Loading...
HomeMy WebLinkAbout20170730 Ver 2_U2579C Sediment Loss_20190620Wanucha, Dave From: Euliss, Amy Sent: Thursday, June 20, 2019 10:05 AM To: Wanucha, Dave Cc: Suggs, Phillip H; Panek, Lindsey F; Kiser, Marcus K; Essa Rizkallah (erizkallah@drmp.com) Subject: U2579c sediment loss The U2579C project had a sediment loss into site 3a following a 1.6" rain even on Tuesday night. Pockets of sediment for a couple hundred feet accumulated in the stream channel. The pockets greater than an inch will be removed from the stream channel. The erosion control measures are being repaired and revised. Let me know if you have any questions. Amy Get Outlook for iOS it all correspondence Co oird frorr ffils soirder is sulcjcc. �o Hie IN C I':"ulc Ic. IRcc;ords I ow oird i°r ay be disclosed Sxo ffili'd Icortio;,,,