Loading...
HomeMy WebLinkAbout710096_Plan of Action_20181126a-o��o�s7s 71.­3 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: - County: Facility Name: o Certified Operator Name: CAC-1 Operator # 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to -the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): _ >� Level (inches): l` 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30', day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. __z Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped -and hauled is reflected in section III tables. Included within this plan is a list of the proposed- sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. o0-�-m , U k Facility Owner/Manager (print) nager (signature) PoA Cover Page V21/00 Phone: �,/,q Date: //- 4- / 0" PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Charles Wooten #2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 18.0 inches 19.0 inches 1.0 inches 411998 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 330480 ft3 h. current herd # 4600 certified herd # 4896 actual waste produced = current herd # x line g = certified herd # i. volume -of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 ' days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 10/10/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) r PoA (30 Day) 2/21/00 310500 ft' � 0 ft3 37,188 ft3 433451 gallons 0.78 Ibs/1000 gal. 669.6 lbs. PAN c PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Charles Wooten #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker l 8—. -01 inches b. designed 25 yr./24 hr. storm & structural freeboard 18.0 inches c. line b - line a (inches in red zone) = inches, d. top of dike surface area according to design (area at below structural freeboard elevation) 622692 ftz e. line c/12 x line d x 7.48 gallons/ft' gallons i 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 495720 ft3 h. current herd # 36001 certified herd #F 3672 actual waste produced = current herd # x line g = 486000 ft' certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 10/10/2018 ( m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 539581 ft3 673148 gallons 0.88 Ibs/1000 gal. 592.4 lbs. PAN PoA (30 Day) 2/21/00 5b II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Charles Wooten #2 line m = 659.5 lb PAN 2. Structure ID: Charles Wooten #1 line m = 592.4 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines I+2+3+4+5+6= 1251.8lbPAN 111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNnT RF APPI IFn rn IRwr_ TL.IIQ zn nev omoinn o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Ib/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 7061 P1 Small Grain 3.77 50.00 188.5 Oct -April P2 " 3.39 50.00 169.5 " P3 " 4.46 50.00 223.0 " P4 " 4.45 50.00 222.5 " P5 " 5.16 50.00 258.0 " P6 " 5.16 50.00 258.0 " P7 " 5.07 50.00 253.5 " P8 " 3.24 50.00 162.0 " P9 " 4.04 50.00 202.0 " P10 " 2.80 50.00 140.0 " P11 " 4.32 50.00 216.0 " P12 " 2.80 50.00 140.0 " P13 " 3.47 50.00 173.5 " P14 " 2.40 50.00 120.0 " P15 " 5.37 50.00 268.5 " P16 " 6.00 50.00 300.0 " OWru cuirunt crop unaing appiicauon aaie or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3295.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1251.8 lb. PAN PoA (30 Day) 2/21/00 X. Crop's remaining PAN balance (line v from section III) = 3295.0 lb. PAN y. Overall PAN balance (w - x) _ -2043 Ib.'PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd 'population and lagoon freeboard levels at the receiving facility. Mr. Wooten called on 11-16-18 to report thathe had a high lagoon on CW1& CW2. Information was received to complete the POA on 11/16/18 by email from Chuck Wooten. POA completed on 11/19/2018 by Jason Turner PSWCD Techn. PoA (30 Day) 2/21/00