.5
Oct 1 -Mar 31
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 840.8 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 599.3 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 840.8 lb. PAN
y. Overall PAN balance (w - x) = -242 lb. PAN
PoA (30 Day) 2/21 /00
Line y must show as a deficit. If line y-does not show as a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance
table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit.
Prior to Hurricane Florence, lagoon was well into compliance. Recorded freeboard on 9/10/18 was 39 in. Approximately
26 in of rainfall was recorded from the hurricane Sept 13-15. Irrigation began afterthe storm on 9/18/18, and by 10/1 A 8,
the lagoon was in compliance. An inspection was doneon November7, 2018with no structural issues noted and no
stuctural issues noted by producerfrom the hurricane.
PoA (30 Day) 2/21/00
.c. —i— M
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
NG
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
14.0 inches
19.5 1 inches
5.5 inches
756,11 ft2
259220 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 88152 ft3
h. current herd # 3000 certified herd #1 4120
actual waste produced = current herd # x line g =
certified herd #
i. volume,of wash water according to structural design
j. excess rainfall over evaporation according to design,
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/2/18
m. ((lines e + ky1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
64188 ft3
0 ft3
48369.1 Ift3
140322 gallons
1.50 Ibs/1000 gal.
599.3 lbs. PAN
PoA (30 Day) 2/21 /00