Loading...
HomeMy WebLinkAboutU-5706 CP2A sig form 061419.docDocuSign Envelope ID: 4041 CC3A-F9FF-4883-86CE-1 133B396CABC NEPA/4O4 MERGER TEAM MEETING AGREEMENT Concurrence Point No. 2A: Bridging Decisions and Alignment Review PROJECT NO./TIP NO./ NAME/DESCRIPTION: Federal Aid Project Number: NA State Project Number: WBS Element 50157.1.1 TIP Project Number: U-5706 TIP Description: Eastern Rockingham Corridor Study — Proposed new connector between US 74 Business and SR 1909 (Richmond Road) The purpose of the project is to provide direct connectivity between commercial areas along US 74 Business and residential areas northeast of central Rockingham and reduce conflicts between through traffic and local traffic on Long Drive. The Project Team concurred on this date of June 14, 2019, with the following structures on the major stream/wetland crossings along the project alternatives: SITE STREAM WETLAND ID HYDRAULIC STRUCTURE 1 Hitchcock Creek Tributary 2 N/A 1 @ 66" RCP 2 Hitchcock Creek Tributary 1 N/A 1 @ 66" RCP 3 N. Prong Falling Creek WAF 3@12'x8' RCBC* 4A N. Prong Falling Creek WU 140-foot bridge 4B N. Prong Falling Creek WU 140-foot bridge *-Existing culvert. It is expected the existing culvert can be retained and extended. US Army Corps of Engineers US Environmental Protection Agency US Fish and Wildlife Service NC Wildlife Resources Commission NC State Historic Preservation Office NC Division of Water Resources Lumber River Rural Planning Organization NC Department of Transportation DocuSigned by: ". L A _ll/ 6�17/2019 311178cFo4nrAn1 U,t,U/ EDocuSigned by: �p Q,Ma,liLt 6U s0641t V� 119 dA37nAQFDd574nR Docusigned by: 6/14/2019 _)U c�a.NA A, 5n1BADR77Cd9d52 DocuSigned by: 6/14/2019 'Craves WASOA, 31585DOB682E436... gneby: DocuSid �� EDocuSigned by: 6/17/2019 03BAC6376A6340D... DocuSigned by: _. _ 1 96k 6V, 7/2019 AAF�F95F21FFRQ4R7 DocuSigned by: 6/17/2019 7nRRFnSF6RD0474