Loading...
HomeMy WebLinkAbout20170920 Ver 1_RequesttoAmendMP_20190603June 3, 2019 NC IRT C/O Ms. Lindsay Crocker NC DEQ— Division of Mitigation Services 1652 Mail Service Center Raleigh, North Carolina 27699-1652 Subject: Formal Request to Modify Heron Mitigation Site Assets USACE Action ID No. SAW -2017-01471 DWR No. 17-0290 RFP No. 16-006990 Mitigation Plan Assets -5,264 SMU Amended Mitigation Plan Assets -5,293 SMU Construction changes during As -Built provided an additional 29 SMUs from Mitigation Plan. Deviations from the construction plans included realignment of UT 113 (adding 20 linear feet to the alignment) due to conflicts with a gas line crossing. The realignment resulted in the reduction of a log vane and alterations to pipe configurations within the crossing. Gas line realignment also affected the length of UT 2 in its lower reaches (shortening the Restoration reach). UT 2 also has minor deviations in the enhancement II reach due to profile elevation alterations to tie to the invert of UT 1B. These profile alterations were included in construction plans, but not included in table updates of the detailed plan. Profile alterations resulted in the Enhancement (level II)/Restoration initiation point migrating upstream, and thus the length of the Enhancement (Level II) reach (UT 2A) decreased by 39 feet, and the length of the restoration reach (UT 213) increased by 17 feet. Minor easement deviations after construction plan development resulted in some stationing changes, most notable at the upper reaches of UT 1A (adding 5 linear feet to the alignment) and UT 8A & UTBB (reducing the alignments by a total of linear feet). The easement variations also affected channel lengths across gas lines, which do not generate mitigation credit. Eight log cross -vanes were not constructed due to contact with bed rock, or conflicts with the gas line. In addition, a marsh treatment area was added to the right bank of UT 6 at a draw that was concentrating surface drainage and scouring the valley walls. No other deviations of significance occurred between construction plans and the as -built condition. In addition, no issues have arisen since construction occurred. Revised Asset Table is attached. Thank you, Worth Creech 1101 Haynes St., Suite 211 • Raleigh, NC 27604 • www.restorationsystems.com • Ph 919.755.9490 • Fx 919.755.9492 Table 1. Project Components and Mitigation Credits Heron Restoration Site Asbuilt Baseline Monitoring Report (Project No. 100014) Heron Stream and Wetland Restoration Site Alamance County, North Carolina page 2 Restoration Systems, LLC May 2019 MitigationRestoration Stream Existing Restoration or Reach Plan Mitigation Mitigation Stationing/ Footage FootageRestoration Restoration Level Comment ID Footage/ Ratio Credits Wetland Type Acreage Acreage/ Equivalent Acreage UT IA (-)0+05 to 04+70 475 470 475 Enhancement (Level I) 475 1.5:1 317 57 if of UTI is located outside 856-57= of the conservation easement UT 1B 04+70 to 13+26 753 836 856 Restoration 799 1:1 799 and therefore is not generating credit UT 2A 00+00 to 03+04 304 343 304 Enhancement Level 11 304 2.5:1 122 UT 2B 03+04 to 03+67 19 46 63 Restoration 63 1:1 63 UT 3 00+00 to 02+79 269 279 279 Restoration 279 1:1 279 UT 4 00+00 to 04+50 485 450 450 Restoration 450 1:1 450 52 if of UT5 is located outside 952-52= of the conservation easement UT 5A 00+00 to 09+52 422 952 952 Restoration 900 1:1 900 and therefore is not generating credit UT 513 09+52 to 14+90 538 538 538 Enhancement Level II 538 2.5:1 215 UT 6 00+00 to 07+81 683 781 781 Restoration 781 1:1 781 41 if of the UT7 restoration reach is located outside of the UT 7A 00+00 to 02+32 0 232 232 Restoration 232-41= 1:1 191 conservation easement and 191 therefore is not generating credit 55 if of the UT7 enhancement reach is located outside of the UT 713 02+32 to 09+96 764 764 764 Enhancement (Level 1) 764-55= 1.5:1 473 conservation easement and 709 therefore is not generating credit UT8A 00+04 to 06+09 549 607 605 Restoration 605 1:1 605 UT 8B 06+09 to 08+57 248 250 248 Enhancement Level II 248 2.5:1 99 Wetland Riparian -- 0.35 0.35 Restoration 0.35 1:1 0.35 Wetland Restoration R Riverine Wetland Riparian E Riverine 0.61 0.61 0.61 Enhancement 0.61 2:1 0.31 Wetland Enhancement Asbuilt Baseline Monitoring Report (Project No. 100014) Heron Stream and Wetland Restoration Site Alamance County, North Carolina page 2 Restoration Systems, LLC May 2019