HomeMy WebLinkAbout20070324 Ver 1_Application_20070226~daa STATE
~,~~~,
STATE OF N ORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY DIVISION OF HIGHWAYS
GOVERNOR
February 23, 2007
Ms. Sonia Gregory
NCDWQ
401 Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
Subject: Nationwide Permit # 14 & 33
SR-11141 Moore County
Project # 8B.206321 (DWQ Permit Fee $200)
Mr. Spencer:
~~~
~ ~~
FB ~ ~/
~ 1 ~'~
Y.:~~
,y 5'A F~'~(,'.
~~7'~!9TE~~?'
R~~~~y
LYNDO TIPPETT
SECRETARY
Richard K. Spencer
Regulatory Division
U.S. Army Corps of Engineers
PO Box 1890
Wilmington N.C. 28402
07~;`>.4
The North Carolina Department of Transportation, Highway Division 8 is requesting Nationwide
Permit Numbers 14 and 33 for project # 8B.206321 on SR 1141 (Robert Road) in Moore County.
The proposed project will replace an existing deficient crossing pipe as follows:
Site 1-Replace existing 2 lines of 84"x 40' CMP with a 2 lines 128"x 83"x 80' CMP.
This pipe is being replaced in anticipation of a scheduled grading and paving project. The amount of pipe length
increase (40ft.) is needed to accommodate an improved angle to the streambed, and to allow the widening and
raising of the roadbed. The new pipe is being placed on a skew of 105° to the centerline of the road to improve the
hydraulic flow of the stream.
The total percentage of impervious surface within the project area will remain at less than 30%. All erosion control
devices used on the project will be appropriate to the location and in compliance with the current version of the
NCDOT Best Management Practices manual (BMP). The crossing is located on an Unnamed Tributary of
Drowning Creek, a class WS-II; sw; HQW stream within the Lumber River basin. All construction activities at
this location will be done in compliance with conditions listed in the current BMP manual, for projects built within
areas of High Quality Waters, WS-II. Construction will be done under dry conditions whenever possible. There
were no threatened or endangered species observed within the project area during the required minimum criteria
check. This project will require an off site detour using near by state roads.
If you require any additional information, please contact me.
Since y,
C_-'
Art C. King
Division Environmental Officer
Highway Division 8
cc: Tim Johnson, PE
Tim Welch, PE
Barry Harrington
P.O. BOX 1067, ABERDEEN NORTH CAROLINA 28315
PHONE (910) 944-2344 FAX (910) 944-5623
~
J
f I '! / ,A I I ~i I ~ `1 -A b'~1- 1. )P (~1 \ IA } ~ /~ t~ ~ .1 ~ ~ ~ 1 ~ ~ l ^~ ( ~`
1 ~ ~~ -'
•
F
I Lih ~ ~ ti~ ,, /if( \~/ 1 1. ~
~ //~j~ A ~ )'~ ~A ~ 1 1 ~ ~ ~ ~ ~~~11 r
`
~ ~ ~` V "~
f
. ~S ,v, .: ? ,., ~, Vii,
L
~ _
~'
`
- ~t i~ ,r riri
~ c
~ ~--,
t 1,~
v
So- " ,~ ..
1 ,,
I • ~ ~i 1 r~ mss, ,
,~,--,
I ~
~,= ~ ~%
~
~ r ~r-
' ~.\ j ~;
\~
r
j ~
~
~~ ; ,
. \ ! ~~
J
y
1
i 1 1~~ \ / •~~~ '-~.~,
~
, r,' / b! ., ti
<
r
_
~~
- ~~~~,~ ~ -;„ ,, ,
,
~~ ; ,.. i
1-,
,
! ~
~ I
i v ,.
, ,. y ,,
<
____
~~
- ; A . \
A~ `=w`_"-~- I
i C r~v^ i ~ 1, ~ ~ /
i r r ~
~~ - . ~ ~ ~ ~~! 4
~ I ~' Vvvv/ _
~ ~ i ~ 1~-~
~
~ 1 ~ ~
~ ~ r~l\ -~
F
~
~ ~
r
~ 1
~
i ~ ~
~
\ ~ ~ ~ ~~ /l C tJJ
\ :~, '. l~ I~ L
q1 / I
_
/ ~i li l ~~~~~ ~.1
1 _
\ ~~
! 1 ~ ~ [ ! rr
i '
r \~ ~~\~/C ~ 1 71 _
1' ~ _ - ,
I ,I~r `! /
~\,`~ll~ ~~ J~f~~ ~~i', \ Jii~ /-''~// 1~
~
~
l tu , /~~ ~i \\I~~~--
\ . /r ~~ ~r i/ i y~ ~,
I
j ^ '
l
/
n ~
'~ ~ 1 /•-- I ~' ~ - ~ J
I
\~ ~,
1~~~ r (I`\ \ ~~
l \ r~ ~ t 5 /.
/ Il }' `
\ \ 1 ~ ~ { ~\`~%-
~ ! l~ II 11 ~ 1
fI J I ~' :.
~1 ~ ~ ~~ ~ ,vv\~ l11r'~~ii' l ~ ~~~~I ~i/. "~ ' :~~~~ j ~ <__ i~-~i%Hiv ~,~`~~`~\~ ~~
35°-1 ~ - i \ - ~,
/ ~ ~ i ~i 7 - / ~ ~~
c ,..
` l4 ~ ;aianvr `~~57~
c~tlvnal nst~~~ \ ~ ~ ~r,V 1 \`~-_
~
~ i~~t -- L ,~ \
'f~ ;` r / \j ~ !,/ rn ,~ 1
• ~ ~) < l ~-~ ~/J/I~,~ ~~
~) ~- ~ `~~ ..
~ ~~+
i
~
~~~ ~ ~1 j~~~~1,1 ~ ~~~~ ~! ,~\
~
~~~-~ 4f yff >1 ~ ~A` ~~r _ :~ ~ ~'~~~ ~ ~Jlr /~l ~\.~~'~.~ ,
~ l~lll ~ ~~ ~p
X639 ~ I
~ ~
~~
~ ~ %~~}
gA
{1'
~
lld2 r f ~ ~~ ~~
~
\""~ '~
~ f
~ ~~
~ ~ ~ f '
~~ ~.,
,A\ -,___~, G h ~
~) -. , ~ _ i /
~ '
~ ~ ~ r . ~.~ ,I I r
~ ,1 ~ ')I ~-!~ ~~
~~ ~ l
~
•
~~ rf~~ /,~
y~ V ~i~ f 137 ~
I A ; ~
=
CrahoFl~ ewE
__
~\
_ f \ . J
,./ ~
~ ~
~r r
~ i ~
-
,. j.
.-~ rr
~~ c
0
_ n
n~..__.~ ~ ~
_ ~ ~:
° ~ ETI ~ o \x591
-v, ~ ~` ,.
_ ~ ~3~~.
S ~~~~ ~ tr ~ '6~~~ n~ ! :\ ~~~ ~ 4
/
~ l y I~~
~/
U / .:. ~
/
6
11 .J..
, 6S,
• .-
~'{~
y
- ~ o L ~S ~~160T
t y -
/
Y ~ t)4 i'~ t 1~ su_ Q$
-
_ .1r
I r~ ,~ ~
~ ~ ~ ®. ~
i ~~ ..
1 i ~~
, f ,~~
j 9Ba J
~ I !
~ l~
C~ _ _ _
... . . , _ ;; ' ~ 5 3 ~ ~.
d
.. - _.:c_
_ _._. ;
~ ~! 636x
~ ~~
~
S ''''''~~~ ~:'~
~ _ ~ ~l
3
^'
+ 1"~
~ f^f
e
1
\ '
x
617 ' xsoe ~
~ l~ { f ,
r
9 _~~~~
h tl
3 D TopoQuads Copyright ®1999 DeLorme Yarmoutq, lYlE U4U96 source llata: uaw f--11000 ft Scale: l :25,000 ll~ai1:13-u llamm: wwaa
~ ~, ~ ~~
J'I ~I
ill -y'~ C-6pp ~' ~~ ~ l p
( r~ II ~ A
T . rj ~ ~ / ~~
~ t J ( I G pp ~ ~„ 0 ~~, i w
1 ~
~
~ ~ ~`r+
/ ~~~
`
A
I' ~
~ l j
~ '~1 ~ ~{~( C~
~ ~ _ ..,~ , .
~"
Z --'~/l~r ~~.~I j1 r-a'
. , ,r <..-,_.
-
~
l~
~ i--~ -x
,J 'it ~ ,~1-~
~- > . l~~ ~, , ,
~
-~ lf~.l,~ ~~ d \~
1~1 j ~ „ ~; ~~
~
~ ~~~ /
. '~.?'j
, ~.~, <, 1,11 ~~~ ~
:,~
'
~
'
' ~
~11Z,,Ip ='~`
~_~ ~ ~-,
\ ~.
=
,
~
_-, ~~`,
~, -
; ~,
~
y~
~~` ~~
a ;,;,1 .~
.
, ~ ,
~ ; ,
:-
;r - :
--~
, 1, !
~
~
N35'°-f 6 - ~~ ~ . \~ t - `7 ~ , /~
` 5' S i f / IW ~ ~ r I"~J t.' ~ e 1• ~ . ..~ ! _` ,--.____
~~ ~~ ~r ~.~- .. } ~ J r~ ;.~ `.. ~~ ,~; , y ~. ~,1
~
=°_~
\~~ I
~~r ~ II ` !''~1 ~ ._,~ ~~ ~ tf1 I J ~ •-~ ~ .,
o~ S•\ ~6~.... ~)
\\ 1 l
,~
41
~~ J % ~
-~
r _
Itl ~. l i ~t - 1 ( 1 ~,
`~
-,, i ~ ~ I ~ V A~~
`- , , \
i ~ ~~ 1 ~~
v ~: -
~/~
~-
~ ~.~~ l) %) ~ I ^» to i ~ / ~ !11 1~ ~ ~ ~ ~ ~.~ n, i. r ~ VI yr ~ ~.1 i~lZ ~/ A~~ ~
~~~1j
t-,.~ -11~(~, ~il~i.~--~~~'~
1~~, •~~iJ( 1. ~-' r- ~~,~~ i I ~~'~ ~MI
1 l ~ ,~, ~ ~~, J ~~~~~~~ ;`~ .~ ~ ~
_ ~,
t ~ ~ ~ / ~~~.~~ ~tl ~~+= ~~il~~
~
~ry ~,~ ,~~r~
~ + ~ - ~~ 1 / ~ ~~;%~_ ~~ j
~ ~`I~
~ i cn / / ~ r \\ /
:
_ a
,._.'~ ( \ ~~ ~~ t ~ ° ~ (~i i ~ ~ / 1 I'~r3 ~` `
~l \ Ai ~-~~- / ~i j 1 t ~ ~ 1 r
~
` t t
~
,ir/ ~-~ ~--' ~ 1 ~r~(i - I ~; , err i ,+
~ >
r i
!-r' -
i
~'
. N,i~
\
~
~~ ~ j r Ir; ~~`` r-.....
` `
.~ ~ , ~, ~~ \~_.
~ ,
! I ~ , ~/ ~ 7 r ~ . ~~1~
~
'~.a \~,^ i 1 }I rM. 9
~ 1, ~ ~ ~ ~ ; I `
~
~,....~~~- - _i .
~
_
~~.. ~s
D ~ Manor
t
T c'tlvnal InSt~ i
~
~ C~i I - ~_
\.,j \ J-~ ~'~
am ~/ f t -
~ \
ri J
~ ~ ~'~
~
' \ /~. /~ ~ ~
), \,,
~
'
r; .\. r,!/ G
T~ .,//~i ~ ~; ~~,~
>~ .~
~ .
`'~~~+
~
, ,I
.
~
' ;,i `~~ ;, ~ ~- .c
~~~~ ~ °' ~
!
~
~ `---,~•,
t . _ .
I
wry , -r'
~<<? 1,, ~ \\~
,,~/ ~ ~ ~~ ~ /
J;i;~ ~ 1
}
_ ,
I
~
,f
' , _
~
~ ~P
J
~~l
~
' ~~ ~` \, ~
ewa
~
~ ' i ~ i1~ ~ ~ ~ )J' . ~,_ '
~
I ~ ~ '
~ \ ,- ~ , ~~h ~
t x'11
~-~ -.i~ l I (
~_ `~ ~
~
r
, ,- ~
~~ i I
~ ~ ~Y
,~ 1137 /r
~
~ ~~
trahanb g
_
;sposa7 ~ -~~~~~`.
/ ~ ` in ~~ ~~
~ ~
~
If ~
., ~
~ i
~~
~
t ~ /~ ~ r t ~a ~
~
p i ! 4? ~ _,~
'
a`
'~.
~4~ - ~!
-~
i
rl j ~ '
o ~"
/ 579X
i ~ ° ~ x 592 ~ {(
I
~
~.~~'
.- .
- i37~
~
~/ ~" h /
^ - ~
~ S 1. ~ 1 .~
ti .1
- ',~
'~-~J7
V ~f ^ x.~5]~L
~ I
~~~I ~ l J q Qg /
e ~s ~~
X41'4: ,y. ~
~ - ~ ~
1
9
~
7 ~ ~ ~ ~~- r °~ .~ ~
t
~
tt ' Z
k
S
i .
Bd 1
'O
-
~ - - 5 3 ~
l
._ ~
~~ ~~ t 6~x
;
_ ,z2
~ i
~ I~/ .
I~ _
~ ~ !f
~
_ s ~.
@ r '
~
x ¢Z7 ~ 699 -~~ i
/1 f ~
~ ~
'J h
/ /l B
(d
b
/
3-D TopoQoads Copyright ®1999 DeLorme Yarmouth, ME U4U96 Source llata: U.~'tiJ f----11000 ft Scale: l : ZS,000 lletall: 13~J llatum: wt~ea
~f
Office Use Only' Form Version March OS
USACE Action ID No. DWQ No. 2 ~ ~ 7 ~ 3 2 4
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
Check all of the approval(s) requested for this project:
® Section 404 Permit ^ Riparian or Watershed Buffer Rules
^ Section 10 Permit ^ Isolated Wetland Permit from DWQ
® 401 Water Quality Certification ^ Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NWP# 14 & 33
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ^
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ^
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ^
II. Applicant Information
1. Owner/Applicant Information
Name: North Carolina Department of Transportation
Mailing Address: Timothy Johnson PE Division Engineer
NCDOT Highway Division 8
PO Box 1067
Aberdeen: NC 28315
Telephone Number: 910-944-2344 Fax Number: 910-944-5623
E-mail Address: tjohnson o dot state.nc us
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: T. F. Welch PE
Company Affiliation: NCDOT Division 8 Bride Maintenance
Mailing Address: PO Box 289
Siler CitX, NC 27344
Telephone Number: 919-742-5649 Fax Number: 919-663-0214
E-mail Address: twelch~dot state nc.usstate nc.us
Page 5 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1141 Moore County
2. T.I.P. Project Number or State Project Number (NCDOT Only): 8B.206321
3. Property Identification Number (Tax PIN):
4. Location
County: Moore Nearest Town: Eagle Springs
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers/names, landmarks, etc.): From Ea lg a Springs follow
SR 1139 approx 1 2 miles turn left onto SR 1140 and g_o approx. 2.3 miles turn ri hg t onto
SR 1141. Site is approx. 0.4 miles.
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): N 35* 15.112' W 79* 40.457'
6. Property size (acres):,
7. Name of nearest receiving body of water: Drowning Creek
8. River Basin: Lumber
(Note -this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at _ _ ~ ._,___ ,_.;_ :,_~__ .)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: RuraUResidential
Page 6 of 12
10. Describe the overall project in detail, including the type of equipment to be used: Replace
existing 2 lines of 84"x 40' CMP with 2 lines of 128"x 83"x 80' CMP. The equipment to be
used for the iob -Excavator and Front End Loader.
11. Explain the purpose of the proposed work: This is an existing secondarX dirt road that is
going to be built and paved The grade at the pipe location is going to be raised approx. 5
feet The additional pipe length is needed for the road elevation change and to skew pipe to
better align with the stream.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
Page 7 of 12
1. Provide a written description of the proposed impacts: permanent impact from pipe
placement Temporaryimpact from dewatering
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
se aratel list im acts due to both structure and floodin .
Wetland Impact
Site Number
(indicate on map)
Type of Impact T e of Wetland
~
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
es/no Distance to
Nearest
Stream
linear feet Area of
Impact
(acres)
NA
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property:
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
,,,,,~+ >,~ ;.,et„rlPrl Tn calculate acrea~e_ multiply length X width, then divide by 43,560.
Stream Impact ~ v
Number
indicate on ma v »~ _ v
Stream Name
Type of Impact
Perennial or
Intermittent? Average
Stream Width
Before Im act Impact
Length
linear feet Area of
Impact
acres
1 UT into Drowning perm Perennial 258 408 0.1
« Temp 40ft
Total Stream Impact (by length and acreage) Perm=40ft
Temp=40ft
Total =808
0.1
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill excavation, dyed in floodin draina e, bulkheads, etc.
Open Water Impact Type of Waterbody e
Site Number Name of Waterbody
Type of Impact
(lake, pond, estuary, sound, bay, Im
act
p
indicate on ma) (if applicable) ocean, etc. acres
Page 8 of 12
NA
Total Open Water Impact (acres)
6. List th
e cumulative impact to all Waters of the U.S. resulting from the project:
Stream Impact (acres): 0.1
Wetland Impact (acres):
Open Water Impact (acres):
Total Impact to Waters of the U.S. (acres)
Total Stream Impact (linear feet): 40ft
7. Isolated Waters
Do any isolated waters exist on the property? ^ Yes ®No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): NA
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
See Plans
VIII. Mitigation
Page 9 of 12
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at _~ _,______ _ . ___~ _ ______. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (lineaz feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount ofNon-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
Page 10 of 12
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federaUstate/local) funds or the use of
public (federaUstate) land? Yes ® No ^
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ^ No
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B ..0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ^ No
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Zone* Impact Multiplier Required
(square feet) Mitigation
1 ~ 3 (2 for Catawba}
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an
additiona120 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or .0244, or .0260.
N/A
Page 11 of 12
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater
controls proposed in order to protect surface waters and wetlands downstream from the property. If
percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed
impervious level. Neither the current impervious cover (stone base) nor the new proposed impervious
cover (asphalt pavementZ would exceed 30% of the total site area. Erosion control devices appropriate to
the site will be utilized on this project which ma,~include silt fences check dams, and storm water
retaining basins - -
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ^ No
Is this an after-the-fact permit application? Yes ^ No
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ^ No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
_ , __ _ __=_ _,_ _ ,_,_ _____ ___.____. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
~-
~~~-'
Applicangent's Signature ~ (Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
"•'M- •l. 1 t 'ti_ ~. y ~Ayf11 ~~ 6C. a'1'Ar[ /f~ lK.
1' )') /
~~ I.T. t?~ile L~/ ~ r0"~`..,A
•~ i. _ 'P
. ~,~• ~
1 ._ Berm ~'ew''"'`- ^ {
-.\~~ LU ,~~,,, `• /. .L1d_' \ ~"dy ~ 11 ' y cameoo yf-6"Pti a:~~'~~~ - /~ _.
~ ""~ r ~~a ~ i lei I r i~r:_ ~ z .~ ~ ,.,~~~p~G7 I\~ ~ '~sL'
_ A y ~^~~ _
\ .~ ~ ~~ ( I f • 1 11St .Y.N ~ /• v~-.
.w ~ ', /+1`I rye f. 1.x11 ~\ ~ ~ ri' YY ~ : ~ Jhn-
~'1 \ `` "
112- _' ../ a'- ;" y ~ w.1..a '~ ~ / _ -~_ l0£1 .;,, •'
'11:.,1 'I ~ / r ~ ~•' _~ ^,r
r ••l '• r - 'a 1 f'~ • 1
115 V HcxccN ~ ~a r },:rye ,%'y~e - : ~•
1. 1 .hiN41 / ~\ i ~ ~ 1 ~ 't
~~ roans \
•~ f - ~ ~ ,' ~ ~. '.`:' i ~'' ~ ~•~ --rte
rv' y \ r,' i• f ~~/' ~ ,' ~ ~ - .,v.ry PINEMURST
, • rar. r.wi
~~ 20~~ ~ .,, ICE ~~1 L~-. _ /:I ~• 4~-. ;, ~
7 ~~ rhea` ~-\ J~1 ~ ).e tmobro ~ ~ - -_~~•/~ •~`~'' "1
e_t~ ~ 18 v -1 ~\ rc.7.ua
_ ~ '"~ ~>
0 ne / ~ /'
W C ~ ~. ~ , v:L~
S 1 ~ / ~ f .ea n.~ f' ~ ~ '~ ~ r,~ ~ 7
~~~~~ • l
~~~ ~ , - ! '
C O U N T Y;~ T e :~;~y
r~r M'-~na C
a wtrur .~
_ i ~ I ,~ ~ uAw.nan k ~ _~i' SC~.7;t.1f~0 i
m -~ / .
' 3
/ ~ yR
(
il
' a /
r
~ i _~
/
~
/
~
~I . `
W -/J' ~~'0 ~ ~` i 1. 1
~/
~ 1 ~ f~`~ `~~ r~ S
\
;."t~~ '~~
a ~ r .. ~ I
: ~ r
fit) .i, I I `I ~~ `
o /. \ y`~i i 1
~
~~~J
~'~l ` ~°~-~.~ ~
I 1 `/~~, ~~~ I •?' ~~ IJ ~ 1 1 `~%~ !S"(( `- 1` ~ ~ . ~` ~, /(- 55 ~ ` ~\ t.~- ~y.'~11 f\
35`(6.6 ~.
i. \ ~'~ `
Y ~, r
t N~
~ l ~~
~\
C
lr
~ •
'
~ `
~•'
~, . ^
~
1
' ~ l
~
'j ,• }, ~+ !( ,,, f ~~~ 1~; ~ ;
'
'
~ .(,` ~ , 1
,J r \
, ~
1
` x-
-
~ %~ •i t `~ , n I ~ 1 1 ~
// 1 ~ ' ~~- 1 r ~~ ~` f/~" l ( ~
_ , ~ ,~ ,~ \• . ~~
~' `~~ p'
1 ~ I`f
/~ Lti' ~ i ~`
35°-156
~\-(~ , ~ eFtlonal nsti ~ ~1 ,/ (~`St ~J ~r l~ \`• F~ C`~, ~~ 1 ' I
_ ` •~ -ti/~`~ ~' \ \r` I^-l { ~.. ~`•
~! 1~ ' -J '~'~1 r/ •1~ ~~~~ j fJ//~ ice ' '
4
;::r ~
f
SA, ,\ -/~
=~~ , ' ~ ('
e
t
~ 1:12i `~`~ ~~
_~ -= ~ \
/ `
1 ~ ''J //
,~ ~ (rte ~-.J/ ~
J \ J - ~i t!
1 ~1 ~•1 ~ ~/ /
?`'/t1 y' ~
' rr~~ ~r /%r
/`
s
` 6~ ~ 11311 •/
~e ~ ~ ~~, ~ .
\
~
` SpoSa: ~ ~\ _
~~
, ;r~ Jn ' ~
\ \~ ,~ 60 ' I ~~~~ L~ ///J 9'
'~~ ~
(~i ~ ~ l
'
" 1~~
~
I
L r ~ f I. / ' G~ `SI ~I 1 ~~ 4
~
'
~
>~~ y
~ ~4 ^ q~ ~
i
.-.ice '~ %
I. ~
~
' - -
i ~
tj
M
/ 4y4 ! .~Y
~ f4
I~
' '
35°44?
'~ r' 9 1 ~.~
~ 1 u,' _ ii
tiff r
~ ~-`( ~ ~ \~g
~
=
~, ~ i ~ H 1
~
r ~~~ _ o r _ ~ i
,
rJ
J"
St3
\~ r
/
Ix ~/
J ~
x ~
~- ,f
, ~~
- I
x ~ `( 1 c~ ~ ~ r . _
/ " 1
n
P \
!-0 Tt~wtjvads t.;opyrig6t S IYYV lleLormt Yarnwnm, ~i>; wuvb Joarce Uats-: UJ(GJ ~----j1000 ft Sealr. 1:'x,000 DetslL• 13-0 Datum: R'GSS!
- ---
-- --------
---T----- --~------,
~~
~~
~---.
~o
of i i i
Xih i i i
i0 i i i
W i g i i i
i i i i
i i i i
d- ice. ~. i _, i ._
~ i i i
~ ~
-} ==r=====__=~===r_====
/~
-- Q~
Q
k
Moore Co. SR --y I
a ~ -ag" x g3''x gyp'
~I'~ r~, p~orp,rv 5'. I ~' f e r,c 2s
C\ ~~51}-°11e,~} aS necQ.SSory.
i
-^ _
i ~ ~ ~_ _ ' i ~1 `
O _ _
~~ _
~ _y l
~ ,a$'' ~ ~ ~ g"
~ I a
i XB3 x83„
~ '
i
-~ i
N
W ~E
5
i -_--~
1 .J ,~ V .- _ V' ~
l~ ~ r.
+ i
i
~ - _- - ~ _
- '- -
\~ n
;~i
Q
~ ~ v _ ~I
_ _ ~ ;
,,
~ ,i
r- ~- '~
~ ` `l - - ~
^
~ ~ n _
i
I
"! -
sR l,yJ
1-
- - I
~er^-Parar~ S.tt~enceS
Z~Sj0.11l~ 0.S f,eC.e5sQr~,F.
- __-- ~OOrE, Co, 5R lly( ~ ____-
- - -- a ~ ~a8 "x 83"x ~~~
U-[' ~n}o ~ raver,: ~~ C reeK
PRELA,sS ~or~tRE-TE
r
SAKRI~.R p,A1L- o~ \~~ ~
i
~ ~ ~ ~. T L ~`1 G ` ~'`
5 T £ ~- L.
,,
-- ~
~
,,
~~ ~~
,
;,
. ~
i i a8 ,~ ~ ~ ~ a$ "
~- ~ ~$3" ~ X$3"
O
~
~ '
~--~ ; ~
'
SILT HAG ~ ~ _ _ ' ~ _ _ ,
~
T
-
,,
I--- i
---
P ~~
i
PREC AS's Co N cR~?E ' ;" i
B,ogRiER Rp~1~. oil
ST EEL s N~.~T i N v I ~°~a~
~ ~
~ R l P 4~AP
FNE~~y ~iSS~PAT~P.
I '
P~-on ~ l
~r1PERV~ouS
~ASRIC
}~1 QT_ _
1. ~Y Pv.~,P1riG WA ~R .yRo~ntp W~R~L ARE.R..,AM 1'rLo~,.~
~ ~~1~P Ct~NTA;N~D AREA T~J SIi.? BAG.
3. iN~TA~L_ o1PFS ANO Es~:CK~1Lt
9. RtMOvE TEMPORARY O~v~RS10N OE~iCES.
_. YYlaorg GO. sR ~~~~ _-__
a ~ ~~$„ x 83" x So' z
uT ;n'ro ~~own;nc~ Cree.K
~_
R
Q E C P,S"r C o N c RE-~ E~ ~~{ '~~,~
i<
C3 ARR~ ~ R RAtt~ a(` ~,~~ ~ ~ V ~ ~~,.
S?EEL SHEE.TINU ~ ~ ~ ~'
ii
~~ ~ I i : i
~ ~~I L
~ ~ _ - I a I II 1
/ /' ~ I,
~ I I
FR~CASS
BARRtER
`~'~~EL
} ~ uB3" X83" I'.
4 '~ I ~ ~;
~ i~
~i
i ~ ~I
~~ ; ~
I I ~I
j ~i ~ I~
,~~ ~~~
i~
~,' t ,i
- -- --- ~i! 'i
I ~ ( i .~
I ,
! .~
I ~I
it ~
,~
eoNCR~TE~' I
RAtt, oR
SH~.~.TcNCa
(~~ i p n ~+" oC
~"ernpflra~~
17;~1Qt S~ ~~n p~p2
A N'D ~ 04~
rr-cbc ; t L ~ n ~ sj.
Ck,onne.~
~nl`I~~A.~L i~~{~--~_^'~ G'VE~T Si,~~A~,; r~ C`;d I I
T..r'J CIV= ,~~Cti ,~I =~ ANJ ~.A~=;~., LINE] C~.=,'~~ti~_~.
~,~
'~a,~
.. ~ ... -
fvl~~ ~ "r.~=
a~ ta$''x$3„ x~D~
UT i/\ o 'D~'OWf-in9 Cfee,K
ST~-~~U D!Vr RS!ON
Q
w
a
a
w
a
Q
w
z
O
0
Q
w
z
0
0