June 21, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
Novozymes North America, Inc.
ATTN: Richard H. Olofson, Treasurer
PO Box 576
Franklinton, NC 27525
RE: Project Name: Novozymes Spray Dryer
Project ID: FRANK-2019-034
Acres Approved: 11.29
County: FRANKLIN, City: Franklinton Address:
River Basin: Tar Pamlico, Stream Classification:
Submitted By: S&ME
Date Received by LQS: May 22, 2019
Plan Type: New
Dear Mr. Olofson:
Perry Chapel Church Rd
Other
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval with Modifications. The enclosed Certificate of
Approval must be posted at the job site. This plan approval shall expire three (3) years following the
date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC
413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The NO[ form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the N01 form to Annette Lucas at
Annette.lucasOncdenr.goy or Paul Clark at Paul.clark ri ncdenr.gov. After you submit a complete and
correct NOI form, a CPOC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for the coverage under the NCG01 permit. However, on or after June 1, 2019, a $100
fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
a EQ.�
no„n, 1
Lv
North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources
Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh. North Carolina 27609
919,7914200
Letter of Approval with Modifications
Novozymes North America, Inc.
June 21, 2019
Page 2 of 3
Title 15A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspection made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Sally Castle, :l
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
NCGOI Fact Sheet
cc: Christopher J. L. Stahl, PE (cstahl@smeinc.com) - Electronic Copy
DEMLR - Raleigh Regional Office File
Letter of Approval with Modifications
Novozymes North America, Inc.
June 21, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Novozymes Spray Dryer
County: FRANKLIN
Project ID: FRANK-2019-034
1. Provide two copies of the plan set issued for construction (one full-size and one half-size),
prior to initiating land -disturbing activity. These plan sets are to be complete with cover page
containing project name, vicinity map, and contact information. The plan sets are to include
existing conditions, sheets representing all phases of grading with the associated erosion and
sedimentation control measures, an overall erosion and sedimentation plan sheet, utility sheets,
and final conditions. Include the limits of disturbance on all plan sheets. Securely bind all
plan sheets in the proper order (no loose sheets). If changes to the permitted plan sets are made,
provide a cover letter addressing the changes, one copy of additional items (such as design
calculations) and bubble, highlight, or otherwise identify the changes to your
resubmittal. Reference the project name and ID on the submittal package. (G.S. 113A-57(4))