Loading...
HomeMy WebLinkAboutNCG020173_Compliance Inspection_20190514Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY May 14, 2019 Martin Marietta Materials, Incorporated Attention: Mr. Richard Broughton 8701 Red Oak Boulevard, Suite 540 Charlotte, North Carolina 28217 Subject: Compliance Evaluation Inspection NPDES Stormwater Certificate of Coverage- NCG020173 Mecklenburg County, North Carolina Dear Mr. Broughton: ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director P.Az-n''11 sr, oFMAy�3? � rhf�ll'1NG Enclosed please find a copy of the Compliance Evaluation Inspection Reports for the inspections we conducted at Mallard Creek Quarry on May 9, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (704) 663-1699 or by email at angela.lee@ncdenr.gov. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosed: Inspection report c: Stormwater Permitting Branch Compliance Inspection Report Permit: NCG020173 Effective: 10/01/15 Expiration: 09/30/20 Owner: Martin Marietta Materials Inc SOC: Effective: Expiration: Facility: Martin Marietta -Mallard Creek County: Mecklenburg 575 E Mallard Creek Church Rd Region: Mooresville Charlotte NC 28213 Contact Person: Richard Broughton Title: Phone: 803-978-6275 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/09/2019 Primary Inspector: Angela Y Lee Secondary Inspector(s): Certification: Phone: Entry Time: 01:50PM Exit Time: 03:1 OPM Phone: 704-235-2139 Holliday Keen Phone Matthew J Gigante Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG020173 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 05/09/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: This inspection was conducted as a routine annual inspection in conjunction with a mine inspection. Richard Broughton from Martin Marietta was present for the inspection. At the time of the inspection, the site was in compliance. Page 2 of 3 Permit: NCG020173 Owner - Facility: Marlin Marietta Materials Inc inspection Date: 05/09/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ®❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ®❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ®❑ ❑ ❑ # Does the flan include a detailed site map including outfall locations and drainage areas? ®❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ®❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ® U U U # Does the facility provide all necessary secondary containment? ®❑ ❑ ❑ # Does the Plan include a BMP summary? ®❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ®❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ®❑ ❑ ❑ # Does the facility provide and document Employee Training? ®❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ®❑ ❑ ❑ # Is the Plan reviewed and updated annually? ®❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ®❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ®❑ ❑ ❑ 16TOT,-� Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ®❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ®❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: 3 sediment basins, 1 outfall Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ®❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? M ❑ ❑ ❑ Comment: Page 3 of 3