HomeMy WebLinkAbout310196_Plan of Action_20190305-�*o [10 0 5:2 �
PLAN OF ACTION(Poti) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
31-196
County: Duplin
Facility Name: Ecosystem Farms, Inc.
Certified Operator Name: Mike Stocker Operator Number:
18159
1: Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
In the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: ECO 1
Spillway(Y or N): N
Level(inches): 18
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*'if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Mike Stocker Phone:
Facility Owner/Manager (print)
{ 1 1 �� �K� r Date:
Facility Owner/Manager (signature)
(910)293-3606
3/5/2019
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDIOR 25 YR.I24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE
STRUCTURES FOR FACILITY
A.
Structure ID: ECO 1
line m = 815.7 lb PAN
2.
Structure ID:
line m =
lbPAN
3.
Structure ID:
line m =
lbPAN
4.
Structure ID:
line m =
lb, PAN
5.
'Structure ID:
line rn =
lb PAN
6,
Structure ID:
line m =
lb PAN
n.-linesI+2+3+4+5+g= 816.7lb-PAN
III, TOTAL PAN -BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD_ DO NOT LIST FIELDS TO WHICH PAN rANNnT RF APPI mn ni IRIN[. TNIC -in nAv DDQinn
o. tract #
p. field #
q, crop
r. acres
s. remaining IRR
2 PAN balance
Qb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application windoWl
ECO 1
P1-T1
Rye
22.06
45.00
992.7
Sept -April
R e
22.06
25.74
567.8
Se t-A ril
R e
6.19
68.00
420.9
Se t-A ril
R e
6.19
'68.00
420.9
Se t-A ril
Rye
29.90
26.64
796.5
Sept -April
P
titate current crop.enaing application date or next crop application beginning date for available-
receiving,crops during 30 day draw down period. -
v. Total PAN available for all fields (sum of column t) _ 3198.9 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
W. Total PAN to be land applied (linen from section II) 815.7 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III)-= 3198.9 lb. PAN
y. Overall PAN balance (w - x) _ -2383 lb. PAN
Line y must show as a deficit. If line y does not show as.a deficit, list course of action here _including pump and
haul, depopulation; herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as -an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility. .
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed. Has applied on leased land.
PoA (30 Day) 2/21100
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD -
I. TOTAL PAN TO BE.LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JECO 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 18.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) _ 1.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 225093 ft2
e. line G12 x line d x 7.48 gallons1W 140308 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 94 days
g. volume of waste produced according to structural design 232561 ft3
h. current herd # 2600 certified herd #1 4900
actual waste produced = current herd # x line g = 123400 ft'
certified herd #
i, volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/21/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
1
PoA (30 Day) 2/21 /00
Oft3
131304 ft3
608037 gallons
1.09 Ibs/1000 gal.
816.7 lbs. PAN
0