HomeMy WebLinkAbout20190551 Ver 1_20190551 Ver 1_CAMA Major Permit No. 51-19_20190624_20190624Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Permit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Permit Number
51-19
Issued to Glenn and JoAnn Walthall 3922 Pineway Dr., Kitty Hawk, NC 27949
Authorizing development in Dare County at adi to man-made canal off the Albemarle
Sound at 3922 Pineway Dr., in Kitty Hawk as requested in the permittee's application dated 3/18/19,
including attached workplan drawings (2) both dated 3/19/19
This permit, issued on June 24, 2019 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
)f these terms may be subject to Tines, imprisonment or crvtr acuon; or may cause LIM IJGIIIIIL rV U� ,Iu,. a = .�_�•
Shoreline Stabilization - Bulkhead
1) The bulkhead shall be constructed in accordance with the alignment depicted on the attached
workplan drawings.
2) No open water shall be excavated or filled, even temporarily, outside of the approved bulkhead
alignment.
3) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a
representative of the Division of Coastal Management within a maximum of 30 days prior to the start
of construction.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2022
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
slgnen by me aumorlty oI me JecIetury UI un w=u uIc w=ai.
of the Coastal Resources Commission.
�- fft4i
Braxto . Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Glenn & JoAnn Walthall Permit No. 51-19
Page 2 of 3
ADDITIONAL CONDITIONS
4) The bulkhead shall be constructed prior to any backfilling activities.
5) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
6) The fill material shall be clean and free of any pollutants except in trace quantities.
7) All backfill material shall be obtained from a high ground source and confined behind the permitted
bulkhead.
Sedimentation and Erosion Control
8) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of
grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
Docking Facility
9) This permit authorizes only the dock, pier, separated platforms, tie pilings and other structures and uses
located in or over the water that are expressly and specifically set forth in the permit application. No
other structure, whether floating or stationary, shall become a permanent part of this docking facility
without permit modification. No non -water dependent uses of structures shall be conducted on, in or
over Public Trust waters without permit modification.
10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
11) This permit authorizes a maximum of 5 formalized boat slips, (three located at the main pier and 1 at
each of the separated platforms).
12) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
General
13) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
14) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the
permitted activity without having it transferred to a third party.
15) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
Glenn & JoAnn Walthall Permit No. 51-19
Page 3 of 3
ADDITIONAL CONDITIONS
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW -2019-00769).
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4175 and assigned the project DWR Project No. 2019-0551.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 264-3901 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the normal water level.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee also
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.