Loading...
HomeMy WebLinkAboutNCS000581_Review of Permit History_20140428Roxboro Plant. NC0003425, selected file contents summary table 4/24/2014 BG Discharge to Hyco Lake (Class WS-V, B) Date and action Stormwater-only Wastewater Comments April 29, 1994, None EPA Form 2C . NPDES Discharge Permit NC0003425 renewed. permit renewal #002 - #003 . Includes Part III. K. "Best Management Practices Plan" #005 - #006 that mandates a Plan to control discharge of oils and #008 - #009 hazardous/toxic substances (Spill Prevention, etc.) • Minor correction to sample type for #003 issued in July. January 26 1998, None Application noted but not present in . NPDES Discharge Permit issued. permit renewal permit file. . Permit notes stormwater runoff drains to outfall #003 #002 (ash pond treatment system, goes (canal). to canal/#003), internal . BMP Plan Requirement carried over from previous #003 (heated water discharge canal to permit. Hyco Lake) #005 (Unit 4 cooling tower blowdown, goes to ash pond), internal #006 (coal pile runoff) #008 (Domestic WWTP, goes to ash pond), internal #009 omitted internal October 31, 2001 None EPA Forms 1 and 2C noted but not . CP&L submitted permit renewal application. present in permit file. . Supplemental application notes stormwater runoff drains into discharge canal (wastewater stream, #003) and to ash pond treatment system (internal #002, also to canal). December 31, 2002, None See above. • NPDES Discharge Permit issued. permit renewal . BMP Plan Requirement carried over from previous permit. • Minor topographic errors corrected in January 2003 minor modification. September 16, 2004 N/A N/A • (Now) Progress Energy Carolinas submitted 2003 Environmental Monitoring Report on Hyco Reservoir. • DWQ acknowledged receipt and review on 10/22/2004. August 10, 2005, None Application noted but not present in . Renewal application/modification request submitted permit permit file. Revised attachments are March 30, 2005. modification/renewal included. • Supplemental application notes stormwater runoff See above. drains into discharge canal (wastewater stream, #003) #009 (chemical cleaning wastes), and to ash pond treatment system (internal #002, also internal, back in permit to canal). #010 (FGD waste, goes to ash pond and . FGD blowdown stream (internal outfall) added. then to canal) added, internal . BMP Plan Requirement carried from previous permit. August 15, 2005 None N/A DWQ acknowledged receipt and review of Environmental Monitoring Report on Hyco Reservoir. July 5, 2006 None #010 (FGD waste), internal DWQ issued ATC for FGD wastewater treatment system October 2, 2006 EPA Form 2F noted but not EPA Forms 1 and 2C noted but not . Progress Energy applied for NPDES permit renewal. present in permit file. present in permit file. . 2F Attachment 10 noted that data for stormwater Supplemental Information Supplemental Information discharge was provided from a similar discharge, SW -A #002 - #010, see above. outfall 005 at the Mayo Steam Electric Plant SW-B (NC0038377). Also stated samples would be collected from SW -A and submitted when available. April 9, 2007, None #002 - #010, see above. . NPDES Discharge Permit issued. permit renewal . Neither the Fact Sheet nor final issuance letter has any information about a separate NPDES stormwater permit. [Copy of draft permit cover letter not in file]. • BMP Plan Requirement carried from previous permit. June 10, 2009, None #002 Permit modification issued to include reverse osmosis permit modification RO discharge from FGD waste treatments stem. May 15 - June 15, 2009 None #010 • ATCs issue for FGD waste West and East settling ponds, respectively. • Other ATCs followed for more FGD waste treatment system modifications in 2010. September 27, 2011 EPA Form 2F EPA Form 1 and 2C . Progress Energy submitted NPDES permit renewal SW -A (drains North Loop of Supplemental information application. *Note this application date followed Plant, enclosed by rail line) #003 (Discharge Canal to Lake) modifications to other Progress Energy Plants where SW-B (Plant Area northwest of #006 (Coal Pile runoff to Lake) stormwater discharge requirements were incorporated plant - outfall re-routed to coal into the wastewater permit (circa 2009-10). The pile runoff pond sometime company was aware of the Division's direction on these before March 2014 site permits. inspection.) Application does not include SDO observed near laydown yard and Unit 4 Cooling Tower during March 2014 site inspection. December 12, 2012 . RRO Compliance Inspection report notes "The facility currently has no stormwater requirements in the current permit, nor does the facility have a separate individual stormwater permit. Steam Electric Power Plants with process stormwater are required to obtain stormwater coverage as applicable. The application for renewal of the permit was received in September 2011 and includes the addition of stormwater outfall s ." Roxboro Plant summaOL a) In the 2006 permit renewal application Duke alerted DWQ NPDES that there were 2 stormwater flows leaving the site. Neither appear to be commingled with WW or in wastewater conveyances, and one has since been re-routed to wastewater treatment/eliminated as a SDO. This or previous applications did not include the SDO identified near Warehouse B/Laydown yard identified during the RRO inspection in March 2014. b) The most recent version of NC0003425 (2017) does not authorize stormwater discharges except as may be commingled w/wastewater and discharged via outfalls #003 (canal) and #006 (coal pile runoff pond).