HomeMy WebLinkAbout20190319 Ver 1_20190319 Ver 1_CAMA Major Permit No. 50-19_20190624_20190624Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
V ermit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Permit Number
50-19
Issued to Christopher and Tammy Perry, 110 Binnacle Ct., Elizabeth City, NC 27909
Authorizing development in Pasquotank County at adi. to a man-made canal & the Pasquotank
River, at 2137 Rivershore Rd., in Elizabeth City, as requested in the permittee's application dated 2/19/19,
including attached workplan drawing (1) dated 3/1/19.
This permit, issued on June 24, 2019 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
>f these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null ana vola.
Shoreline Stabilization - Bulkhead
1) The bulkhead shall not extend waterward more than 2 feet from the existing bulkhead at any point
along its alignment at the time of construction.
2) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a
representative of the Division of Coastal Management within a maximum of 30 days prior to the start
of construction.
3) The bulkhead shall be constructed prior to any backfilling activities.
4) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2022
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
d Br ton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Christopher and Tammy Perry Permit No. 50-19
Page 2 of 3
ADDITIONAL CONDITIONS
5) The fill material shall be clean and free of any pollutants except in trace quantities.
6) All backfill material shall be obtained from a high ground source and confined behind the permitted
bulkhead.
7) No backfill material is to be placed within 30 feet of the normal water line, except that which will be
used to backfill the area behind the permitted bulkhead.
8) All fill material to be placed below mean high/normal water level shall be confined behind the permitted
bulkhead.
Groin
9) The alignment of the authorized groin shall be verified by a representative of the Division of Coastal
Management within a maximum of 30 days prior to the start of construction.
10) The groin, as depicted on the attached workplans, shall not extend more than 25 feet waterward of the
normal water level at the time of construction.
Docking Facility
11) This permit authorizes only the dock replacements, piling removals and basin walkway, and other
structures and uses located in or over the water that are expressly and specifically set forth in the permit
application. No other structure, whether floating or stationary, shall become a permanent part of this
docking facility without permit modification. No non -water dependent uses of structures shall be
conducted on, in or over Public Trust waters without permit modification.
12) The authorized replacement of the docking facilities shall not exceed the footprint of the existing
docking facilities.
13) This permit authorizes a maximum of 3 formalized boat slips. Two slips are located at the canal basin
docking facility and one shall be located at the river docking facility.
14) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
Sedimentation and Erosion Control
15) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of
grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
Christopher and Tammy Perry
ADDITIONAL CONDITIONS
Permit No. 50-19
Page 3 of 3
NOTE: An Erosion and Sedimentation Control Plan may be required for this project if upland
disturbance is greater than 1 acre. If required, the plan must be filed at least thirty (30) days
prior to the beginning of any land disturbing activity. Submit this plan to the Division of Energy,
Mineral and Land Resources, Land Quality Section, 943 Washington Square Mall, Washington,
NC 27889.
General
16) This permit does not authorize any open water excavation, even temporarily.
17) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
18) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the
permitted activity without having it transferred to a third party.
19) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW -2019-00422).
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4175 and assigned the project DWR Project No. 2019-0319.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 264-3901 prior to the commencement of any
such activity for this determination.
NOTE: The permittee is advised that many non -water dependent activities are not authorized within 30
feet of the normal water level.
NOTE: An application processing fee of $400 was received by DCM for this project. This fee alsc
satisfied the Section 401 application processing fee requirements of the Division of Water
Resources.