HomeMy WebLinkAbout310100_Plan of Action_201903043 31 -/, ckz:). PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 1 31-100 County: Dupl i n Facility Name: Justin Murphy & Lynn Sutton Farm Certified Operator Name: Justin Murphy Operator#: 17253 lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current.liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Lagoon Name (ID): JM1 r Spillway (Yes or No): No Level (inches): 1811 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures., Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations'for one or more structures: A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of f waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation #NAME? 3. Earliest possible date to begin land application of waste: 3/8/2019 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Justin Murphy Phone: Facility Owner/Manager (print) Date: 3/4/2019 Facility Owner/Manager (signature), Cover Page J Muphy & L Sutton (31-100) PoA30day (3-4-19) Page 1 of 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Justin Murphy#JM1 (31-100) line m = 140.6 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 140.6 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window 6042 8 Wheat 4.48 90.00 403.2 9/1 = 4/30 6042 9 Wheat 7.04 96.00 675.8 9/1-4/30 6005 10 Wheat 4.75 98.00 465.5 9/1-4/30 6005 11 Wheat . 4.75 98.00 465.5 9/1 - 4/30 6005 12 Wheat 5.51 87.00 479.4 9/1-4/30 6005 13 Wheat 5.51 93.00 512.4 9/1 - 4/30 6005 14 Wheat 4.70 98.00 460.6 9/1-4/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 3462.4 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 140.6 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 3462.4 lb. PAN y. Overall PAN balance (w - x) = -3322 lb. PAN Summary J Muphy & L Sutton (31-100) PoA30day (3-4-19) Page 1 of 2 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance.- If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Waste will be applied as soon as weather permits. Summary J Muphy & L Sutton (31-100) PoA30day (3-4-19) Page 2 of 2 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE. 1. Structure Name/Identifier (ID): Justin Mur h #JM1 31-100 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation)_ 37,720 ftZ e. line c/12 x line d x 7.48 gallons/ft3 23,512 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 19,685 ft3 h. current herd # 1,240 certified herd #1 1.240 actual waste produced = current herd # x line g = 19,685 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 2/8/2019 11 m. ((lines e + k)/1000) x line I REPEAT SECTION I FOR EACH WASTE_ STRUCTURE ON SITE. (Click on the next Structure tab shown below) if 12,250 ft3 39,812 gallons 2.22 Ibs/1000 gal. 140.6 lbs. PAN Structure 1 J Muphy & L Sutton (31-100) PoA30day (3-4-19) Page 1 of 1