Loading...
HomeMy WebLinkAbout20061217 Ver 2_Other Agency Comments_20090828mod..; ..au,.4....,,: . <' a. ...,y. .-.v : ?_?w...vf.C.G?.:^4.rr'-' n: `.:-W.-r,'.Nm n.,'. ?.. -M ;_ f. i? ...... ,,.. ...]+Y.=4?.... .?..rs;. tir,.: ..<r^.'?..,?: ?:v.rw.o-:. ?.N..WtW>J? ...N S.NY?.,;.N .i. •- ? ie .?.?.N.:a..A,.. ,.o. oi..., .., ,. . ?ermit "ass Permit Number vF.w 121-09 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission r2=,@ [E a V P ,Permit AUG 2 8 2009 for X Major Development in an Area of Environmental Cond-WATERQUALITY pursuant to NCGS 113A-118 WETLANDS AND STORMWATER BRANCH Excavation and/or filling pursuant to NCGS 113-229 Issued to Ray E. McCotter, PO Box 12623, New Bern, NC 28561 Authorizing development in Craven County adj. to the Trent River, at 123 Dylan Lane at the Trent River Villas, in New Bern, as requested in the permittee's application dated 4/7109 (MP-4) and 4/20/09 (MP-1) including the attached drawings (3), 1 dated revised 5/16/06 and 2 dated 6/8/06 This permit, issued on August 24, 2009 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Marina 1) The marina shall display a sign showing the location of the nearest pumpout facility, including other. appropriate waste disposal information, at the entrance and exit from the main pier. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit shall be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work shall cease when the permit expires on December 31, 2012 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. _ i i -i James H. Qjejson, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Ray E. McCotter ADDITIONAL CONDITIONS Permit # 121-09 Page 2 of 3 3), Unles_s spLfi-ally altered herein, this permit authorizes only the additional finger piers and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility without permit modification. No non-water dependent uses of structures may be cctnducted on, in or over public trust waters without permit modification. 4) In accordance with requirements of the U.S. Army Corps of Engineers, the location of the near edge of the existing federal channel must be established prior to initiation of construction activities. No part of the permitted structure may be constructed within 34 feet of the near edge of the federal channel. 5) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 6) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 7) This permit does not authorize the interference with any existing or proposed Federal project, and the pennatee, shall not be entitled to compensation for damage to the authorized structure or work, or injury that may be caused from existing or future operations undertaken by the United States in the public interest. 8) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 9) This permit authorizes the additional 7 slips for a maximum of 17 formalized boat slips. General 10) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 11) Any mitigative measures or environmental commitments specifically made by the applicant in the Environmental Assessment for this project should be implemented, regardless of whether or not such commitments are addressed by individual conditions of this permit. 12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. Ray E.1VIcCotter Permit # 121-09 Page 3 of 3 r ADDITIONAL CONDITIONS i of 13) No v, 4etated wetlands or open water areas shall be excavated or filled, even temporarily. 14) Th, permittee and/or his contractor shall meet with a representative of the Division prior to project initiation in order to discuss the conditions set forth in this permit. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is further advised that, in accordance with the rules of the Environmental Management Commission, many non-water dependent activities are not authorized within 50 feet of the normal water level or landward edge of any coastal wetlands, which ever is more restrictive. Contact the Division of Water Quality at (252) 946-6481 for project specific clarification. NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3641 (DWQ L'roject No. 06-1217 V.2), which was issued on 8/3/09. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2009-00968. r ? ? r. r tb^?o a ? o ? •11 ? • ?1 n n a 11 ? ? L k ? O r • ? z 1 * 7 ? A a o a o Cl) i 1 _•? hl ? p ? -? c tie b ?* ? r , , . b. M r • ? 2 cn 1. II ?? D ~ "1 m c o? `?p?M,uwrrrrrr?•' r n m ?n C1 x a r Hl£ m co ? y m 41 Zj L m n m an o v m I. z 0 + zz C Nn Q No co z a R1 o V?? cn `1~ C H O A ?f rn u A o H . a ' * :C r z a N vN ' cry ? o m ? z 10 N N k 0 a I? ?n o o R' ?- a r a 0 0 ° 0 0 0 I i 11 N I I ' - _ I I m - C o 1111111111 .Ott 2 i m ? '1 ? _ t n Nam ?? ?•: v. H X 2 ? T F? ?D ytC V m ? m- Rpm o ? c y o ? . a o T ? H = z y p x ;7 o ? N p Z a? 0 y ?L v ro p ? n Z q I H ? O? ..D-" 7 p p p p O tlo Z p ?. ? D y t i ~ ~ '~G ~ ~ Ga/ 'v A ~ i ~ i ~ ~ ~ 1~.Q. x >>o• 9 ,ti ' ~ , ~ 1 ~ .1~.L f pd r r c.~arv~, ~G'" l SL1Dg 19B / ~ j 8 F, ~ t 3 -,~1 I ' ~ i/ x ;I ~ F \ x -hi S,T i,~ c x 'A , F , ~ ti ~ i 1~ ~ cg`s ~ ® x -P.9 ~ ~ t t~ ~ / - e ~ -foz F ,,i x '~i s y~ , ~ ~Ii -~F® ,e 9 , i. c® O 4, 1 ~o q X 11.9 x , ~ r~ ~S 4~ ` , v -7.4 k 24 lS M~ x 0~ q'' Tb 'Aj d, A ; s, % ~ '9 ti X ld8 ST i X_ / r Q9 ~ 9~/ S ® ~ i r C F 1 G \ \ x x-dB , ~ L ~.i C~ F u , 5 y ~ > o , . ~ ~ p ~ % o a65 ~ ~i~, -14,9 ~ V c x '~r ~ ~ fi , ,1 ~ 7 X f4~1 o ~ ~ - ~ -4.9 0 ~ x -214 ~ ' ~ NORMAL WATER j ~ l X 126 ~ r'/ LEVEL 1.0 FT: c ~ ~ o ~ ` _ _ w ~ \ X -~15 ~ X 729 ~ c ~ ~ , ~ ~1 hJ 9{ ~ ~ o x 2 / ° ` -5.43 ' -Pf~S ` ~ h ~ ~ x O / ~j -i99 ~ 0 1` ~ x% o x / X1,1 ~ ~ -7.16 v ti ~ 1&3 ~ d~X d n,, e~P,o~ T 3' i~~~ J ~ cF o / \ "Q~\ ~ ~ ~ \ x ~ -14! ~yy \ x 3 x p R O SALT TREA / \ M PYLONS -17.0 / \ ~ E o ~ x ~ \ 0 / c . ~ ,6 P ~ ~ / x ,g~ae 0 e~~ N \ x ~ i a a°~ ~e"R C~ c ~ a ~ ~ PB.7 m ~l x ~ m ~ 'Q ~ a m a w ~ n"t r l; f ~ ~ ~ q u m a r•i 9. ' V ~ d 0 s~ ~ ~ a a l., 7r a o \ \ G ~ o 13055 -iS4 ~p ~1~4 x ~ ~ \ , a~ b~C ~3w~ ~Yn da y yh -P63/ ( l4 \ x _ - o~' \ ~ ~ ~~~3$8II4~4 \ ~ -bi.4 \ ' x ~ \fa7 - ~ x , . REVISED 1 G/02/06 RELOCA 1FD P/ER, L 4 TED PIER, LOCATED EXIST. CHANNEL. PER GAM, EL PER CAMA- RE U1SED 3/1 fi/06 ADDED SOUNDJNGS ~ o ~i-o i SOUNDINGS PER CAMA Engineers X if.1 -15.4 -17.1 MC~D~~~'~ ~n~ r' Planners Surveyors X x ~ ~5::::., j t+~&Associates,-Inc. ~ ; KP~ ~tJ aU~~ Since 1918 / ~ ) , _ 107 EastSecordStreet 6~3t F~ 6131 Falls of Neuse Road, Suite 300 Greenville, NC 27658 252 752-4135 Ralei h g Raleigh, NC 27609 (919) 848-3347 i~ 70 SLIP DOCK PLA ~ ;,i LEGEND DOCK PLAN SOUNDINGS x _ za6 I / C~s~' a~, HAWKIIVS CONSTRUCTION AND LlE"UE r ~ )N AND DEVELOPMENT, INC. ' NUMBER 7 TOWNSHJP, CRAVEN COUNTY VEN COUNTY, NORTH CAROLINA i SCALE ' DRAWING N0. PROJECT P PROJECT NO.: SHEET iP = 40 Z -23~~ 2'~l~ ~'~2' ' OF f.~ _