HomeMy WebLinkAboutU-5706 CP2A sig form 061419.docDocuSign Envelope ID: 4041 CC3A-F9FF-4883-86CE-1 133B396CABC
NEPA/4O4 MERGER TEAM MEETING AGREEMENT
Concurrence Point No. 2A: Bridging Decisions and Alignment Review
PROJECT NO./TIP NO./ NAME/DESCRIPTION:
Federal Aid Project Number: NA
State Project Number: WBS Element 50157.1.1
TIP Project Number: U-5706
TIP Description: Eastern Rockingham Corridor Study — Proposed new connector
between US 74 Business and SR 1909 (Richmond Road)
The purpose of the project is to provide direct connectivity between commercial areas along US 74
Business and residential areas northeast of central Rockingham and reduce conflicts between through
traffic and local traffic on Long Drive.
The Project Team concurred on this date of June 14, 2019, with the following structures on the
major stream/wetland crossings along the project alternatives:
SITE
STREAM
WETLAND ID
HYDRAULIC
STRUCTURE
1
Hitchcock Creek Tributary 2
N/A
1 @ 66" RCP
2
Hitchcock Creek Tributary 1
N/A
1 @ 66" RCP
3
N. Prong Falling Creek
WAF
3@12'x8' RCBC*
4A
N. Prong Falling Creek
WU
140-foot bridge
4B
N. Prong Falling Creek
WU
140-foot bridge
*-Existing culvert. It is expected the existing culvert can be retained and extended.
US Army Corps of Engineers
US Environmental Protection Agency
US Fish and Wildlife Service
NC Wildlife Resources Commission
NC State Historic Preservation Office
NC Division of Water Resources
Lumber River Rural Planning Organization
NC Department of Transportation
DocuSigned by:
". L A _ll/ 6�17/2019
311178cFo4nrAn1 U,t,U/
EDocuSigned by: �p
Q,Ma,liLt 6U s0641t V� 119
dA37nAQFDd574nR
Docusigned by: 6/14/2019
_)U c�a.NA A,
5n1BADR77Cd9d52
DocuSigned by:
6/14/2019
'Craves WASOA,
31585DOB682E436...
gneby:
DocuSid
��
EDocuSigned by: 6/17/2019
03BAC6376A6340D...
DocuSigned by:
_. _ 1 96k 6V, 7/2019
AAF�F95F21FFRQ4R7
DocuSigned by: 6/17/2019
7nRRFnSF6RD0474