Loading...
HomeMy WebLinkAbout710069_Plan of Action_2019013171- 0 Coh,%lnweeQ 0,35-7,�F �...31- Iq PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 71-69 County: Ponder Facility Name: Bear Ridge Certified Operator Name: Charles Wooten, JR Operator Number: AWA17986 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 11 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Chuck Wooten Phone: 910-231-0526 Facility--Occw//ner/Manager (print) ljs �-� W Date: 1/31/2019 Facility Owner/Manager (signature) n 11. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: Bear Ridge line I = 81304 gallons 2. structure ID: line I = gallons 3. structure ID: line l = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons n. lines 1 + 2+ 3+4+'5+ 6 = o. linen/ 27154 = 81304 gallons 2.99 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD"' 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. MEN .. -• ._ : ._ �. .. . -�-PC - 1 x. total acres available during 5 day,draw. down (sum of column t) = 6.42 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE line o = 0.47 inches per acre to be applied,within 5 days PoA ( Day) 2/2'1700 ia• line x If unable to land apply hydraulic load listed In line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, Plan to land 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in fields "trafficabili " across soils; will soils absorb application without runoff, etc. 2. Date and amount of last rainfall event? DATE: 01/13/19 3. Dates of last waste application event 1/12/2019 - pull4 4. Given optimum soil and weather AMOUNT: 0.40 inches ation equipment capable of applying the volume in line "n" at appropriate seasonal i.e. winter application rates within 5 days? 1 1 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event, changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to amounts; and any other intormation for consideration. PoA (5 Day) 2/21/00 a PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Bear Rid e 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c, line b - line a (inches within -structural freeboard) _ A. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/W 3. Projected volume of waste liquid produced during draw down period 11.0 inches 12.01 inches 1.0 inches 100000 ft2 62333 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121068.2 ft' h. current herd # 1000 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 32968 ft' ft3 58333.3 ft3 18970 gallons 81304 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2121/00 I