HomeMy WebLinkAboutNCG080814_Returned Renewal Ltr_20181115ROY COOPER
oavo?w
MICHAEL S. REGAN
secreuuy
WILLIAM E. (TOBY) VINSON, JR.
in Won Pit ector
Charlotte Area Transit System
,Attn: Jimmy Fox
3145 S Tryon St
Charlotte, NC 28217
SZN'aZR
ATTEMPTED
N-T M N
UNASi-5 "1'0
fZ OR WAR, U,
e 7 - B S
November 15,2018
Subject: NPDES S tarmwater Peratit Coverage Renewal COC ONCGO80814
Dear Permittee-
For coverage under Storrawater General Permit NCGO80000, the Division of Energy, Mineral,
and Land Resources (DEMLR) is notifying you that your reissued. Certificate of Coverage
(COC) is available. This permit is reissued pursuant to the requirements of North Carolina
General Statute 143-215.1 and the Memorandum of Agreement between the state of North
Carolina and the U,S. Environmental Protection Agency, dated October 15, 2007 (or as
subsequently amended.)
You must access and print a copy of your new Certificate of Coverage (COC) via this website:
httDs;//edoes,deq,,nc,gQv/Forms/SW-CQC-RenewaI
Also, youtriust obtain a copy of the new NCG080000 General.Permit front our website here:
https://deo,ne.i,.ov/about/divisi.oiisl'energL-i,nineral-land-re,,sources/des-stormwatcL-gps, In
addition to the full permit, the 2018 print package on the websitc, includes revised monitoring
forms.
The General Pert -nit authorizes discharges of stormwater, and it specifies your obligations with
respect to discharge controls, management, monitoring, and record keeping. Please review the
new permit to familiarize yourself with all changes in the reissued penrnit, Significant changes
to the General Permit are outlined in documents available on the website above. Your
facility has six months from receipt of the permit to update your Stormwater Pollution
Prevention Plan (SP.PP) to reflect any new permit requirements,
E MQ�
ft\ '00'W-1
ISMF
North Carolina Oepartmnt Qualfty I DlvWm of Energy, Minera.1 ar, d Laad Fe sources
512 North Salisbury Street 1 1612 Mail StrvIce, Center I Ral0oh, North Caralinp-276149-1612
919,107,4200
How does the new General Permit affect Tier Status?
The first sampling period in this General Permit begins on January 1, 2019. Tier 3 actions in
Pail IV of your permit are triggered by benchmark exceedances on four occasions beginning on
the effective date of this permit and do not count prior exceedances. Likewise, Tier 2 actions
are triggered by two consecutive benchmark exceedances beginning on the effective date of
this permit and do not count prior exceedances. However, if your facility is already in Tier 2
(monitoring stormwater discharges monthly) orTier 3, you must continue monthly monitoring
until relieved through conditions of the permit or by DEMLR staff approval,
fflien does electronic DMR reporting start?
We are working toward on -boarding permittees with NPDES stormwater permits into the DEQ's
eDMR system next year. Permittees will receive notification when our eDNIR system is
ready for registration to begin reporting monitoring data electronically. If you have any
questions about the status, please contact Bethany Georgoulias at (919) 707-3641,
Your coverage under the General Permit is transferable only through the specific action of
DEMLR. This permit does not affect the legal. requirements to obtain other permits which may
be required by the N.G. Department of Environmental Quality (DEQ), nor does it relieve the
permittee from responsibility for compliance with any other applicable federal, state, or local
law, rule, standard, ordinance, order, judgment, or decree,
If you have any questions regarding this permit package please contact the DEMLR Storrnwater
z7b
Program at (919) 707-9220.
Sincerely,
for William E. (Toby) Vinson, Jr,, P.E,, CPM.
Interim Director, Division of Energy, Mineral, and Land Resources
cc: Storm -water Program permit file