Loading...
HomeMy WebLinkAbout710069_Plan of Action_20190108PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: - 71-69 County: Pender Facility Name: Bear Ridge Certified Operator Name: Charles Wooten, JR Operator Number. AWA17986 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon Lagoon Lagoon 3 Lagoon Lagoon 5 10 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and,agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's'CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation "if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and, included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Chuck Wooten Phone: Facility Owner/Manager (print) t\(� k. A � ,Q� erT I CA � Date: Faci ity Owner/Manager (signature) 910-231-0526 1/7/2019 f r It. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1 structure ID. Bear Ridge line I = 160077 gallons 2 structure ID: line I = gallons 3. structure ID: line I = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons n.lines 1+2+3+4+5+6= 0. line n / 27154 = 160077 gallons 5.90 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD I,2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s_ crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) 2 Small Grain 6.42 50 0.5 .5-1.0 x. total acres available during 5 day draw down (sum of column t) = 6.42 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE line o = 0.92 inches per acre to be applied within 5 days PoA �- Day) 2/2770T line x If unable to land apply hydraulic load listed in line list course of action here including pP Y Y Y, 9 pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. to land apply hydraulic toad: )scribe moisture conditions of fields? (e g. Is there water standing in field; does irrigation equipment mar oown in flela; "trarricanmty" acro ite and amount of last rainfall event? DATE: 01 /01 /19 ,3. uates of n without runott, etc. AMOUNT: 0.10 inches 4. Given optimum soil and weather conditions. is irrioation eauinment canable of annlvinn the volume in une ..n.. at appropriate seasonal i.e. winter application rates wltnin 5 clays'? 5. Irrigation schedule for next 5 days - include daily schedule;. proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to in application rates and amounts; and any other information for consideration. PoA (5 Day) 2/21/00 l II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: Bear Ridge line I = 160077 gallons 2. structure ID: line I = gallons 3. structure ID: line 1 = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons 6. structure ID: line I = gallons n.lines 1+2+3+4+5+6= o. linen/ 27154 = 160077 gallons 5.90 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD1,2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) W. maximum application amount (inches) 2 Small Grain 6.42 50 0.5 .5-1.0 x. total acres available during 5 day draw down (sum of column t) _ 6.42 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE y line o = 0.92 inches per acre to be applied within 5 days PoA v. Day) 2/2'1700 ~l line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. land apply hydraulic load: cribe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar aown In vela; "tramcablllty- across soils; WIII sods absorb application without runoff etc_ and amount of last rainfall event? DATE: 01 /01 /19 3. Uates of last AMOUNT: 0.10 inches 4. Given optimum soil and weather conditions. is irriaation eauinment ranahle of nnnlvinn the volume in line ..n- at appropriate seasonal(i.e. winter application rates within 5 (lays? 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts lation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration. PoA (5 Day) 2/21/00