Loading...
HomeMy WebLinkAbout310124_Plan of Action_20190124PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name: 31-124 County: Duplin J&R Farm Certified Operator Name: Jason Cavenaugh Operator. Number: AWA 18735 31-12Y 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lag 1 Lag 2 N N 13 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. l X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully. depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels.and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Jason Cavenaugh Phone: Facility Owner/Manager (print) py-\ Date: Facility Owner/Manager (signature) 910-289-7659 1 /24/2019 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 571.9 Ib PAN 2. Structure ID: Lag 2 line m = 531.4 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 1103.3lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY'DRAW DOWN P;:Pinn nn NnT I IAT rim nS Tn WNICId PAN CONNAT RF APPLIED nl1RING THIS 30 DAY PERIOD_ 0. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Iblacre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 1 Small Grain ' 35.47 62.00 2199.1 Sept -April 2 Small Grain 13.88 45.00 624.6 Sept -April sub3 Small Grain 11.05 76.00 839.8 Se t-A ril 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3663.5 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1103.3 lb. PAN I PoA (30 Day) 2121/00 x. Crop's remaining PAN balance (line v from section III) = 3663.5 lb.PAN y. Overall PAN balance (w - x) _ -2560 lb. PAN Line y must show as a deficit If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard'levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. Bermuda yeilds have been increased because producer will be cutting for hay. PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE f 1. Structure Name/identifier (ID): Lagoon 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 13.0 inches 19.5 inches 6.5 inches 67375 ftZ 272981 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design F 80705 ft3 h. current herd # r 24-4-8-1 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated I ' 10/19/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 53803 ft3 ® ft3 39302.1 ft3 116071 gallons 1.47 Ibs/1000 gal. ' 571.9 Ibs. PAN PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 11-ag 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 96100 ft2 e. line c/12 x line d x 7.48 gallons/ft3 119805 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g, volume of waste produced according to structural design 121058 ft3 h. current herd # 36721 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft' certified herd # i. volume of wash water according to structural design ®ft3 j. excess rainfall over evaporation according to design 56058 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 220805 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 10/19/2018 1.56 Ibs11000 gal. m. ((lines e + k)/1000) x line I'= 531.4 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21100