Loading...
HomeMy WebLinkAbout710096_Plan of Action_201902154 .: 7/-clC Callej oLn -1s°Ict PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT,ANIMAL FACILITIES Facility Number,: 71-96 County: - Pender Facility Name: Stoneybrook Certified Operator Name: Derek Brown Operator Number: 19632 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest pointon the top of the dam for lagoons without spillways; and from the current liquid level in'the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 6179 Spillway(Y or N): N - Level(inches): 19 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day' Plans of Action are attached. Hydraulic and agronomic balances are within acceptable rahges. X Liquid level is within the 25 year 24 hour storm elevations for -one ormore structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is ,to be pumped and hauled'to off site locations. Bolume and PAN content of waste to be'pumped and hauled is reflected in section'III tables. Included within this'plan is a list of the proposed sites with related, facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in -the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation If animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information fisted above andincluded withirrthe attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct, Murphy Brown, LLC Phone: 910-293-3434 - Facility Owner/Manager (print) _ Date: ` 2/18/2019 Facility Own r/Manager (signature) r II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 Y HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY �. Structure ID: Stoneybrook line m = 735.9 2. Structure ID: line m = 3. Structure ID: line m = 4. Structure ID: line m = 5. Structure ID: line m = 6. Structure ID: line m = n.lines 1+2+3+4+5+g= 735.9 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAM PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 3n • . • • .•TOTAL 2 PAN balance ._ PAN �BALANCE FOR . . �.�.� 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. _ v. Total PAN available for all fields (sum of column t) = 1498.2 N. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 735.9 PoA (30 Day) 2/21/00 x. Crop°s remaining PAN balance (line v from section III)-= 1498.2 Y. Overall PAN balance (w - x) = ' -762 Line y must 9how'as a deficit. If line ydoes not show as a deficit, list course of action here incl haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculE on new information. If new fields are to be included as art option for lowering lagoon level, add PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to facility, provide information regarding the herd population and lagoon freeboard levels at the re ,PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): istoneybrook 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 19.0 b. designed 25 yr./24 hr. storm & structural freeboard 19.8 c. line b - line a (inches in red zone) = 0.8 d. top of dike surface area according to design (area at below structural freeboard elevation) 204750 e. line c/12 x line d x 7.48 gallons/W 102102 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 g. volume of waste produced according to structural design 211483 h. current herd # 2000 certified herd #1 2000 actual waste produced = current herd # x line g = 211483 certified herd # i. volume of wash water according to structural design 01 j. excess rainfall over evaporation according to design 119437.5 k. (lines h + i + j) x 7.48 x 30 days/line f= 412548 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 1/9/2019 1.43 m. ((lines e + k)/1000) x line 1 = 735.9 REPEAT;SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21100