Loading...
HomeMy WebLinkAboutWQ0040897_Application (FTSE)_20190621VVQ0040897 p,ogram, Category Non -discharge P 0 ;•vmit T, v Pe Gravity Sewer Extension Pump Stations, & Pressure Sewer Extensions Pr4r-nlary ; eviovv'er dean hunkele Coaqtal SWR�fle Ps,irnitted Fto%rf Facility Name Site 2 MCAS Fuel Farm 8 Pump Station Abandonment Location AddiresS Ovivner Narne Commanding Officer Marine Corps Base Camp Lejeune Central Files APS SVVP b/281/2019 Permit Tracking Slip Status P roJect Type In review New Protect Ve-sion Pe3mit C�iassfficat;on A Individual Permit Contact Affi'iaflon hrbior/Minor peaioin Minor Wilmington County Onslow FacMlw Contact Ai.'Waflon Dvvner T1 ype Government - Federal Owner Affiliation John R. Townson Mcleast-McB Camlej G-F Emd End 12 Post _n D a t o slE v e n S Camp L&Jeune NC 28547 Scheduiled- odg Issue App Received Draft 1pi'dated tSsuance 5/20/2019 t ea, U Qtc-C' rzt�-v oubile Notice Issue Effective Expiration Even's Additional information requested Additional iniormation received State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: A {to becomp leted by DWR) i Uil �W, W U _0 rl�0412011 CNNJIVFD�l �4) 1. Applicant's name: Marine Corns Base Camp Leieune. North Carolina (company, municipality, HOA, utility, etc.) 2. Applicant type: n Individual El Corporation F] General Partnership El Privately -Owned Public Utility ED Federal [:] State/County Municipal El Other 3. Signature authority's name: Neal Paul per 15 A 6 0'-� --- CAC u6i Title: Deputy Public Works Officer G-F/Public Works 4. Applicant's mailing address: 1005 Michael Road City: Camp Leeune State: NC Zip: 28541 --j- 5. Applicant's contact information: Phone number: (210) 451-2212 Email Address: neal.vaul(i�usmc.mil 11. PROJECT INFORMATION: T Q L Project name: Lift Station Reset (Site 2 -q C—A tvt, � "Vvn J q e- 2. Application/Project status: Proposed (New Permit) E] Existing Permit/Project If a modification, provide the existing permit number: WQOO Unk and issued date: If new construction but part of a master plan, provide the existing permit number: WQOOO 3. County where project is located: Onslow 4. Approximate Coordinates (Decimal Degrees): Latitude: 34.721 V Longitude: -77.4497' 5 Parcel ID (if applicable): N/A (or Parcel ID to closest downstream sewer) I. Professional Engineer: Joseph C. Avolis, PE, PLS License Number: 15360 Firm: Avolis Engineering, PA Mailing address: PO Box 15564 City: New Bern State: NC Zip: 28561- Phone number: (252) 633-0068 Email Address: avolisen2ineerinp-(&,embarcimail.com 1. Facility Name: French Creek Permit Number: NC 0063029 Owner Name: MCB Camp Lejeune V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Unk Downstream (Receiving) Sewer Size: 10 (Force Main) inch eijua,� Nj- ��bc, sWQCS - Owner Name(s): FORM: FTA 04-16 Page 1 of 5 V1. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? 2. If the Applicant is a Developer of lots to be sold, has a Qe-vtjo s Opga--- J, , , 1 Ak 'i _" i,ti 'i ,,11: _' EV been attached? 3. If the Applicant is a IJJ e-fs'Assfir, r, tion, !has an 'R M: M been attached? FX_10 �� 4. Origin of wastewater: (check all that apply): F] Residential Owned E] Retail (stores, centers, malls) M Car Wash El Residential Leased F] Retail with food preparation/service El Hotel and/or Motels El School / preschool / day care Z Medical / dental / veterinary facilities [I Swimming Pool /Clubhouse 0 Food and drink facilities El Church El Swimming Pool/Filter Backwash Z Businesses / offices / factories E] Nursing Home [] Other (Explain in Attachment) 5. Nature of wastewater: 95 % Domestic/Commercial % Commercial 5 % Industrial eg .15 A 1" 0; IF 0` 10'312 0)) L------>Is there a Pretreatment Program in effect? Z Yes E] No 6. Has a flow reduction been approved under i 5A N C' J 0 1 1 A i -) [:]Yes RNo > If vesgvrovide a coov of flow reduction avoroval letter 7. Summarize wastewater generated by project: Establishment Type (see 021 _ Daily Design Flow a,b No. of Units Flow See attached for quantification of new gal/ GPD pump station flow from existing facilities - gal/ GPD No New Flow gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 0 GPD - - � a See I � " for caveats to wastewater design flow rates (i.e., minimum flow per A N,'-' 02 0 1!, 0b) Jel_ J ", , " ,Igj dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in �.S, 42A-4). b Per 15A NCAC 02T .0 1 14(c), design flow rates for establishments not identified [in table I A N""AC Q,23 41 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 0 GPD (per J, 5, P'C A C 02'-,5 0 ' 11 - 14) > Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: [] Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line El Flow has already been allocated in Permit Number: 0 Rehabilitation or replacement of existing sewer with no new flow expected [:] Other (Explain): FORM: ETA 04-16 Page 2 of 5 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 3665 PVC 8 1207 DIP � Section 11 & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria > Section III contains information related to minimum slopes for gravity sewer(s) > Oversizing fines to meet minimum slope requirement is not allowed and a violation of the MDC VI. PUMP STATION DESIGN CRITERIA (If Applicable) & MDC 11 -UM � a�� --H COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT I . Pump station number or name: Site 2 2, Approximate Coordinates (Decimal Degrees): Latitude: 34.7222' Longitude: -77.4518' 3. Design flow of the pump station: 0.02415 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 734 gallons per minute at 61.6 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6 94 DIP 6. Power reliability in accordance with 1-N-(1A-i'1`-' 011.0'30)5 , 0 Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B)-,- > Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day � Must be permanent to facility Cr if the pump station has an average daily flow less than 15,000 gallons per day: E] Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or El Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): > It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. > If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. I FORM: FTA 04-16 Page 3 of 5 () � " j �Z I fl, �- " kA 1. Does the project comply with all separations found in ';5A NC_A,_,_'_'_ Z Yes D No > 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet "Any private or public water supply source, including any wells, WS-1 waters of Class I or Class 11 impounded reservoirs used as a source of drinking water 100 feet "Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HOW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet "Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet ,Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches `Nbf 0 2T 03-05) 4 `) contains alternatives where separations in 02 4 ER, fl cannot be achieved. > "Stream classifications can be identified using the Division's 11,'C Surf ce Watef _Msab­3nS, webDa;" If noncompliance with 1021",030�f-1`1 g- ky see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) 0 Yes [:]No [:] N/A �> See the Division's draft separation requirements for situations where separation cannot be meet > No variance is required if the alternative design criteria specified is utilized in design and construction > As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per `5A 1 tCAC'02_13 .020,0? E]Yes E]No UN/A > This would include Trout Buffered Streams perNIC-AC 2-RAQ10" 4. Does the project require coverage/authorization under a 404 Nationwide or E]Yes 0 No individual permits or 401 Water Quality Certifications? > Information can be obtained from the AO indn"4 10. 5. Does project comply with -15 A ',­-TCA,C 0, 2' 1", 0' 10 (additional permits/certifications)? 0 Yes E] No Per ID A 0`2 J , UQ I Q (6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per Q "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer, El Yes 2 No El N/A > If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per I. NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 1. Does the submitted system comply with-2- the Mj'_ gnwil,Q� teji f6i tl_� Oenal-fflti_" LY of pu -SLarams F, and the G,,&- vi v t'A� "n -III 1_,es c-'Ji-r-'a n), as applicable? _,rce 1%A i­!s -a 1 IRI 0 Yes [:1 No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. ADuroval of the reauest is reauired vrior to subnflttal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: 0, A-vr (Professional s name from Application Item 111. 1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $ 10,000, as well as civil penalties up to $25,000 per violation. 9071011T.4171111 RUTINJUVE, m7n, V1 MT.i 111; 11! 1 11 3. Applicant's Certification per 15ANCAC 02T.0106(b): I, aokt ikk_kVC_ U�L� C C�,- P - \ �1, JV3V, c- attest that this application for (Signature Authority's name & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE - In accordance with General Statutes i4 3-2 ,6y". and 161 3--2,i 5,6-, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $ 10,000 as well as civil penalties up to $25,000 per violation. Date:, FORM: FTA 04-16 Page 5 of 5 � � � � ��"' y P K /00 E 1 -I u " A_ A /2--Z/4- -* t Al I a L+ =-49 a 0 - ' 1 II r Project Narrative Lift Station Reset Site 2 N-ra U M e2 on of 7om eig -erent pump stations in tne general area of the MCAS New River fuel farm. The pump stations range from a small station serving a single bathroom to a larger station serving several administrative buildings. In all eight existing pump stations will be eliminated by this project with one central regional station being constructed. 4,872 linear feet of new 8-inch gravity main will be constructed by this project in order to bring all of the flow to one central location. The new pump station will discharge into the existing 10-inch force main in the area where all of the flow presently goes and on to the Camp Geiger existing regional station. There will be 94 linear feet of new 6-inch force main. -7111�11 ME, _$% ® _ \;< ad > = s r 2 ? f > » 6«« ? < 2®f®wmC) uj u t < )< ƒ / a �<< � �.« * » m \\\$/ 7 $ / d \�/& � }�}Lij /k /. ... : .. ... . .. . . .. .. . .... )�/�L± b AS120 � S17 AS121 = xP z ui m W Eb W z` -zo O i o ' H 48 a a z� W�wN ti a x w n O� W S to X m w ®EJ >aza a � czi x�ia o ta3' .. ,. 8 u gtg 148 z 9 - o z w c�a c� U LU Cd �