Loading...
HomeMy WebLinkAbout20040110 Ver 1_COMPLETE FILE_20040129U WATER Q W.G -{ Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E. Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality March 16, 2004 Rex Hospital, Inc. Attn: Ms. Laura MacFadden (Vice President Operations) 4420 Lake Boone Trail Raleigh, NC 27607 DWQ # 04-0110 Wake County Page 1 of 2 Subject Property: Rex Hospital, Medical Office Building, Parking Deck & Stormwater Pond, Raleigh, NC UT to House Creek [03-04-02, 27-33-13, C NSW (nutrient sensitive)] APPROVAL of Neuse River Riparian Buffer Protection Rules [15A NCAC 2B.0233] AUTHORIZATION CERTIFICATE & MINOR VARIANCE Dear Ms. MacFadden: You have our approval, in accordance with the conditions listed below, to impact approximately 8,276 square feet (ft2 ) of protected buffers to construct the proposed access roads, retaining walls, parking deck and reconfiguration of the existing stormwater pond at the subject property as described within your application and variance request dated January 29, 2004 including additional information received by the Division of Water Quality (DWQ) on February 24, 2004 and March 15, 2004. This letter shall act as your approved Authorization Certificate as per 15A NCAC 02B .0233(8} and your Mirl Variance approval as described within 15A NCAC 2B.0233(9)(b). In addition to this approval, you shputd,obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your.project-inciuding: (but not limited to) Erosion and Sediment Control regulations. This Authorization Certificate and Minot Variance. approval shall expire five (5) years from the date of this letter. This approval is only valid for, the purpose and design that you described in your applications. If you change.-your project, . you must notify us and you may be required to send us a new application. If the property is sold, the new owner(s) must be given a copy of this variance approval and is thereby responsible for complying with all conditions.. For this approval to be valid, you must follow any conditions listed below. Conditions: Buffer Mitigation (EEP) You are required to mitigate for impacts to the protected riparian buffers. The required area of mitigation to compensate for impacts to the protected riparian buffers is 17,304 square feet as required under this variance approval and 15A NCAC 2B .0242. We understand that you wish to make a payment into the Riparian Buffer Restoration Fund administered by the NO. Ecological Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. In accordance with 15A NCAC 2B .0242, this contribution will satisfy our compensatory mitigation requirements under 15A NCAC 2B .0233(9)(C). Until the EEP receives and clears your check (made payable to: DENR -Ecological Enhancement Program Office), no impacts specified in this variance approval shall occur. Mr. Ron Ferrell should be contacted at (919) 733-5208 if you have any questions concerning payment into the EEP. For accounting purposes, this variance approval authorizes payment into the Riparian Buffer Restoration Fund to compensate for 1.7,304 ft2 of required riparian buffer mitigation for impacts to 8,276 ft2 of protected riparian buffers; 03-04-02, 27-43-(1) river and subbasin." 2. Stormwater Management -The reconfigured stormwater wet detention pond shall be designed according to the most recent version of the NC DENR Stormwater Best Management Practices Manual. This facility must be designed to treat the runoff from the entire project and entire area draining to it, unless otherwise explicitly approved by the Division of Water Quality. Also, before the proposed medical office building is occupied at the subject site, the North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) n+n - 470. /,..+...--% non Inn con4 /;__% - ?+_+e .... Rex Hospital, Inc. Page 2 of 2 March 16, 2004 stormwater pond shall be constructed and operational. The stormwater pond must be maintained in perpetuity. No changes to the stormwater pond shall be made without written authorization from the Divisions of Water Quality. 3. Certificate of Completion - Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to returns the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 1 Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 1508. This Authorization Certificate shall expire five (5) years from the date of this letter. i Requests for appeals of the Minor Variance decision shall be made to the Office of Administrative Hearings. If you do not accept any of the conditions of this approval, you may ask for and adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699- 6714. This approval and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the "No Practical Alternatives" determination and Minor Variance ? pproval under 15A NCAC 2B .0233. If you have any questions or would like a copy of the buffer rules, please call (919) 733-1786. Please note that DWQ has been notified that the storm water pond and channel proposed to be impacted by this project have been determined by the U.S. Army Corps of Engineers not to be jurisdictional waters or wetlands protected under Section 404 of the Federal Water Pollution Control Act (Clean Water Act) and as such do not require a 401 Water Quality Certification from the DWQ. Sincerely, cc: Harlan Britt, Kimley-Horn & Associates, Inc., F Steve Mitchell, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File copy Central Files DW O040110 March 16, 2004 bz F W AT? Michael F. Easley, Governor O R Q O William G. Ross Jr., Secretary , y North Carolina Department of Environment and Natural Resources _ r > Alan W. Klimek, P. E. Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality NORTH CAROLINA DIVISION OF WATER QUALITY AUTHORIZATION CERTIFICATE & MINOR VARIANCE APPROVAL SUMMARY OF PERMITTED IMPACTS AND MITIGATION REQUIREMENTS In accordance with 15A NCAC 2B.0233, Rex Hospital, Inc. has permission as outlined below to impact protected riparian buffers for the purpose(s) of constructing the proposed medical office building, parking deck and reconfigured stormwater pond. All activities associated with these authorized impacts must be conducted with the conditions listed in the attached approval letter. THIS AUTHORIZATION CERTIFICATE & MINOR VARINANCE APPROVAL ARE NOT VALID WITHOUT THE ATTACHMENTS. COMPENSATORY MITIGATION REQUIREMENT ECOLOGICAL ENHANCEMENT PROGRAM (EEP) DWQ Project No.: 04-0110 Date: March 16, 2004 LOCATION: Raleigh COUNTY: Wake BASIN/SUBBASIN: 03-04-02 (river/subbasin); 27-33-13 (stream index no.) As required by 15A NCAC 2B .0233, you are required to compensate for the above impacts through the restoration, creation, enhancement or preservation of wetlands, surface waters and/or buffers as outlined below prior to conducting any activities that impact or degrade the waters of the state. [Note: Acreage requirements proposed to be mitigated through the EEP must be rounded up to one-quarter acre increments according to 15A NCAC 211 .0503(b).] - 0 acres of Class WL wetlands 0 acres of riparian wetland 0 acres of non-riparian wetland 0 feet of stream channel 17,304 square feet of stream buffers One of the options you have available to satisfy the compensatory mitigation requirements is through the payment of a fee to the Riparian Buffer Restoration Fund per 15A NCAC 2B .0242. If you choose this option, please sign this form and mail it to the EEP at the address listed below. An invoice for the appropriate amount of payment will be sent to you upon receipt of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU HAVE RECEIVED NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE EEP. Signature ECOLOGICAL ENHANCEMENT PROGRAM (EEP) NC DIVISION OF WATER QUALITY 1619 Mail Service Center Raleigh, NC 27699-1619 (919) 733-5208 Date North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 01 Q_7AA_17RL: /nhnnnl Qi Q_7AA_AAQA /fnvl httn•//h9n cnr states nn us/nrrwntinnHs/ Zct.? A - a Q a t Sae W b 1 3(crao I AX q jw ? l i Laura, t4cr-C-cLAAe-.,, Lf `-1 ad C,u.?evu,? eT? 9,L?? , 0L a ? f ?? ?j ?,c 33 Oros N150t- 1 J f'?. T53?-3OGS Z 'd SGNU-113M-0MG:3WUN 26892€Z6T6:-131 8b:2Z NOW t7OO2-SS-ddW ©'" Klmley-Hom M and Assodates, Inc, Fax Transmittal To: B 6 !2 Fax No.: Firm/Location: Job No,: From: Job Name: Original coming by mail: Yes ? No ? If you have any probleins, please call 919-677-2000 And ask for: Total number cf pages; including cover sheet: P.O. Box 33068 R04&IL North Carofi= Z77630-3068 TEL 919 677 2400 FAX 919 677 2050 7-3-3- ('C?Y93 Comments. This facsimile is intended far the addressee named herein and may contain btformatiaa that is confidential- If You are not the intended recl?ient or the employee or agent responsible for delivery to the addressee, you are hereby rtotifted that any review, dissemination, disclosum or copying of this communication is strictly prohibited if you have received this facsimile ht error, please inmodiately notify us by telephone, and return the orighwi facsimile to us at the address above via the U.S. Postal Service. Thank you. Z00/T40'd`?$$T# ANS OSOZLL96T6 Z0:9T 6C0Z,91'dVX Z d SGNd-113M-7MG:3WUN 268922Z6Z6:-131 Bb:2Z NOW b002-ST-6UW VapW U.S. ARMY CORPS OF ENGINEERS Wilmington District Action ID: 2.QO420388 County: Wake NO DEPARTMENT OF THE ARMY AtrMORIZATION REQUIRED Property Owner -R-e--Y, tal, Inc Attn.: Laura Macl~ adden Address 4420 Lake Boone Trail Raleigh- NC 27636 Telephone Number 91 -784-7264 Authorized Agent Kimle -Hd and Associates Inc. Attn: Harian_Britt Address P d Bax 33068 ei NC 27636 Telephone Number 919-677-22 9 Size and Location of Property waterbed Highway name/number town ate.: The site is approximately 50 acres in size and located in the northeast quadrant of the intersection of bake Boone Trail and Blue Ridge Road (SR 1664) in I,taleigb, Wake County, North Carolina Description of AetiThe activity consists of construction of a medical office building, expansion of an existing packing deck, and reconfiguration of an existing stormwater pond. Your work as proposed does not require Department of the Army anthorizadon for the following reason(s): There are no jurisdictional waters or wetlands within the boundarles of the property. The proposed project does not impact jurisdictional waters or wetlands. The proposed project is exempt from Department of the Army regulation. (Specify) This Department of the Array determination does not relieve the permittee of the responsibility to obtain any other required Federal; State, or local approvals/permits. The permittee may need to contact appropriate State and local ;agencies before beginning work. Any changes in the above described work must be coordinated with the Corps of Engineers prior to commencement. If you have any questions regarding the Corps of Engineers regulatory program, please contact Jennifer A..1 urdette at telephone number 919 876 - 8441 extepsion 22 Regulatory Project Manager Date arch 9 2004 Expiration Date March 2006 SMVEY PLATS, FIELDSKETCI?, To Tf g YELLO (MLE) copy ? Tliil FS ORM, IF REQUI1itED UR,AV CAII.AE E BE ATTACHED Z001Z00'd 9DBT# ANA 090ZLL96T6 Z0--5T DC077797 7K P I FEE, 24. 2('04 8:25AM KIMLEY HORN Kimley-Horn ?? and Associates. inc. Fax Transmittal February 24, 2004 To: Bob Zarzecki Firm/Location: From.: Tim Grady Fax No.: 733-6893 Job No.: Job NNan1e: Rex Hospital Original coming by mail? Yes ? No ? If you have any problems, please call 919-677-2000 and ask- for.: Sherrie Wild(,-j' Total number of pages, including cover sheet: 7 Comments: Bob, please find attached response to your letter. cc: Bob Field -784-3407 Tom Tuff - 233-9905 Rvn Hendricks - 545-7703 Laura N1acFadden - 734-3004 This facsimile is intended for the addressee rramed herein. and nirty contain tnrornwnon that is conJutcnual. If you are nor the ir:tended recipient or the employee or agent responsible,fbr delivery, to the addressee, you are hereby noty0ed that airy revie• , dissemination, disclosure, or copying of this conimunictation is strictly prohibited. If you have received this facsimile in error, please irnnzediately notify its by telephone, and return the original facsirrri?'e to us at die addrees above via eft U.S. Postal Service. Thank you, FEE-E4-2004 TUE 08:15 TEL: 91973ZG893 HAME: Dt• Q-4]ETLA[%1DS P.0, Box 3906n Ratei"lu, t\:brttz caroliaa 27o36-SpGq- TEL 919 677 2000 FAIN 9196>77 :150 P. 1 FEB, 24. 2004 8:25AM KIMLEY HORN CM11 Kimley-Narn and Associates, Inc. 2 Access Drives (Relative to the New Parking Deck) The proposed access drives and associated grades are tied to the grade, of the existing drives, buildings and parking deck. A change in grades to aceoxnnlodate any single element or conflict effects multiple other areas of critical connection. For example, the existing hospital finish floor elevation wets the grade for the Medical Office Building (MOB), which in turn sets the grades for &iveway connections and connection to the new parking deck. Also, the existing roadway network and parking garage add additional critical connection points that cannot be changed. The following are responses to the proposed alternatives for the "loop road'', as suggested in your letter: "(1) Connection of the proposed parking deck to the existing parking south of thy. proposed stornnvater pond ". Connection from the proposed parking deep to the existing parking lot sough of the proposed stormwater pond would create a ramp gradient that is in excess of acceptable design standards (20%+/-). Grades of neither the proposed parking deck nor the existing parking lot can be changed to allow for a more acceptable gradient. Additionally, pedestrian and motorist safety would be compromised because of the pedestrian/ vehicular conflict created from taking significant traffic flow through an existing parking lot not designed for such volume of traffic as the parking garage would generate at peak flows. "(2) Ara ingrewl egress single entrance from the medical 2lfice building to the proposed parking deck. The driveway connecting the MOB to the new parking deck serves the first floor of the MOB, elevation 415. This driveway accesses the second level of the parking deck at elevation 414 and serves the dual function of a drop off zone and one way entrance into the parking deck. The first and lowest level of the parking deck at elevation 402, exits via a new parking deck entrance/ exit road that impacts the buffer. The exit function that this road provides is a critica'' design element that contributes to pedestrian and vehicular safety, and in eliminating a. dead-end condition where the deep would terminate at the end of a lower level without any edit, "(3) A loop drive from the medical office building through the proposed parking deck, and connection to the existing parking deck south of the proposed storinwater pond" See response under (1) above, FEL-24-200 4 TI IE 08:15 TEL:9197336893 1 AME: DWG!-WETLAI IUS P. FEB. 24. 2(104 S' 26AM KIMLEY HORN N 0, 3 C]= Kimsey-Horn and Assodates, Inc. "(4) Some combination of the alternatives above. When considering a eorr?bi;nation of, or alternatives to the options aboti ce the connectivity to existing grades on all sides of the proposed development prove restrictive. When considering the restrictions safety, elevations, and siting conditions! no combination of the above alternatives is practicable. 3. Retaining Walls The entire 50' buffer along the south side of the proposed pond is retained e?.cept for the two modular retaining walls with 10" wide cap units exposed at surface.. To reduce the construction to only one wall would require demolition of a significant portion of the existing parking lot. This is due to depth of excavation to footer and the extended grid lengths of the tie back's required if one tall wall were implemented. In other words, siting of a single retaining wall outside of Zone 1 would require the dernolition of a portion of the existing parking lot. 4. Buffer Around Storrnwater Pond We understand that buffer mitigation for impacts will be required based on the existing plan under your review. We are confident that we have thoroughly examined equitable options to avoid buffer impacts; and that none exists. In summary, we want to bring to your attention the fact that an extrel-rely efficient use of parking design has been applied - a high density, vertically structured parking deck - minimizing impacts to the buffer. This alone has a significant environmental value when compared to the same parking applied in a traditional surface application. Additionally, the proposed pond has a larger surface area than the existing or previously proposed pond in order to meet NC ]DENtt storm water pond criteria. The proposed pond is appropriately designed to treat the entire area draining to it. This includes approximately eighteen acres of existing areas. We believe that the request for this minor variance is in keeping with NCAC 2B .0233 (9) (a) in that there are practical difficulties or unnecessary hardships that prevent compliance with the strict letier of the riparian buf#er prot'cetion requirements. Further, the request for the variance is in harmony with the,, general purpose and intent of the State's riparian buffer protection requirements and preserves its spirit and in granting the variance, the public safety and welfare will be assured, water quality will be protected and substantial justice will be done. FEB-24-2004 TUE 08:15 TEL: 9197336&93 HAME: DWG!-WETLAI-IDS F'. :. FEB, 24. 2o,04 8:26AM KIMLEY HORN CJM?I Kimsey-Horn M . and Associates, Inc. Please be reminded that Rex's new primary contact is Laura McFadden 4 Please re'v'iew this response and if there are any additional questions or eon neots, it would be greatly appreciated if you would give us a call to avoid additional time situations. Your attention to this project is appreciated, and we look forward to bringing this matter to a successfiil conclusion in the near futuTe. Very truly yours, I MILEY-HORN AND :ASSOCIATES, ANC.. - I ?a-' - I;% Harlan K. Britt, P.B_ Senior Project Management Attachme-ats : DWQ Feb. 17'x' Letter cc: Laura MacFadden - Rex Hospital Bob Field - Rex Hospital Tim Grady, RL A. - Kimley-Horn H'1PN\0112740111documentslcoorespon,danceVohn Dorney Response. fi ldoc.doc k ''C' - FEB-24-2004 TUE 08:15 TEL:9197336893 NAME:DWO-WETLAHUS P. 4 FEB. 24. 2004 :26AM KIMLEY HORN William Q. Rau Jr., Swratary ( North Carolina Department of Environment and Natural Rosauicas Alan W, ttiirnek, I'. E, Dimctar > y Division V. Waxor Duril?ty Weer; t-l. 5ulfins, Deputy Diremlor Di%ri?,ion of Water Quality February 17, 2004 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Rex Hospital Inc. Attn: Mr. AI Stewart 4420 Lake Boone Trail Raleigh, NG 27602 DWQ Project No. 04-0110 (see also 03-1192) Wake County Page 1 of 2. Subject Property: Rex Hospital, Medical Office Building, Parking Dock & Stormwaltcr Pond, Raleigh, NC UT to House Greek 103-04-02, 27-33-13, C NSW (nutrient sensitive)) REQUEST FOR MORE INFORMATION Dear Mr, Stewart: On January 29, 2004, the Division of Water Quality (DWO) reoeived your. appllcation dated January 29, 9004 to impact 8,276 square feet (if) (or 0.18 acres) of protected riparian buffers to construct the proposed medical office building, parking deck and Stormwater pond expansion. The DWQ has determined that your application was incomplete and/or provided inaucurate information as discussed below. The DVVQ will require additional information in order to process your application io impact protected wetland, streams and/or butters on the subject property. Therefore, unless we receive Me additional information requested below, we will have to move toward deniai of your appiication as required by 15A NCAC 2H .0506 and 25.0233(8) and will place this project on hold as incvmpleie'until we receive this additional information, Please provide the following information so that we may continue to review your projoct. Additional Information: 1, Parking Deck A gap +3xi5ts between the existing parking deck and the proposed parking deck. It appears that if tliis gap did not exist or if it was decreased in width that the proposed parking deck could be constructed outside of the new buffers associated with the 5tormwater pond expansion. Please reconfigure the parking deck to avoid tho buffer impaots or provide additional justification as to why this is not practicable. 2. Access Drives You stated in your application that the "parking garage requires two points of ingresslegress The proposed plans have a loop road between the parking deck and the medical office building as well as two connections to the existing parkinrq deck, The loop road will impact both Zone 1 and 2 of the new stormwater pond expansion. It appears that alternatives . to the loop road exist that would avoid the need for the buffer impacts, These alternatives may include; (1) connection of the proposed parking deck to the existing parking loft south of the stormwater pond: (2) an ingress/egress singly entrance.frdm the medical office building to the proposed parking deck; (3) a loop drive from the medical offico building through the proposed parking dock and connection to the existing parking lot south of the, stormwater pond; (4) some combination of the alternatives above. Please redesign the access drives fie avoid the buffer impacts or provide additional justifications as to why the impacts cannot be avoided- 3. Retalning Walls Nonh Carolina DlMalon of Water Quality, WetandWA01 Unit, 165o mW1 Servioe Canter, Fiaieigh, NC 27688.1850 (Meiling Add=s) 2321 Crab"o Stud., Raleigh, NO 27604.22dO (>_=Van) 919-733-1786 (phone), 879-733-GM (fax), http?At24:E r.3t8ta.nG.G9/ncw?tlandsl FEB-24-2684 TUE 08:13 TEL:9197336593 NAME:DW041ETLHIJDS P. FEB. 24, 2(04 8:26AM KIMLEY HORN rage :1-, Ut Z February 17, 2004 Retaining walls are proposed south of the stormwater pond and north of the existing parking lest. Please provide additional justification as to why these retaining walls are needed. Also, what is proposed between the two retainlnQ wails (e.g., sidewalk, grass, eto,)? 4. Buffet around 5tormwaWr Pond Your site plans depiot only a 30 foot buffer around two thirds of the stormwater pond. The remainder of the area iS proposed to contain retaining walls, sidewalks and access drives. As such, buffer mitigation will bo required for the impacts to the buffers associated with the existing stormwater pond because yo(j havo not proposed'to estal l%sh a riparian buffer that meets the requirements of Items (4) and (5) of the Meuse Buffer Rule around the new stwinvdater pond. If you are able to establish a riparian buffer around the new stormwater pond (possibly by rodeslgning the site as disoussed within Items 1.2 & 3'above), then the activity will be considered an Vlowable" use and will not require buffer M ideation. Please respond within three wftks of the date of this letter by sending this information to me in writing and Stave Mitchell of the DWQ Raleigh Reg lonal Office. If we do not hear from ytx,J within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wotlands, walum or protected buffers. Please be aware that any impacts requested within your application are riot authorized (at this time) by the DW Q. Please call Mr. Bob 7arzecki at 919-733-9726 if you have any questions regarding or would like to set up a rneeting to disouss this matter. Sincersly, cc: Harlan Britt, Kfmley--Horn and Assoclates, W., PO Box 33068, Raleigh, NC 27536-3063 USACL Raleigh Regulatory Field Office DWG! Raleigh Reglonal Office File Copy Central Files ba E/£:d osea L96:01 FEP_,-24-2814 TUE 08:16 TEL:9197336893 DWQ040110 February 17, 2004 26292UGIG SONU-U3M-bMG:W0 dJ =T ^00i:-.0G- hJHl,1E: DW0-I-JETLAHD' P. r, ? ? ? Kimley-Horn and Associates, Inc. February 23, 2004 Mr. John Domey NC DENR/ Division of Water Quality Wetland Unit 1650Mail Service Center Raleigh, NC 27699-1650 Re: Rex Hospital, Medical Office Building, Parking Deck & Stormwater Pond, UT to House Creek 103-04-02,27-33-13, C NSW (nutrient sensitive)) DWQ Project No. 04-0110 and 03-1192 Dear Mr. Dorney: In response to your "REQUEST FOR MORE INFORMATION" letter dated February 17, 2004, Kimley-Horn and Associates, Inc. (KHA), acting as authorized agent on behalf of Rex Hospital, Inc. offers the following response: 1. Parking Deck The gap between the existing parking garage and the proposed parking garage is required for two reasons: First, the existing parking deck does not meet current Americans with Disabilities Act (ADA) height requirement for vans nor the standard building code height clearances. The new parking deck will require van accessible parking and shall meet ADA/building code height requirements. As such, the two parking decks have different floor elevations at most levels. This floor level difference needs to be overcome by a connector ramp. The transition required is approximately 22' +/- to keep the connecting ramps within tolerable slopes to maintain head clearance and ground clearance at the breakovers. Second, the existing parking deck footings must be accommodated and remain undisturbed by construction of the new parking deck. A buffer area is required to stay away from the existing foundations, and not compromise their structural integrity. VVETLA DS t;o 0ii tp . t. _ t-. FEB 2 6 2004 '? ER U U Y SEC : , P.O. Box 33068 Raleigh, North Carolina 27636-3068 ¦ TEL 919 677 2000 FAX 919 677 2050 ? ? ? Kimley-Horn 2 and Associates, Inc. 2. Access Drives (Relative to the New Parking Deck) The proposed access drives and associated grades are tied to the grades of the existing drives, buildings and parking deck. A change in grades to accommodate any single element or conflict effects multiple other areas of critical connection. For example, the existing hospital finish floor elevation sets the grade for the Medical Office Building (MOB), which in turn sets the grades for driveway connections and connection to the new parking deck. Also, the existing roadway network and parking garage add additional critical connection points that cannot be changed. The following are responses to the proposed alternatives for the "loop road", as suggested in your letter: "(1) Connection of the proposed parking deck to the existing parking south of the proposed stormwater pond ". Connection from the proposed parking deck to the existing parking lot south of the proposed stormwater pond would create a ramp gradient that is in excess of acceptable design standards (20%+/-). Grades of neither the proposed parking deck nor the existing parking lot can be changed to allow for a more acceptable gradient. Additionally, pedestrian and motorist safety would be compromised because of the pedestrian/ vehicular conflict created from taking significant traffic flow through an existing parking lot not designed for such volume of traffic as the parking garage would generate at peak flows. "(2) An ingress/ egress single entrance from the medical office building to the proposed parking deck. The driveway connecting the MOB to the new parking deck serves the first floor of the MOB, elevation 415. This driveway accesses the second level of the parking deck at elevation 414 and serves the dual function of a drop off zone and one way entrance into the parking deck. The first and lowest level of the parking deck at elevation 402, exits via a new parking deck entrance/ exit road that impacts the buffer. The exit function that this road provides is a critical design element that contributes to pedestrian and vehicular safety, and in eliminating a dead-end condition where the deck would terminate at the end of a lower level without any exit. "(3) A loop drive from the medical office building through the proposed parking deck, and connection to the existing parking deck south of the proposed stormwater pond " See response under (1) above. ? ? Kimley-Horn and Associates, Inc. 3 "(4) Some combination of the alternatives above. When considering a combination of, or alternatives to the options above, the connectivity to existing grades on all sides of the proposed development prove restrictive. When considering the restrictions safety, elevations, and siting conditions, no combination of the above alternatives is practicable. 3. Retaining Walls The entire 50' buffer along the south side of the proposed pond is retained except for the two modular retaining walls with 10" wide cap units exposed at surface. To reduce the construction to only one wall would require demolition of a significant portion of the existing parking lot. This is due to depth of excavation to footer and the extended grid lengths of the tie-back's required if one tall wall were implemented. In other words, siting of a single retaining wall outside of Zone 1 would require the demolition of a portion of the existing parking lot. 4. Buffer Around Stormwater Pond We understand that buffer mitigation for impacts will be required based on the existing plan under your review. We are confident that we have thoroughly examined equitable options to avoid buffer impacts, and that none exists. In summary, we want to bring to your attention the fact that an extremely efficient use of parking design has been applied - a high density, vertically structured parking deck - minimizing impacts to the buffer. This alone has a significant environmental value when compared to the same parking applied in a traditional surface application. Additionally, the proposed pond has a larger surface area than the existing or previously proposed pond in order to meet NC DENR storm water pond criteria. The proposed pond is appropriately designed to treat the entire area draining to it. This includes approximately eighteen acres of existing areas. We believe that the request for this minor variance is in keeping with NCAC 2B .0233 (9) (a) in that there are practical difficulties or unnecessary hardships that prevent compliance with the strict letter of the riparian buffer protection requirements. Further, the request for the variance is in harmony with the general purpose and intent of the State's riparian buffer protection requirements and preserves its spirit and in granting the variance, the public safety and welfare will be assured, water quality will be protected and substantial justice will be done. ? ? ? Kimley-Horn 4 and Associates, Inc. Please be reminded that Rex's new primary contact is Laura McFadden Please review this response and if there are any additional questions or comments, it would be greatly appreciated if you would give us a call to avoid additional time situations. Your attention to this project is appreciated, and we look forward to bringing this matter to a successful conclusion in the near future. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Harlan K. Britt, P.E. Senior Project Management Attachments : DWQ Feb. 17th Letter cc: Laura MacFadden - Rex Hospital Bob Field - Rex Hospital Tim Grady, RLA - Kimley-Horn HAPN\01 127401 1\documents\coorespondance\John Dorney Response.fnldoc.doc OF WArFR William G. Roaq Jr., Secretary `?? 4(, North Carolina Department of Environment and Natural Resources r Alan W. Klimek, P. E. Director > y Division of Water Quality O < . Coleen H. Sullins, Deputy Director Division of Water Quality February 17, 2004 DWO Project No. 04-0110 (see also 03-1192) Wake County Page 1 of 2 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Rex Hospital Inc. Attn: Mr. AI Stewart 4420 rake Boone Trail Raleigh, NC 27602 Subject Property. Rex Hospital, Medlcal Office Building, Parking Deck & Stormwater Pond, Raleigh, NC UT to House Creek 103-04-02, 27-33-13, C NSW (nutrient sensitive)] REQUEST FOR MORE INFORMATION Dear Mr. Stewart: On January 29, 2004, the Division of Water Quality (DWQ) received your. application dated January 29, 2004 to impact 8,276 square feet Of) (or 0.18 acres) of protected riparian buffers to construct the proposed medical office building, parking deck and stormwater pond expansion. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetland, streams and/or buffers on the subject property. Therefore, unless we receive the additional information requested'below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and 26.0233(8) and will place this project on hold as incomplete-until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information: 1. Parking Deck A gap exists between the existing parking deck and the proposed parking deck. It appears that if this-gap did not exist or if it was decreased in width that the proposed parking deck could be constructed outside of the new buffers associated with the stormwater pond expansion. Please reconfigure the parking deck to avoid the buffer impacts or provide additional justification as to why this is not practicable. 2. Access Drives You stated in your application that the "parking garage requires two points of ingress/Ggrese. The proposed plans have a loop road between the parking deck and the medical office building as well as two connections to the existing parking deck. The loop road will impact both Zone 1 and 2 of the new stormwater pond expansion. It appears that alternatives . to the loop road exist that would avoid the need for the buffer impacts. These alternatives may include; (1) connection of the proposed parking deck to the existing parking lot south of the stormwater pond; (2) an ingress/egress single entrance.from the medical office building to the proposed parking deck; (3) a loop drive from the medical office building through the proposed parking deck and connection to the existing parking lot south of the•stormwater pond; (4) some combination of the alternatives above. Please redesign the access drives to avoid the buffer impacts or provide additional justifications as to why the impacts cannot be.avoided. 3. Retaining Walls North Carolina Division of Water Quality, Wetlands/401 Unit, 1650 Mail Service Center, Raleigh, NC 27699-IW (Malling Address) 2321 Crabtree Blvd., Raleigh, NO 27604-2280 (Location) 919.733-1786 (phone), 919-733-6893 (fax), http//h2o:enr.state.m.us/ncvmtlands/ ??z:d OS02LL96:01 268922L6T6 S0Nb-l13M-0M0:W0NJ 82:2T t,002-02-833 Rex Hospital Page 2 of 2 February 17, 2004 Retaining walls are proposed south of the stormwater pond and north of the existing parking lot. Please provide additional justification as to why these retaining walls are needed. Also, what is proposed between the two retaining walls (e.g., sidewalk, grass, etc.)?. 4. Buffer around Stormwater Pond Your site plans depict only a 30 foot buffer around two thirds of the stormwater pond. The remainder of the area is proposed to contain retaining walls, sidewalks and access drives. As such, buffer mitigation will be required for the impacts to the buffers associated with the existing stormwater pond because you have not proposed"to establish a riparian buffer that meets the requirements of Items (4)-and (5) of the Neuse Buffer Rule around the new stormwater• pond. If you are able to establish a riparian buffer around the new stormwater pond (possibly by redesigning the site as discussed within items 1, 2 & 3'above), then the activity will be considered an "allowable" use and will not require buffer mitigation. Please respond within three weeks of the date of this letter by sending this information to me in writing and Steve Mitchell of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Mr. Bob Zarzecki at 919-733-9726 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, cc: Harlan Britt, IKimley-Hom and Associates, W.,, PO Box 33068, Raleigh, NC 27636-3068 USACE Raleigh Regulatory Field Office DWQ Raleigh Regional Office Fite Copy Central. Files DWO040110 February 17, 2004 bz £i£:d 0902LL96:01 £689££L6S6 SONbrU3M-0Ma:W08J 8£:£S t,002-02-833 T 'd SGHU-1i3M-i?MG:AU1HN 2Ge922'LGTG:191 ?S.eo IJj V002-02-83A Kimley-Horn and Associates, Inc. February 20, 2004 Ms. Jennifer'Burdette USAGE Raleigh Regulatory ;Field Office 6508 Falls of the Neuse Road, Suite 120 Raleigh, NC 27615 Mr. John Dorney DWQ Wetlands 'Unit 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27/604 fie: Rex Hospital Birth Center Medical Office Building and Parking Deck Pond Modification, Wake County DWQ# 040110 Dear Ms. B3 dette and Mr. Dorney: Kimlev-Horn and Associates, Inc. is hereby requesting on behalf of our client, Rex Hospital, that the name of the applicant and contact information be changed to the following: Rex Hospital, Inc. Ms. Laura MacFadden Vice President of Operations Ph: (9 t9) 784-3245 Fax: (919) 677-2050 4420 Lake Boon 'Grail Raleigh, NC 27607 Lan.ra.MEicFadden@rexhealth.com If you have any questions, please feel free to contact me at (919) 653-2950. Very truly your , 40 Todd St. J hn,, PE MMLEY-HORN AND ASSOCIATES, INC. Ca: Debbie Edwards, DW Tim Grady, KHA ¦ TZL 919 677 200k FAX 919 677 209 • Ro, 8ax 330M Uelgh, Noah Carolina 27636.3093 ,;Ci. T 0' -,7 ;LT A1119 090FLL?6T6 0 -:OT ?COZ, OZ-=4 SENDING CONFIRMATION DATE FEB-20-2004 FRI 13:39 NAME DWQ-WETLANDS TEL 9197336893 PHONE : 96772050 PAGES : 3/3 START TIME : FEB-20 13:38 ELAPSED TIME : 00' 33" MODE : ECM RESULTS : OK FIRST PAGE OF RECENT DOCUMENT TRANSMITTED... 17,T, ?povryvr,9a?v.*?:F.ICSm'cR'%QCCi•;?!!I)<(?FP:ti_r?lp'!>Q9VJ?:W, I:-ci i.!)'. S? 'RNTax'1?iWZt :19C: ?nl'?c?w:l'C.?nl .+.x:c4.1:?' 6 ??b9n?nv; n??i'?A:9,S J.\"ISIxR..'?.n:a):'•? ?C rlC?l..u[ y,t? tSnv.-9M1o] ?Ef:iM uM ?(t?n?l n:xlplc ?x.rsi..iQ :)'!; :snoilan.Usm IP,]Jads .to sqoK :;sags ,IaAo.1Slulpn[aur sa2vd;o.ta jlnn H c7G L aIVQ C?tiS .. _._?; itc _.y'.A 1-y :surdllio.7 xF;g U689-FUL-616 :4 YTW V' 98L1-tCL-616 #au073 ;uoq=14lul WnTroo 0591-669C6 ON 'q"?!-),J m-z) a?vaaS VVIN os;91 !-PPV "'uwI4 o,nz;-;xp9LZ JN ``iupml %Z almS'paena[?QV[ aangesD lZFZ -s"'j,pY 1'-.;s 1Ni] tot/spuupalv1 saaxnosag lv.IT4a&; pug imummo-neug Jo;uamuvdaci dageno xale iA Jo uoIsi.uR Anunp n?eM/c vouu?p ? rd-'j OF WATF9p \(} G r , . -.-Y, William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E. Director -1 O ? Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality February 17, 2004 DWO Project No. 04-0110 (see also 03-1192) Wake County Page 1 of 2 CERTIFIED MAIL: RETURN RECEIPT REQUESTED FIL E s" N Rex Hospital Inc. Attn: Mr. Al Stewart 4420 Lake Boone Trail Raleigh, NC 27602 Subject Property: Rex Hospital, Medical Office Building, Parking Deck & Stormwater Pond, Raleigh, NC UT to House Creek [03-04-02, 27-33-13, C NSW (nutrient sensitive)] REQUEST FOR MORE INFORMATION Dear Mr. Stewart: On January 29, 2004, the Division of Water Quality (DWQ) received your application dated January 29, 2004 to impact 8,276 square feet (ft2) (or 0.18 acres) of protected riparian buffers to construct the proposed medical office building, parking deck and stormwater pond expansion. The DWQ has determined that yo r a I ?+as incomplete and/or provided inaccurate information as discussed below. The DWQ will req d on r>tl?n in order to process your application to impact protected wetland, streams and/or buffers on the s eh re ore, unless we receive the additional information requested below, we will have to move toward de al o your application as required by 15A NCAC 2H .0506 and 2B .0233(8) and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information: 1. Parking Deck A gap exists between the existing parking deck and the proposed parking deck. It appears that if this gap did not exist or if it was decreased in width that the proposed parking deck could be constructed outside of the new buffers associated with the stormwater pond expansion. Please reconfigure the parking deck to avoid the buffer impacts or provide additional justification as to why this is not practicable. 2. Access Drives You stated in your application that the "parking garage requires two points of ingress/egress". The proposed plans have a loop road between the parking deck and the medical office building as well as two connections to the existing parking deck. The loop road will impact both Zone 1 and 2 of the new stormwater pond expansion. It appears that alternatives to the loop road exist that would avoid the need for the buffer impacts. These alternatives may include; (1) connection of the proposed parking deck to the existing parking lot south of the stormwater pond; (2) an ingress/egress single entrance from the medical office building to the proposed parking deck; (3) a loop drive from the medical office building through the proposed parking deck and connection to the existing parking lot south of the stormwater pond; (4) some combination of the alternatives above. Please redesign the access drives to avoid the buffer impacts or provide additional justifications as to why the impacts cannot be avoided. 3. Retaining Walls North Carolina Division of Water Quality, Wetlands/401 Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), hftp://h2o.enr.state.nc.us/ncwetlands/ Rex Hospital Page 2 of 2 February 17, 2004 Retaining walls are proposed south of the stormwater pond and north of the existing parking lot. Please provide additional justification as to why these retaining walls are needed. Also, what is proposed between the two retaining walls (e.g., sidewalk, grass, etc.)? 4. Buffer around Stormwater Pond Your site plans depict only a 30 foot buffer around two thirds of the stormwater pond. The remainder of the area is proposed to contain retaining walls, sidewalks and access drives. As such, buffer mitigation will be required for the impacts to the buffers associated with the existing stormwater pond because you have not proposed to establish a riparian buffer that meets the requirements of Items (4) and (5) of the Neuse Buffer Rule around the new stormwater pond. If you are able to establish a riparian buffer around the new stormwater pond (possibly by redesigning the site as discussed within Items 1, 2 & 3 above), then the activity will be considered an "allowable" use and will not require buffer mitigation. Please respond within three weeks of the date of this letter by sending this information to me in writing and Steve Mitchell of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Mr. Bob Zarzecki at 919-733-9726 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, ds/401 Un cc: Harlan Britt, Kimley-Horn and Associates, Ilse , PO Box 33068, Raleigh, NC 27636-3068 USACE Raleigh Regulatory Field Office DWQ Raleigh Regional Office File Copy Central Files DWO040110 February 17, 2004 bz Rex Hospital Pag. " pf 2 Februk 17, 2004 Retaining walls are proposed south of the stormwater pond and north of the existing parking lot. Please provide additional justification as to why these retaining walls are needed. Also, what is proposed between the two retaining walls (e.g., sidewalk, grass, etc.)? 4. Buffer around Stormwater Pond Your site plans depict only a 30 foot buffer around two thirds of the stormwater pond. The remainder of the area is proposed to contain retaining walls, sidewalks and access drives. As such, buffer mitigation will be required for the impacts to the buffers associated with the existing stormwater pond because you have not proposed to establish a riparian buffer that meets the requirements of Items (4) and (5) of the Neuse Buffer Rule around the new stormwater pond. If you are able to establish a riparian buffer around the new stormwater pond (possibly by redesigning the site as discussed within Items 1, 2 & 3 above), then the activity will be considered an "allowable" use and will not require buffer mitigation. Please respond within three weeks of the date of this letter by sending this information to me in writing and Steve Mitchell of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts. to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Mr. Bob Zarzecki at 919-733-9726 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, 1 cc: Harlan Britt, Kimley-Horn and Associates, RW,, PO Box 33068, Raleigh, NC 27636-3068 USACE Raleigh Regulatory Field Office DWQ Raleigh Regional Office File Copy Central: Files DWQ040110 February 17, 2004 bz l M Date: Fe b c'-) To: ? ARO ? FRO ? MRO G?] RRO From. D Gl Triage Check List Project Name: DWQ#: O `? ` Off/ O County: W,,Ake- Mike Parker ?' Wa.RO Tom Steffens Ken Averitte ? WiRO Noelle Lutheran Alan Johnson ? WSRO Daryl Lamb Steve Mitchell Tele hone : 919) The file attached is being forwarded to your for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination ? Wetland determination and distance to blue-line surface waters on USFW topo maps h inimization/avoidance issues Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) Pond fill ? Mitigation Ratios ? Ditching ??(' Are the stream and or wetland mitigation sites available and viable? LffIs ICheck,drawings for accuracy the application consistent with pre-application meetings? ? Cumulative impact concern Comments: S-F no-? Wa 1/ neces _<?6r ¦ Complete items 1, 2, and 3 Also Complete' li si it 4 if R t t d D d d i A i atu Agerrt e re em es c e e very is . r X ¦ Print your name and address on the reverse ? Addresse so .that we can return the card to you. B. R ved (Printed Name) C to of D liver ¦ Attach this card to the back of the maiipiece, : ?t oG or on. the front If space permits: D. Is d from item 1 ? es 1. Article, Addressed to. r f ID ?> G `-C - O O - If erne?ery below: ? No on hold. WOSe 2??4 5 R ? l --C IR o p , eu Lt4 ? LCUCe- r600rle TftXi I 3 Service Type i Ceriitled Mail ?'. Express Mail ? Registered Return Receipt for Merchandis C z?l CoO z "ZOI,I e i ? Insured Mail C.O.D. J J 4. Restricted Delivery? (Extra Fee) ? yes 2. Artlcie Number - -- _-- (Hensler fromr?%!ce ?a ?002 2 410 0003 0 2 7 5 4186 ji Fom, 3811, August 2001 Domestic Return Receipt 10269546- , UNITED STATES POSTAL SERVICE First-Gass Mail Rosfage;& USPS ' Fees Ptiid Permit No. G-10 02/27/04 21 M • Sender. Please.print your name, address, and ZIP+4 :in this box • l NC DENR Division of Water Quality Wetlands/401 Certification Unit 2321 Crabtree Boulevard, Suite 250 Raleigh, NC 27604 1 Ifill liIIIid i[liltItill!1t0IIlll}It:Jit}!} ?.}1.1t!}•??'}.!l3itlli ? ? Kimley-Horn Box 33068 Raleigh, North orth Carolina and Associates, inc. 27636-3068 I 110 TEL 919 677 2000 14 FAX 919 677 2050 Transmittal Date: 01/29/04 Job Number: 011274012 Project Name: Rex Healthcare, Inc. To: Mr. John Dorney WCTI All- . NC DENR/Division of Water Quality `TV t uKUUp Wetlands Unit JAN 2 9 9nnn 1650 Mail Service Center 3800 Raleigh, NC 27699-1650 WUAL/TYSECMU We are sending these by U.S. Mail Other: E] FedEx ® Hand Deliver We are sending you F1 Attached Shop Drawings R Under separate cover via the following items: E] Prints/Plans E] Samples F? Specifications E] Change Orders ® Other: PCN Application form These are transmitted as checked below: For your use [:] Approved as submitted Ej Resubmit n Copies for approval As requested E] Approved as noted ® Submit E] Copies for distribution For review and comment E] Returned for corrections Ej Return Ej Corrected prints Remarks: Attached is the PCN Application and supporting documentation. If you have any questions, please call me at (919) 678-4173. Thanks. Norton Copy to: Signed ?Z,4 Page 1 Copie Date No. Description ? ? ? Kimley-Horn and Associates, Inc. January 29, 2004 Mr. John Domey NC DENR/ Division of Water Quality Wetland Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Re: Rex Healthcare, Inc. Nationwide 39 Application Raleigh, Wake County, North Carolina Dear Mr. Domey: WETLANDS 1401 GROUP JAN 2 9 2004 WATER QUALITY SECTION Kinley-Horn and Associates, Inc. acting as authorized agent on the behalf of Rex Healthcare, Inc. is applying for a Nationwide 39 to modify an existing pond located on the Rex Healthcare Campus. Attached is a Nationwide 39 PCN form for proposed impacts to "Waters of the U.S." and Neuse River Buffers. The pond is located on the Rex Healthcare Campus adjacent to the Rex Wellness center in Raleigh, North Carolina. An expanded parking deck and medical office building are proposed on the Rex Healthcare Campus. The existing pond and buffers are proposed to be reconfigured to allow area to expand the existing parking deck and construct the new medical office building. The proposed modifications to the existing pond would impact 0.07 acres of "Waters of the US". Proposed impacts to the buffer are from the entrance/exit to the parking garage, two retaining walls, and the expanded parking deck. Impacts to zone linclude 3,000 ft2 for the entrance/exit (road) and 260 ft2 for a retaining wall. Impacts to zone 2 include 2,445 ft2 for the entrance/exit (road), 745 ft2 for a retaining wall, and 1,826 ft2 for the expanded parking garage. Buffer mitigation of 17,304 ft2 is proposed through payment to the NC Ecological Enhancement Program. Included with the Nationwide 39 application are the stormwater management plans which include the modifications to the existing pond. 2 P.O. Box 33068 Raleigh, North Carolina 27636.3068 ¦ TEL 919 677 2000 FAX 919 677 2050 ? ? ? Kimley-Horn and Associates, Inc. z? oil Thank you for your attention to theses matters. If you have any questions, please call me at (919) 678-4173. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Norton Webster Environmental Scientist Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. (1t any partncuiar item is not appitcame to tors project, please enter Not Appucaoie" or "MA".) I. . Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ® Riparian or Watershed. Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 39 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a, North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Rex Hospital Inc. (Al Stewart) Mailing Address: 4420 Lake Boone Trail Raleigh, NC 27602 Telephone Number: (919) 784-7264 Fax Number: (919) 784-3336 E-mail Address: Al.Stewart@rexhealth.com 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Harlan Britt Company Affiliation: Kimley-Horn and Assiciates, Inc. Mailing Address: PO Box 33068 Raleigh, NC 27636-3068 Telephone Number: (919) 677-2209 Fax Number: (919) 677-2050 E-mail Address: Harlan.Britt@kmley-hom.com Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, -impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Rex Hospital 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): 4. Location County: Wake Nearest Town: Raleigh Subdivision name (include phase/lot number): Rex Hospital Directions to site (include road numbers, landmarks, etc.): From I-440, take Lake Boone Trail Exit North, turn right at second light (Rex Wellness Center), pond is on left side of road 5. Site coordinates, if available (UTM or Lat/Long): 35° 48' 59.11" N, 78 ° 42' 2.92" W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 50 7. -Nearest body of water (stream/river/sound/ocean/lake): House Creek 8. River Basin: Neuse (Note - this must be one 'of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The site is currently used as a hospital with surrounding ares used for office. space and an apartment complex. Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: The proposed project is to expand the current parking deck and to construct an medical office building adjacent to the parking deck. The expanded parking deck will be utilized by a future proposed cancer center. 11. Explain the purpose of the proposed work: To expand existing medical facilities and office space and provide for the additional needed parking. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. No past permits have been requested or obtained for this project. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No future 404/401 will be required for the additional work proposed in the future. The stormwater facilities are being designed for a built out condition which includes the proposed future cancer center. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Provide a written description of the proposed impacts: A pond classified as "Waters of the US" is proposed to be modified for expansion of the parking deck 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (es/no) Distance to Nearest Stream (linear feet) Type of Wetland*** None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's.(FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at htty://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: 0 Total area of wetland impact proposed: 0 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Im act Perennial or Intermittent? ( leasespecify) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,. dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.uses.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mWguest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: N/A Page 8 of 12 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) 1 Excavation & fill 0.07 N/A Pond * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the ,desired site plan was developed. - If applicable, discuss construction techniques to be followed during construction to reduce impacts. The parking, garage requires two points of ingress/egress for the safety of the user, including no "dead end" configurations in the garage. Existing accessibility relative to the existing parking garage configuration do not allow for other alternatives to expansion of the parking garage. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at htlp:Hh2o.enr.state.nc.us/ncwetlands/stnngide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. No mitigation plan is pro]osed at this time for the open water impacts. The proposed impacts- are less than a tenth of an acre. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.ne.us/wM/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): 5 2 Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ® No El If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3,260 3 9,780 2 5,016 1.5 7,524 Total 8,276 17,304 * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. Page 11 of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or- Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. Payment into the Riparian Buffer Restoration Fund. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. . See attached stormwater management plans which include existing and proposed impervious acreage and nitrogen calculations along with proposed stormwater controls. XIL Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Utilize current wastewater facilities XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work.schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species,. accessibility problems, or other issues outside of the applicant's control). A minor variance for the pond buffer was submitted on September 17, 2003. The proposed mitigation would include payment into the Riparian Buffer Restoration Fund for the proposed buffer impacts. Applicant/Agent's Signature Tate (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 Project No. DWQ (to be provided by DWQ DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay, final review and approval of the project. 1. PROJECT INFORMATION (please complete the following information): Project Name : REx t4a0I-0(- Contact Person: nc S MW,4¢T Phone Number: ( 511 ) '76 4 - 7 Z6y For projects with multiple basins, specify which basin this worksheet applies to: Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation Permanent Pool Surface Area Drainage Area Impervious Area Permanent Pool Volume Temporary Pool Volume Forebay Volume SA/DA used Diameter of Orifice 38 Z, o ft. (average elevation of the floor of the basin) 31 V, 0 ft. (elevation of the orifice invert out) '71 g11 .0 ft. (elevation of the outlet structure invert in) 11A, -Lo 0 sq. Z$ .1?t o ac. 7-0.9g ac. W 5, c 7 z cu. ft. 7$? 0Z5 cu. ft. t o ,i -r 9 cu. ft. t. $7 I. S in. (water surface area at permanent pool elevation) (on-site and off-site drainage to the basin) . (on-site and off-site drainage to the basin) (combined volume of main basin and forebay) (volume detained on top of the permanent pool) (surface area to drainage area ratio) (draw down orifice diameter). II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. The temporary pool controls runoff from the 1 inch storm event. The basin length to width ratio is greater than 3:1. The basin side slopes are no steeper than 3:1. Cexcvy 3E1-0-j SN6tf ) A submerged and vegetated perimeter shelf at less than 6:1 is provided. Vegetation to the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. The forebay volume is approximately equal to 20% of the total basin volume. Sediment storage is provided in the permanent pool. Access is provided for maintenance. A minimum 30-foot vegetative filter is provided at the outlet. A site specific operation and maintenance (O&M) plan is provided. A vegetation management/mowing schedule is provided in the O&M plan. Semi-annual inspections are specified in the O&M plan. A debris check is specified in the O&M plan to be performed after every storm event. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. A responsible party is designated in the O&M plan. 09/97 Page 1 of 1 AGENT AUTHORIZATION FORM Name Rex Hospital Inc. Address: 4420 Lake Boone Trail, Raleigh; NC 27607 Phone: 919 784 3303 Project Name/Description: Birth Center Medical Office Building and Parking Deck. Date: 11-10-2003 The Department of the Army U.S. Army Corps of Engineers, Wilmington District Attention: Jennifer Ri,rdpftp Field Office Raleigh Re: Wetland Related Consulting and Permitting LL To Whom It May Concern: I, an authorized representative of Rex Healthcare, hereby designate and authorize Kimley-Horn and Associates, Inc. to act in my/our behalf as my/our agent solel for the purpose of processing of Section 404 permits and Section 401 Water Quality Certifications applications and to furnish upon request supplemental information in support of applications, etc. from this day forward until successful completion of the permitting process or revocation by the owner. Authorized this the 10th day of November, 2003 r-` Gw Bob Field Print Authorized Representative's Name Authorized Representative's Signature CC: Mr. John Dorney, N.C. Wetlands Unit, 1621 Mail Service Center Raleigh, N. C. 27699-1621 ?•r l off'{ ` , ?• ? ? y I ? ` I ... '} ,. • i.-?1. v..+? ???'1-=. --?1Y ? y4411V rPi a ? ? - IfJ r 4(? ',;I I 1,? LI =: 1, , - `1 .; , . 2.'. FA.f -', - .? '•1? y?r? ( / } ?, 1 ', 1'a ff•• .. Y, , fl f i5`,.: t I S ? ' r ?? ii r L. ,'.S Ql -r:?l ??I C NC?f 1111`'I ?? ?, ?!?!',. '. ': i• 1 /,.-- ? ? \ ?_.;a I - I to t?}rrd?ia .1.3. z .'? . •:11r . , x. ? ', _.??.• . r f> 1+7t `I C ? ,'* II I ? ' (l:` 1 ? ?? y?;? rv k .? U?! L IC- i r- ?l T_ a l w 1 t 'tit I ljr T {' r- ' ?`r V r:• - ? i•f "? .Z , .. i ? 11 . :1 1 . . . (? ti ''r??' Project Area - , t w ` t!J f I ,? " if r 1 M` ? p r I W` j l 4 .? ?? `?Y9 MOT'IY ?s-,?,ct?e?i ? rr 8 n, V -q t. SO; b , - ,J 1tW:? t it • ` - ~ + ? - T ,? f .r?. ? ? 1 i. " ? r? o N how y t l ?. • Sto `? - , " ` 4 , .ya`'? yll,l r yl ?J l?l?? IK3r( ;94 1 L - cl : Title Quad Map (USGS Quad Raleigh West, North Carolina 1968 Revised 1988) Project Rex Hospital Prepared For: Wake County, North Carolina R H it l ex a osp Date Figure 11/11/03 1 - ----- BLUE RIDGE ROAD ALI 1 v Lill' ^, c a N e? 11 i ,;a, ?? ?. ? LL It -?'- ? a i A% ?', ?t XfS WG r'AHFlIN\ N r vN\ 3 r i 11 t' i _ w ' 1 1 `,, (? RAMAGE A RE # 1 1 ?. A DRAINAGE REA ?:. I _ a r Ai I 4 •. IrJ 41 ` --i` w Q 1 ?? y / ?? 1 Two\. l Y \ ?-y q?w?w???wws? 3i.-1 rto'o 3 Z 0 t? 2 U 3Y ?0 a Z v 05 ?z o WzC N; 7m a w r- N Ing U OZ J? ZP og nQ ZZo Na ?cogpCR ?°•-F ??'? ' D pY r y -?- A _ Z ?g= y c- ?o "' ? ' ? A,? J ' ?? 6 0 <, ?"' ?. 1 Q U Z Z •I SGMIII /1 f,- r '? ?? r gF 1 ( ?? A ??', ! ? I 2? po 1 j 1 ( } / _ ?1 < ertnrocamx ` W a i /- LL, ?' co TENINIS VAI NESS CENTER r. r' !f. I4 7t? ? C J . NURSING CHIC scar E o o CENTER r'F w ffio EXISTING POND A E / (21,600 S.F.) J/ to I 111 . 100 R ? Q I 4mm / l \ T E O wIl Y •'qb '? wrli ?r'r? ?a rsr,y ?? ELM A 1 VO EXIST[ G ?- . i R P,FES / EXISTING CONDITIONS ZONE 1 17,539 SF ^f \ i ZONE 2 21,078 SF I 1 ( POND 21,600 SF j e .r.• woman owft-lft ft-ow VA non" 'I \ \ EXISTING POND ?? \ \ \ (21,600 S.F.) \\ \\ ?? \ t ?; \ \ \ \ `?\ \` \ \\ \\ _ ; "? -=NNW aftrft numme T \ -? GRAPHIC SCALE n ,u . r r 41 ,.._ ' .. - \. hoot. 50 M 00 ? a S 0 U Z w- W ?N WS CD B LL. z 3= t? U? cy- Y LJ Z O LPL :D -? co U 0 0 z ?o Q w? CL uj z am a. C_ w 0 ?V) a z ? oz x og LJ c? ?o N? W UO = U, a O}Y 2 Z z J 0 ~ °F cl) 0 or ?0 wQ x z = L W a 0 z; 0 F35 Q no U7 Zu O? In z O w ?U W G? ?m Q ~g O o k0: 0 (n ?0 0 lr-r A \ , BIRTHH r / it 11 /lk .\\ ?4E_ / 11111 r PROPOSED TENNi: STORM COUR '/ ;?Er y r ? P PIPING TYP. 't PARKING DECK ? EXPANSION r (25,761 S.F.) - i ti MEDICAL OFD BUILDING (M( (22,094 S.F. r NEW RETAINING PORE 84\V vvvvvv ??`v ??? ? ? WALL TYP. vvv vv vvvv vvv vvv ??? ;. ? v v v v v v vv vvv vv ? v? __; ?' ?, ON150 P?ND\\\ / ? ;?? , v v v v v vv v v v v v ?/i ? PROPOSED-?;'DRIVEWAY------ W men-aer-?.v EXISTING J RETAINING - WALA,, jYP. 86 9 0 i"E S & Ll Jl rN STREAM 1 ? W W 0? 0 a? z tsa ?o U o? (WJQLL? ? ¢m v J . 0 a V! ?Y Z Z? H U z? a z ?? U= ?bb5 U g? "a ?1 z ?3 a' Y y, ?O l \ 1 71? h PROPOSED` ` fNl STORM - fff 1 ?R f s '`'1 H ? '1 {F ' , PIPING, TYP.:` rPARKING DECK 1 iEXPANSION, ' 1 tl 1 M1 SP 1 Ii (251761 S.F.) MEDICAL BUILDING (MC *4 SF CND (22,094 S.F.) -EXP NS`IO NEW. OREBAY RETAINING WALL TYP. PROPOSED °° \\ PROPOSED POND POND, TYP (249200 S.F.) A? EXISTING POND EXISTING 21,600 SF is-Am ,?. POND, TYP. n in PROPC i ,1\ BIRTH P ? % --? \ DRIVEWAY•----- ' EXISTING 3 ,SF, cl~ #?tND -- A 9 S "/6 F RETAINING koip POND?L/ G WALL, TYP. \i?/ / /? " \\ \ \ 1 1 695 F \ STREAM GRAPMC SCALE 18 If w e 10 x (IN ?twh -50 n w CE U LL. Z t O 2 W Y a a U 0 < ?o LLJ Q U a w? QQV LL= V) J o ?s o a ?o OY J 0 Z6 EF p? o =o XZ wa: a y? a 00 o oU U go 0 duE I' C 0 o f '110 WETUNN 14n1 rR ¦ Stormwater Calculations JAN 2 v 2004 For Minor Variance Submittal WATER QUALITYS'ECI Rex Hospital Campus Raleigh, North Carolina Prepared for: Rex Hospital ©Kimley-Horn and Associates, Inc., 2004 ? ? ? Kimley-Horn and Associates, Inc. a _7 L , TABLE OF CONTENTS OVERVIEW BACKGROUND DEVELOPMENT PERMITTING WATER QUALITY WATER QUANTITY CONCLUSION WATERSHED' MAPS USGS QUADRANGLE MAP (FIGURE 1) OVERALL SITE DEVELOPMENT DRAINAGE MAP (FIGURE 2) SOIL CLASSIFICATIONS USDA SOIL SURVEY MAP (FIGURE 3) SOIL CLASSIFICATIONS WATER QUALITY WET DETENTION BASIN DESIGN SUMMARY WATER QUANTITY POND ROUTING SUMMARY PRE VS. POST WATERSHED CHARACTERISTICS APPENDICES APPENDIX A: PRE-DEVELOPMENT STORMWATER CALCULATIONS APPENDIX B: POST-DEVELOPMENT STORMWATER CALCULATIONS APPENDIX C: OPERATION AND MAINTENANCE AGREEMENT APPENDIX D: SITE PHOTOS OVERVIEW Background This report contains the approach and results of a stormwater analysis prepared for Rex Hospital campus and the proposed expansions. These expansions consist of Phase I: Medical Office Building (MOB) and adjacently located parking garage/deck expansion and Phase II: future Cancer Center, parking deck, and courtyard. The site is located central to the Rex Hospital Campus located at the northeast quadrant of the Blue Ridge Road/Lake Boone Trail intersection in the City of Raleigh, North Carolina. The development area is described as north of the existing wet pond and south of the existing parking garage/deck lower level entrance. The existing hospital property encompasses approximately 62-acres of commercially developed land. The property is split by two watersheds comprised by drainage area one (DA#1) and drainage area two (DA#2). DA#1 flows into an existing wet pond constructed in the late 80's. The pond lies in the southeast corner of the property adjacent to the property's entrance off Lake Boone Trail. The existing pond has a 9.5 foot concrete retaining wall along one side and 3:1 slopes along the remaining perimeter. (The outlet structure is described further in a later portion of this report.) The majority of DA#2 flows off-site undetained with a small portion of the northeast corner of the property draining to a dry detention basin located in the northeast corner of the property. For the purposes of this report, analysis has only been conducted for DA#1, since the existing pond and proposed development is within this watershed. Development Phase I of this project includes the construction of the MOB (approx. 10,000 S.F. footprint) and expansion of the parking garage/deck (approx. 25,000 S.F. footprint). The parking garage expansion will -occur along the existing garage's east side and extend toward the existing wet detention pond. Phase II of the project will be the future Cancer Center and with a courtyard upstream of the pond. This phase of the project is currently in the schematic/concept planning stage; however certain assumptions for development have been made for the purposes of this analysis. The total proposed land area to be developed for both phases is 4.8 acres and is assumed to be 70% impervious when fully developed. Permitting Please refer to the following meeting minutes from an October meeting concerning Neuse River Buffer Rules. These minutes will provide a brief history of the project. PPw 4 KimleyHorn i?. and Associates, Inc. MEMORANDUM OF MEETING MINUTES TOPIC: Rex Hospital - Medical Office Building and Parking Garage Neuse River Basin Rules - Rule 15A NCAC 02B .0233 Diffused Flow Through the Buffer DATE: October 24, 2003 @ 2:00 p.m. ATTENDEES: NCDENR - Wetlands/401 Certification Unit Todd St. John Bob Zarzecki REX Hospital Bob Field Kimley-Horn and Associates, Inc. Norton Webster Will Wilhelm A meeting was held between the staff of Kimley-Horn and Associates (KHA), the NCDENR - Wetlands /401 Certification Unit (Wetlands Unit), and REX Hospital (REX) on October 24, 2003 to discuss the above referenced project. The purpose of the meeting was to discuss the diffused flow requirement of the above referenced rule. Mr. Wilhelm (KHA) gave an overview of the storm water management for the site. In Summary, the site is 10.3 acre development containing a parking garage, a medical office building (MOB), and a future building. The site is part of an overall drainage area of 27.8 acres (a portion of the REX Hospital campus) that drains into an existing pond. The existing pond is fed by 3 outfalls that convey the run-off from the 27.8 acre drainage area. The pond contains a riser structure that contains 3 -14" diameter orifices and therefore provides no extended detention of run-off from small storm events. The existing pond is bordered on one side by a retaining wall and has a maintained grass buffer on the remaining sides. The proposed site plan for the parking garage, MOB and future building will reconfigure the pond and modify the outlet to provide extended detention. This impact to the pond will be permitted under a Nationwide 39. The storm water from the new impervious area can not be diffused through the buffer around the pond due to grades and other site conditions around the pond. The existing pond is hydraulically connected via an outlet structure (riser/culvert) to an intermittent blue line stream. Mr. Webster stated that Ms. Debbie Edwards (DWQ) and the Corp determined during field site visits that the pond is jurisdictional as it is open water that is hydraulically connected to an intermittent stream and therefore has a 50 foot buffer located around its perimeter. Mr. Zarzecki asked if the rip rap channel above the pond is jurisdictional because of how the blue line extends on the USGS quad sheet. Mr. Webster stated that it was his understanding that the channel was not called jurisdictional by DWQ or the Corp. KHA will get clarification from Ms. Edwards on the classification of the existing rip rap ditch above the pond. If the rip rap channel above the existing pond is subject to the Neuse Rules then the site plan as proposed will require a major variance from the EMC. If the rip rap channel is not subject to the Neuse Rules then the Wetlands Unit staff can issue a minor variance for not creating diffused flow through the buffer if the pond is sized and designed per NCDENR's BUT manual to treat the entire contributing drainage area (27.8 acres). It was recognized that the modified pond will provide water quality benefits to both the new impervious area and existing impervious areas that are outside of the project area. The treatment of this currently untreated area (17.5 acres) that is outside of the project area will allow the Wetlands Unit to issue a minor variance. A Variance has already been submitted to the Wetlands Unit for the encroachment of the parking garage and road into buffer zone 2. Mr. Zarzecki stated that buffer mitigation fees would have to be paid for the encroachments into Zone 2. These minutes of the meeting between staff of the Wetlands Unit, REX Hospital, and Kimley-Horn and Associates, Inc. represents KHA's understanding of the issues discussed. Please review these minutes carefully, and advise the undersigned of any corrections or additions within 5 business days of the date below. Date: October 29, 2003 William R. Wilhelm, P.E. CC: All Attendees Tim Grady, KHA FADWQ_Minutes 10_24_03.doc • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Water Quality The existing wet pond was constructed in 1988 to act as a stormwater quantity control device. Its' characteristics are described as a permanent pool depth of 2-6 feet deep and a maximum design depth of 9.5 foot (not including permanent pool depth). Three 14" diameter orifices set at the permanent pool elevation allow the pond to drain very quickly. The existing pond provides some limited water quality treatment; however, as requested, the pond has been modified to meet design criteria specified in NCDENR's "Stormwater Best Management Practices" manual and the City of Raleigh "Stormwater Design Manual". The outlet structure has been modified to provide a 2-5 day drawdown for the 1" storm for the entire watershed contributing to the pond. This includes three (3) 1.5" orifices at the permanent pool elevation. The pond will also be excavated to provide the average depth as specified by the design criteria (see grading plans) The stormwater pond is designed to provide 85% total suspended solid (TSS) removal and 25% nitrogen removal in order to reduce to the nitrogen loading rate to below 10 lbs/ac/yr per the Neuse Stormwater Rule (15A NCAC 2B .0235) of the "Neuse River Basin: Model Stormwater Program for Nitrogen Control," August, 1999. Water Quantity The existing pond outlet control structure is described as a 6' x 6' rectangular box with (3) 14-inch diameter orifices set at the permanent pool level. The existing outlet structure also has a 3' high x 4' wide rectangular weir opening constructed on its front side that allows high flows to pass. During major storm events the top of the box acts as an emergency spillway. In addition to water quality, the pond must also meet quantity requirements specified by NCDENR and the City of Raleigh. The 1-year 24-hour storm event was analyzed per NCDENR and the 2, 10, and 100- year events for the City. Additional modifications have been made to the existing outlet structure to meet water, quantity requirements (see outlet structure detail). The pond will release flows at rates that do not exceed the allowable 1; 2, and 10 year events and will pass the 100-year event with 1' of freeboard. Conclusion This report confirms that the proposed 4.8-acre future Rex Hospital development can comply with local stormwater management requirements. The existing wet pond will be retrofitted to comply with local BMP standards. _W11 . air �a� y f- u}�r♦n � .!° ._•5 ti 4v { w r }• � s { � � � br 4>,r � V s � `�',+�" - `✓ � �I 1 -'� .: 11 a _ i. �y{!� 'll tom:. kill i C. I , I 1.�'J 4� a � e Project Area d d� �., r�': ,�' � to ��� �. � �lF� -!}" se !9•. 0 [ '� �„ r y`I 111 � � ' —` `�" �' R�r, LLC: 'F ;1 'Y� `+ e•— t ::1 { aWx t I J i',��,,� �� �fdl rf �r���+f r ? � I �l�• ��+� � _ _ ,f .. A A ��f!f"'- ` sVAN', �. �' � t'M 5 �,�]r %n 9r— 1r I !" I `- d- �- 1 atL��rrt ( ' it i �J Title Quad Map (USGS Quad Raleigh West, North Carolina 1968 Revised 1988) Prepared For: Project Rex Hospital Wake County, North Carolina Rex Hospital Date Figure 11/11/03 1 •ONI 'S3IVIOOSSV ONV N210H-A3lWI>I Ol ALnevn AIOHLM 313 IT'HS •ONI 'S3IVOOSSV ONV MOH-A31M)l A8 NOUV1dVaV ONV NOIIVZIsownV N3mmm ino"M 1N3Wf1000 SIHI NO 3ONvn38 83d08dWl ONV 30 3Sn3N 'O38Vd38d SVM L HOIHM 803 LN3n3 ONV 3socwnd 3Hl 803 AINO O30N31N1 S1 '33M3S d0 1N3NU181SNI NV SV 'N083H 03AV3S38d SNOIS30 ONV SLd33NOO 3M HAM 83HMOI 'M3NU1300 SIHI Z dVW 39VNIV21a VN1108VO H.LNON 'H9131V8 •Oul'ssle'3098ypueWOH•AaIWIH 321(1913 1N3Y4dO13A3a MIS 11V83AO 1V11dSOH UN 0?0 _c- off J e IiIJI .I I i 1 J !?M1 IIn , ?` 9 I in ! ff h f i ++ \ )III i l 1 t' •? 1 art ` i i r .A r: -z I I f ! - - ? .ate /!'i 1AA <r M% 0 CL , uj III 't 7 - -? 1 &A- INS • • • • • • • • • • • • • • • • • • • • • • i • • • • • • • • • • • • • • • • • • ?F Title: USDA Soil Survey Map (Wake County, 1970) - Project: Stormwater Analysis . - Rex Hospital Kimley-Horn and Associates, Inc, Raleigh, North Carolina Dater Scale: Project No. Figure: 011274011 3 r r r Rex Hospital Kimley-Horn and Associates, Inc. Raleigh, North Carolina Date: 1/28/2004 Soil Classifications Prepared by: JNG Checked by: HKB r r Soils present in the watershed, based on the Soil Survey of Wake County Soil Conservation Service, 1970 r- r Symbol ' Name Description r . CgB2 Cecil sandy loam CgC Cecil sandy loam r CgC2 Cecil sandy loam r CeD Cecil sandy loam ¦ r Soil Group B will be used in the analysis contained herein. r r r r r r r r r r N • • • • Slope 2-6% 6-10% 6-10% 10-15% Group B B B B r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r C ^ Kimley-Hom and Associates, Inc. WET DETENTION BASIN Project Information: Project Name: Rex Hospital - MOB and Deck Expansion .KHA Project #: 011274011 Designed by: EJG Date: 11/12/03 Revised by: JNG Date:. 1/5/04 Checked by: LVL Date: - Site Information: Drainage Area Description: DA #1 Drainage Area (DA) = 28.90 Acres Impervious Area (IA) = 20.98 Acres Percent Impervious (1) = 72.60% Required Surface Area: Permament Pool Depth = 6 It (assumed) TSS Removal = 85 % SA/DA = 1.87 % (from Table 1.1 in BMP Manual) SA = 23,541 sf = 0.54 ac Provided Surface Area: SA = 24,200 sf = 0.56 ac Required Temporary Storage Volume: Design Storm = 1 inch Determine Rv Value = 0.05 +.009 (1) = 0.70 in/in Storage Volume Required = 73,787 cf (above Permanent Pool) Provided Temporary Storage Volume: Permanent Pool Elev =. 391.00 (2) 2'x T Slot Inv = 394.00 Volume Provided = 78,025 cf (from PondPack) Forebay: Volume Required = 14,757 cf (20% of total volume) Forebay Invert = 383.00 ft Forebay Weir = 391.00 it Volume Provided = 20.179 cf Average Depth Check: Forebay Volume = 20.179 cf (from PondPack) Main Pool Volume = 125.693 cf (from PondPack) Total Wet Pool Volume = 145.872 Average Depth = 6.03 ft Orifice Sizing: Q2 Days = 0.43 cfs Q5 Days = 0.17 cfs Orifice Size = 1.50 in Number of Orifices = 3 Q Orifice = 0.31 cis Drawdown Time = 2.78 days (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Removal Efficiency in the Piedmont % Impervious Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 .0.62 40 1.73 1.43 1:25 1.05 0.90 •0.82 0.77 50 2.06 1.73 1.50 130 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 ' 2.34 2.11 1:83 1.67. Notes: Numbers given in- the body of the table are given in percentages. Coastal SAMA ratios can be obtained from the local DWQ Regional Office. t Rex Hospital Kimle -Horn and Associates, Inc. Raleigh, North Carolina Date: 1/26/2004 Pond Routing Summary Prepared by: JNG Checked by: HKB Pond Routing Summary Per State and City Requirements Analysis Return Existing Conditions Post-Development Conditions % Difference Point (yr) Total Flow Water Total Flow Water (Pre vs. Post) (cfs) Elevation (cfs) Elevation DA #1 1 44.88 392.52 20.86 395.41 -53.52% 2 53.74 392.93 35.34 396.02 -34.24% 10 76.63 394.32 83.38 397.42 8.81% 100 103.37 396.56 149.03 398.59 44.17% Notes: 1. Discharges are taken from PondPack output using the SCS Unit Hydrograph Method (calculations attached) 2. The pond designed is for water quality and quantity control, allowing addittional storage C " and Associates, zL7 and Inc. PRE VS POST WATERSHED CHARACTERISTICS Total Development Area: Pre-Developed Post-Developed Acres Pervious Acres Impervious Acres Pervious Acres Impervious Acres Basin 1 1.11 0.96 0.16 0.33 0.78 Basin 2 0.94 0.88 0.07 0.28 0.66 Basin 3 2.75 2.17 0.58 0.82 1.92 Total Development Area 4.80 4.00 0.80 1.44 3.36 Total Offsite Area Min DA#1: Pre-Developed Post-Developed Acres Pervious Acres Impervious Acres Pervious Acres . Impervious Acres Pond Basin 1.14 1.14 0.00 1.14 0.00 Offsite Basin 1 1.93 - - - - Offsite Basin 2 2.05 - - - - Offs1te Basin 3 18.98 - - - - Total Offsite Area w/in DA#1 24.09 6.47 17.62 6.47 17.62 Total Property Area: Pre-Developed Post-Developed Acres Pervious Acres Impervious Acres Pervious Acres Impervious Acres DA#1 28.90 10.47 18.42 7.91 20.98 DA#2 32.42 11.18 21.24 11.18 21.24 DA#3 0.47 0.47 0.00 0.47 0.00 Total Property Area 61.79 22.12 39.67 19.56 42.23 Soils Information: Soil Type Symbols = CeD, Cg B2, CgC, CgC2 Soil Name= Cecil Hydrologic Soil Group = B CN, Open Space = 79 CN, Impervious Space = 98 Summary Information: Description Pre-Developed Post-Developed DA#1 63.75% 72.61% Percent DA#2 I i 65.52% 65.52% mperv ous Parcel 64.20% 68.34 /o DA#1 91.1 92.8 CN DA#2 N b C 91.4 91.4 urve um er) ( Parcel 91.2 92.0 - • Type.... Master Network Summary Name.... Watershed File.... H:\PN\011274011\drainage\pondpak\PRE.PPW MASTER DESIGN STORM SUMMARY Network Storm Collection: RALEIGH, NC Page 1.01 Total Depth Rainfall Return Event in Type RNF ID ------------ ------ ---------------- ---------------- Dev 2 3.6000 Synthetic Curve TypeII 24hr Dev 1 3.0000 Synthetic Curve Typell 24hr Dev 10 5.3800 Synthetic Curve TypelI 24hr Dev100 8.0000 Synthetic Curve TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun hrs cfs ft ac-ft ----------- ------ ---- ------ ----=----- -- --------- -------- -------- ------------ DA#1 AREA 2 6.343 12.1000 73.05 DA#1 AREA 1 4.984 12.1000 57.82 DA#1 AREA 10 10.472 12.1000 118.08 DA#1 AREA 100 16.663 12.1000 183.51 *OUT 20 JCT 2 6.343 12.2500 53.74 *OUT 20 JCT 1 4.984 12.2500 44.88 *OUT 20 JCT 10 10.472 12.3000 76.63 *OUT 20 JCT 100 16.663 12.3500 103.37 POND 20 IN POND 2 6.343 12.1000 73.05 POND 20 IN POND 1 4.984 12.1000. 57.82 POND 20 IN POND 10 10.472 12.1000 118.08 POND 20 IN POND 100 16.663 12.1000 183.51 SIN: E210 0202E1 C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: Type .... Master Network Summary Page 1.02 Name .... Watershed . File .... H:\PN\011274011\drainage\pondpak\PRE.PPW . MASTER NETWORK SUMMARY SCS Unit Hydrograph Method . (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) . Max Return HYG Vol Qpeak Qpeak Max WSEL . Pond St orage Node ID Type Event ac-ft Trun hrs cfs ft . ac-ft ------ ----------- ---- ------ ---------- -- -------- - -------- -------- POND 20 OUT POND 2 6.343 12.2500 53.74 392.. 93 . 1.039 POND 20 OUT POND 1 4.984 12.2500 44.88 392.52 .813 POND 20 OUT POND 10 10.472 12.3000 76.63 394.32 1.845 . POND 20 OUT POND 100 16.663 12.3500 103.37 396.56 3 r?57 SIN: E2100202E1C0 Kimley Horn & Associates Inc Pond , Pack Ver: Compute Time: Date: • • Type.... Design Storms Name.... RALEIGH, NC File.... H:\PN\011274011\drainage\pondpak\ Title... Project Date: 8/28/2003 Project Engineer: Eric.Granrud Project Title: Rex Hospital-existing pond Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID. = RALEIGH, NC Page 2.01 Storm Tag Name = Dev 2 ---------------------------------------------------------------------- Data Type, File, ID Synthetic Storm TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 1 ------------------------------=--------------------------------------- Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 1.yr Total Rainfall Depth= 3.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev ,10 Data Type, File, ID = Storm Frequency = Total Rainfall Depth= Duration Multiplier = Resulting Duration = Resulting Start Time= Synthetic Storm TypeII 24hr 10 yr 5.3800 in 1 24.0000 hrs .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev100 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 8.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time Date: i Type.... Tc Calcs Page 3.01 Name.... DA#1 File.... H:\PN\011274011\drainage\pondpak\PRE.PPW TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: User Defined Segment #1 Time: .1030 hrs ------------------------------------------------------------------------ Total Tc: .1030 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .3900 hrs SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver : Cornpu :e Time: Date: r Type.... Runoff CN-Area Page 4.01 Name.... DA#1 File.... H:\PN\011274011\drainage\pondpak\PRE.PPW RUNOFF CURVE NUMBER DATA -------------------------------------------------------------------------- Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C RUC CN ------------------------------- ---- --------- ----- ----- ------ Impervious Areas- Paved parking to 98 18.420 98.00 Open space (Lawns,parks etc.) - Fai 79 10.470 79.00 COMPOSITE AREA & WEIGHTED CN ---> 28.890 91.11 (91) S/N: E2100202EICO Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: Type.... Unit Hyd. Summary Name.... DA#1 Tag: Dev 1 File.... H:\PN\011274011\drainage\pondpak\PRE.PPW Storm... TypeII 24hr Tag: Dev 1 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 1 year storm Page 5.01 Event: 1 yr Duration = 24.0000 hrs Rain Depth = 3.0000 in Rain Dir = H:\PN\011274011\drainage\pondpak\ Rain File -ID = - TypeII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = H:\PN\011274011\drainage\pondpak\ HYG File - ID = work_pad.hyg - DA#1 Dev 1 Tc (Min. Tc) _ .3900 hrs Drainage Area = 28.890 acres Runoff CN= 91 -------------------------------------------- -------------------------------------------- Computational Time Increment = .05200 hrs Computed Peak Time = 12.1160 hrs Computed Peak Flow = 58.50 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output 12.1000 hrs Peak Flow, Interpolated Output 57.82 cfs -------------------------------------------- -------------------------------------------- DRAINAGE AREA ------------------- ID:DA#1 CN = 91 Area = 28.890 acres S = .9890 in 0.25 = .1978 in Cumulative Runoff ------------------- 2.0712 in 4.986 ac-ft HYG Volume... 4.984 ac-ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .39000 hrs (ID: DA#1) Computational Incr, Tm = .05200 hrs = 0.20000 Tp Unit Hyd. Shape Fact or = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/ Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 83.93 cfs Unit peak time Tp = .26000 hrs Unit receding limb, Tr = 1.04000 hrs Total unit time, Tb = 1.30000 hrs r Type.... Unit Hyd. Summary Page 5.02 Name.... DA#1 Tag: Dev 2 Event: 2 yr File.... H:\PN\011274011\drainage\pondpak\PRE.PPW Storm... TypeII 24hr Tag: Dev 2 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 3.6000 in Rain Dir = H:\PN\011274011\drainage\pondpak\ Rain File -ID - TypeII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = H:\PN\011274011\drainage\pondpak\ HYG File - ID = work_pad.hyg DA#1 Dev ,2 Tc (Min. Tc) _ .3900 hrs Drainage Area = 28.890 acres Runoff CN= 91 Computational Time Increment = .05200,hrs Computed Peak Time = 12.1160 hrs Computed Peak Flow = 73.83 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.1000 hrs Peak Flow, Interpolated Output = 73.05 cfs DRAINAGE AREA ------------------- ID:DA#l CN = 91 Area 28.890 acres S = .9890 in 0.25 = .1978 in Cumulative Runoff ------------------- 2.6359 in 6.346 ac-ft HYG Volume... 6.343 ac-ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .39000 hrs (ID: DA#1) Computational Incr, Tm = .05200 hrs = 0.20000 Tp Unit Hyd. Shape Fact or = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/ Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 83.93 cfs Unit peak time Tp = .26000 hrs Unit receding limb, Tr = 1.04000 hrs Total unit time, Tb = 1.30000 hrs i Type.... Unit Hyd. Summary Page 5.03 Name.... DA#1 Tag: Dev 10, Event: 10 yr File.... H:\PN\011274011\drainage\pondpak\PRE.PPW Storm... TypeII 24hr Tag: Dev 10 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 5.3800 in Rain Dir = H:\PN\011274011\drainage\pondpak\ Rain File -ID = - TypeII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = H:\PN\011274011\drainage\pondpak\ HYG File - ID = work_pad.hyg - DA#1 Dev 10 Tc (Min. Tc) = .3900 hrs Drainage Area = 28.890 acres Runoff CN= 91 Computational Time Increment .05200 hrs Computed Peak Time = 12.1160 hrs Computed Peak Flow = 119.13 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.1000 hrs Peak Flow, Interpolated Output = 118.08 cfs DRAINAGE AREA ------------------- ID:DA#1 CN = 91 Area = 28.890 acres S = _ .9890 in 0.2S = .1978 in Cumulative Runoff ------------------- 4.3517 in 10.477 ac-ft HYG Volume... 10.472 ac-ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .39000 hrs (ID: DA#1) Computational Incr, Tm = .05200 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, Unit peak time Unit receding limb, Total unit time, cep = 83.93 cfs Tp = .26000 hrs Tr = 1.04000 hrs Tb = 1.30000 hrs Type.... Unit Hyd. Summary Name.... DA#1 Tag: Dev100 File.... H:\PN\011274011\drainage\pondpak\PRE.PPW Storm... TypeII 24hr Tag: Dev100 SCS UNIT HYDROGRAPH METHOD Page 5.07 Event: 100 yr STORM EVENT: 100 year storm Duration = 24.0000 hrs Rain Depth = 8.0000 in Rain Dir = H:\PN\011274011\drainag.e\pondpak\ Rain File -ID = - TypeII 24hr Unit Hyd Type= Default Curvilinear HYG Dir = H:\PN\011274011\drainage\pondpak\ HYG File - ID work_pad.hyg - DA#1 Dev100 Tc (Min. Tc) = .3900 hrs Drainage Area = 28.89.0 acres Runoff CN= 91 Computational Time Increment = .05200 hrs Computed Peak Time = 12.1160 hrs Computed Peak Flow 184.94 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.1000 hrs Peak Flow, Interpolated Output = 183.51 cfs DRAINAGE AREA ID:DA#1 CN = 91 Area = 28.890 acres S .9890 in 0.2S = .1978 in Cumulative Runoff ------------------- 6.9245 in 16.671 ac-ft HYG Volume... 16.663 ac-ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = Computational Incr, Tm = 39000 hrs (ID: DA#1) 05200 hrs = 0.20000 Tp Unit Hyd. Shape Factor = K = 483.43/645.333, K = Receding/Rising, Tr/Tp = Unit peak, cjP = Unit peak time Tp = Unit receding limb, Tr = Total unit time, Tb = 483.432 (37.46% under rising limb) .7491 (also, K = 2/(1+(Tr/Tp)) 1.6698 (solved from K = .7491) 83.93 cfs .26000 hrs 1.04000 hrs 1.30000 hrs Type.... Vol: Elev-Area Page 6.01 Name.... POND 20 File.... H:\PN\011274011\drainage\pondpak\PRE.PPW Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in) (sq.ft) (sq.ft) -- -- (ac-ft) - - - (ac-ft) ---------- ------------ 391.00 --------------------- ----- 22468 --- ------ 7-- 0 --- ---- .000 --- .000 392.00 ----- 23438 68854 .527 .527 393.00 ----- 24568 72002 .551 1.078 394.00 ----- 25727 75436 .577 1.655 395.00 ----- 26936 78987 .604 2.260 396.00 ----- 28070 82503 .631 2.891 397.00 ----- 29259 85987 .658 3.549 398.00 ----- 30443 89547 .685 4.234 399.00 ----- 31640 93119 .713 4.947 400.00 ------ 33045 97020 .742 5.689 401.00 ----- 33050 99143 .759 6.448 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time Date: ¦ r Type.... Outlet Input Data Page 7.01 Name.... Outlet#1 File.... H:\PN\011274011\drainage\pondpak\PRE.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 391.00 ft Increment = 20 ft Max. Elev.= 401.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both All owed Structure No. Outfall E1, ft E2; ft ----------------- - Inlet Box --- ------- R ---> B --------- - 400.500 -------- 401.000 Weir-Rectangular W ---> B 396.750 399.750 Orifice-Circular 0 ---> B 391.000 401.000 Orifice-Circular 0 ---> B 391.000 401.000 Orifice-Circular 0 ---> B 391.000 401.000 TW SETUP, DS Channel SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: - s • i Type.... Outlet Input Data Page 7.02 Name.... Outlet#1 File.... H:\PN\011274011\drainage\pondpak\PRE.PPW OUTLET STRUCTURE INPUT DATA Structure ID = R Structure Type ------ = Inlet Box ------------- ------ ----------- # of Openings = 1 Invert Elev. = 400.50 ft Orifice Area = 36.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 24.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 - Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID Structure Type --------------- # of Openings Crest Elev. Weir Length Weir Coeff. Weir TW effects Structure ID = 0 Structure Type = Orifice-Circular ------------------------------------ # of Openings 3 Invert Elev. = 391.00 ft Diameter 1.1670 ft Orifice Coeff. _ .600 SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: W Weir-Rectangular ---------------- 1 396.75 ft 4.00 ft 3.000000 (Use adjustment equation) Date: • • Type.... Outlet Input Data Name.... Outlet#1 File.... H:\PN\011274011\drainage\pondpak\PRE.PPW OUTLET STRUCTURE INPUT DATA Structure ID = 0 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 3 Invert Elev. = 391.00 ft Diameter = 1.1670 ft Orifice Coeff. _ .600 Structure ID = 0 Structure Type = Orifice-Circular ------------------------------------ # of Openings 3 Invert Elev. 391.00 ft Diameter = 1.1670 ft Orifice Coeff. _ .600 Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time:- Date: Page 7.03 Type.... Pond Routing Summary Page 8.01 Name.... POND 20 OUT Tag: Dev 1 Event: 1 yr File.... H:\PN\011274011\drainage\pondpak\PRE.PPW Storm... TypeII 24hr Tag: Dev 1 LEVEL POOL ROUTING SUMMARY HYG Dir = H:\PN\011274011\drainage\pondpak\ Inflow HYG file = work_pad.hyg - POND 20 IN D.ev 1 Outflow HYG file = work_pad.hyg - POND 20 OUT Dev 1 Pond Node Data = POND 20 Pond Volume Data = POND 20 Pond Outlet Data =Outlet#1 No Infiltration INITIAL CONDITIONS Starting WS Elev = 391.00 ft Starting Volume = .000 ac-ft Starting Outflow .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 57.82 cfs at 12.1000 hrs Peak Outflow = 44.88 cfs at 12.2500 hrs ----------------------------------------------------- Peak Elevation 392.52 ft Peak Storage = .813 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 + HYG Vol IN = 4.984 Infiltration = .000 - HYG"Vol OUT = 4.984 - Retained Vol = .000 Unrouted Vol = .000 ac-ft (.000% of Inflow Volume) SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: Type.... Pond Routing Summary Name.... POND 20 OUT Tag: Dev 2 File.... H:\PN\011274011\drainage\pondpak\PRE.PPW Storm... TypeII 24hr Tag: Dev 2 LEVEL POOL ROUTING SUMMARY HYG Dir = H:\PN\011274011\drainage\pondpak\ Inflow HYG file = work-pad.hyg - POND 20 IN Dev 2 Outflow HYG file = work_pad.hyg - POND 20 OUT Dev 2 Pond Node Data = POND 20 Pond Volume Data = POND 20 Pond Outlet Data = Outlet#1 No Infiltration INITIAL CONDITIONS Starting WS Elev = 3191.00 ft Starting Volume = .000 ac-ft Starting Outflow _ .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 73.05 cfs at 12.1000 hrs Peak Outflow = 53.74 cfs at 12.2500 hrs - ---- Peak --------------- Elevation = ---------- 392.93 ----------- ------------ ft Peak ---- ----- Storage = --------------- -------------- 1.039 ---------- ---------- ac-ft ------------------------ ------------------------ MASS BALANCE (ac-ft) -------------------- + Initial Vol = ------ .000 + HYG Vol IN _ 6.343 - Infiltration = .000 - HYG Vol OUT = 6.343 - Retained Vol = .000 Unrouted Vol = -.000 ac-ft (.000% of Inflow Volume) Page 8.02 Event: 2 yr SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: ¦ r ! ! ! ! ! ! ! ! ! ! Type.... Pond Routing Summary Name.... POND 20 OUT Tag: Dev 10 File.... H:\PN\011274011\drainage\pondpak\PRE.PPW Storm... TypeII 24hr Tag: Dev 10 HYG Dir Inflow HYG file Outflow HYG file Pond Node Data Pond Volume Data Pond Outlet Data No Infiltration INITIAL CONDITIONS LEVEL POOL ROUTING SUMMARY H:\PN\011274011\drainage\pondpak\ work-pad.hyg - POND 20 IN Dev 10 work-pad.hyg - POND 20 OUT Dev 10 POND 20 POND 20 Outlet#1 Starting WS Elev = 391.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTF,OW HYDROGRAPH SUMMARY Peak Inflow = 118.08 cfs at 12.1000 hrs Peak Outflow = 76.63 cfs at 12.3000 hrs -- ----- Peak -------------- Elevation = ----------- 394.32 --------- ------------ ft Peak Storage = 1.845 ac-ft MASS BALANCE (ac-ft) ------------- + Initial Vol ------------- = .000 + HYG Vol IN - 10.472 - Infiltration = .000 - HYG Vol OUT = 10.472 - Retained Vol = .000 Unrouted Vol = .000 ac-ft (.000% of Inflow-Volume) Page 8.03 Event: 10 yr SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: Type.... Pond Routing Summary Name.... POND 20 OUT Tag: Dev100 File.... H:\PN\011274011\drainage\pondpak\PRE.PPW Storm... Typell 24hr Tag: Dev100 LEVEL POOL ROUTING SUMMARY HYG Dir Inflow HYG file Outflow HYG file Pond Node Data Pond Volume Data Pond Outlet Data No Infiltration INITIAL CONDITIONS H:\PN\011274011\drainage\pondpak\ work_pad.hyg - POND 20 IN Dev100 work_pad.hyg - POND 20 OUT Dev100 POND 20 POND 20 Outlet#1 Starting WS Elev = 391.00 ft Starting Volume .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 183.51 cfs at 12.1000 hrs Peak Outflow _ 103.37 cfs at 12.3500 hrs --------------------- Peak Elevation = -------- 396.56 ------------------------ ft Peak Storage 3.257 ac-ft MASS BALANCE (ac-ft) ------------- + Initial Vol ------------- = .000 + HYG Vol IN = 16.663 - Infiltration = .000 - HYG Vol OUT = 16.663 - Retained Vol = .000 Unrouted Vol = .000 ac-ft Page 8.04 Event: 100 yr (.000% of Inflow Volume) SIN: E2100202EICO Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: i i i r r r r i i i i r r r r r r i i i i i i i i i r i r i r r r r i Type.... Master Network Summary Name.... Watershed File.... H:\PN\011274011\drainage\pondpak\POST.PPW MASTER DESIGN STORM SUMMARY Network Storm Collection: RALEIGH, NC Page 1.01 Total Depth Rainfall Return Event in Type RNF ID ------------ ------ ---------------- ---------------- Dev 2. 3.6000 Synthetic Curve TypeII 24hr Dev 1 3.0000 Synthetic Curve TypelI 24hr Dev 10 5.3800 Synthetic Curve TypeII 24hr Dev100 8.0000 Synthetic Curve TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method, (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun hrs cfs ft ac-ft ----------------- ---- ------ ---------- -- --------- -------- -------- ------------ DA#1 AREA 2 6.814 12.1000 77.39 DA#1 AREA 1 5.424 12.1000 62.20 DA#1 AREA 10 11.001 12.1000 122.05 DA#1 AREA 100 17.237 12.1000 186.87 *OUT 20 JCT 2 6.803 12.4000 35.34 *OUT 20 JCT 1 5.414 12.5000 20.86 *OUT 20 JCT 10 10.988 12.3000 83.38 *OUT 20 JCT 100 17.222 12.2500 149.03 POND 20 IN POND 2 6.814 12.1000 77.39 POND 20 IN POND 1 5.424 12.1000 62.20 POND 20 IN POND 10 11.001 12.1000 122.05 POND 20 IN POND 100 17.237 12.1000 186.87 SIN: E2100202E1C0 -Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r Type.:.. Master Network Summary Page 1.02 Name.... Watershed File.... H:\PN\011274011\drainage\pondpak\POST.PPW MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond St orage Node ID Type Event ac-ft Trun hrs cfs ft ac-ft ------ ----- ------ ---- ------ ---------- ------- -------- -------- ------- POND ----- 20 OUT POND 2 6.803 12.4000 35.34 396,.02 3.101 POND 20 OUT POND 1 5.414 12.5000 20.86 395.41 2.696 POND 20 OUT POND 10 10.988 12.3000 83.38 397.42 4.054 POND 20 OUT POND 100 17.222 12.2500 149.03 398.59 4.887 SIN: E210 0202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: • Type.... Design Storms Name.... RALEIGH, NC File.... H:\PN\011274011\drainage\pondpak\ Title... Project Date: 8/28/2003 Project Engineer: Eric.Granrud Project Title: Rex Hospital existing pond Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = RALEIGH, NC Storm Tag Name = Dev 2 Data Type, File, ID = Storm Frequency = Total Rainfall Depth= Duration Multiplier = Resulting Duration = Resulting Start Time= Page 2.01 Synthetic Storm TypeII 24hr 2 yr 3.6000 in 1 24.0000 hrs .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 1 Data.Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.0000 in Duration Multiplier = 1 Resulting Duration =24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 10 Data Type, File, ID Storm Frequency = Total Rainfall Depth= Duration Multiplier = Resulting Duration = Resulting Start Time= Storm Tag Name = --------------------- Data Type, File, ID = Storm Frequency = Total Rainfall Depth= Duration Multiplier = Resulting Duration = Resulting Start Time= Synthetic Storm TypeII 24hr 10 yr 5.3800 in 1 24.0000 hrs .0000 hrs Step= .1000 hrs End= 24.0000 hrs Dev100 Synthetic Storm TypeII 24hr- 100 yr 8.0000 in 1 24.0000 hrs .0000 hrs Step .1000 hrs End= 24.0000 hrs SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: Type.... Tc.Calcs Page 3.01 Name.... DA#1 File.... H:\PN\011274011\drainage\pondpak\POST.PPW . . . . . . . . . . TIME OF CONCENTRATION CALCULATOR . -------- ------------------------------------------------------ ---------- Segment #1: Tc: User Defined . Segment #1 Time: .1030 hrs -------- ------------------------------------------------------ ---------- Total Tc 1030 hrs . Calculated Tc < Min.Tc: Use Minimum Tc ... . Use Tc = .3900` hrs --------------- ---------- . SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: w Type.... Runoff CN-Area Page 4.01 Name... DA#1 File.... H:\PN\011274011\drainage\pondpak\POST.PPW RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C RUC CN -------------------------------- ---- --------- ----- ----- ------ Impervious Areas - Paved parking to 98 20.980 98.00 Open space (Lawns,parks etc.) - Fai 79 7.910 79.00 COMPOSITE AREA & WEIGHTED CN ---> 28.890 92.80 (93) SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: i • Type.... Unit Hyd. Summary Name.... DA#1 Tag: Dev 1 File.... H:\PN\011274011\drainage\pondpak\POST.PPW Storm... TypeII 24hr Tag: Dev 1 Page 5.01 Event: 1 yr SCS UNIT HYDROGRAPH METHOD STORM EVENT: 1 Duration Rain Dir Rain File -ID Unit Hyd Type HYG Dir HYG File - ID Tc (Min. Tc) Drainage Area year storm 24.0000 hrs Rain Depth = 3.0000 in H:\PN\011274011\drainage\pondpak\ - TypeII 24hr Default Curvilinear H:\PN\011274011\drainage\pondpak\ work-pad.hyg - DA#1 Dev 1 .3900 hrs 28.890 acres Runoff CN= 93 Computational Time Increment = .05200 hrs Computed Peak Time = 12.1160 hr.s Computed Peak Flow = 62,84 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.1000 hrs Peak Flow, Interpolated Output = 62.20 cfs DRAINAGE AREA ------------------- ID:DA#l CN - 93 Area = 28.890 acres S = .7527 in 0.25 = .1505 in Cumulative Runoff ------------------- 2.2541 in 5.427 ac-ft HYG Volume... 5.424 ac-ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .39000 hrs (ID: DA#1) Computational Incr, Tin = .05200 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 83.93 cfs Unit peak time Tp = .26000 hrs Unit receding limb, Tr = 1.04000 hrs Total unit time, Tb = 1.30000 hrs Type.... Unit Hyd. Summary Page 5.02 Name.... DA#1 Tag: Dev 2 Event: 2 yr File.... H:\PN\011274011\drainage\pondpak\POST.PPW Storm... TypeII 24hr Tag: Dev 2 • SCS UNIT HYDROGRAPH METHOD STORM EVENT: 2 year storm Duration = 24.0000 hrs Rain Depth = 3.6000 in Rain Dir = H:\PN\011274011\drainage\pondpak\ Rain File -ID = - TypeII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = H:\PN\011274011\drainage\pondpak\ HYG File - ID = work pad.hyg - DA#1 Dev 2 _ Tc (Min. Tc) = .3900 hrs . Drainage Area = 28.890 acres Runoff CN= 93 Computational Time Increment = .05200 hrs Computed Peak Time = 12.1160 hrs . Computed Peak Flow = 78.12 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.1000 hrs = 7 39 cfs Output Peak Flow, Interpolated - ---- 7 - - DRAINAGE AREA . ------------------- ID:DA#1 CN - 93 . Area = 28.890 acres S = .7527 in 0.2S = .1505 in • Cumulative Runoff ------------------- 2.8316 in 6.817 ac-ft HYG Volume... 6.814 ac-ft (area under HYG curve) . ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .39000 hrs (ID: DA#1) Computational Incr, Tm = .05200 hrs = 0.20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) . K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from K = .7491) Unit peak, qp = 83.93 cfs h rs Unit peak time Tp = .26000 Unit receding limb, Tr = 1.04000 hrs Total unit time, Tb = 1.30000 hrs W Type.... Unit Hyd. Summary Page 5.03 Name.... DA#1 Tag: Dev 10 Event: 10 yr File.... H:\PN\011274011\drainage\pondpak\POST.PPW Storm... TypeII 24hr `Tag: Dev 10 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 5.3800 in Rain Dir = H:\PN\011274011\drainage\pondpak\ Rain File -ID - TypeII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = H:\PN\011274011\drainage\pondpak\ HYG File - ID = work-pad.hyg - DA#1 Dev 10 Tc (Min. Tc) = .3900 hrs Drainage Area = 28.890 acres Runoff CN= 93 Computational Time Increment = ..05200 hrs Computed Peak Time = 12.1160 hrs Computed Peak Flow = 123.03 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.1000 hrs Peak Flow, Interpolated Output = 122.05 cfs DRAIiy'AGE AREA ------------------- ID:DA#1 CN = 93 Area = 28.890 acres S = .7527 in 0.2S = .1505 in Cumulative Runoff ------------------- 4.5715 in 11.006 ac-ft HYG Volume... 11.001 ac-ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .39000 hrs (ID: DA#1) Computational Incr, Tm = .05200 hrs = 0. 20000 Tp Unit Hyd. Shape Factor = 483.432 (37.46% under rising limb) K = 483.43/645.333, K = .7491 (also, K = 2/(1+(Tr/Tp)) Receding/Rising, Tr/Tp = 1.6698 (solved from'K = .7491) Unit peak, cjP = 83.93 cfs Unit peak time Tp = .26000 hrs Unit receding limb, Tr = 1."04000 hrs Total unit time, Tb = 1.30000 hrs W Type.... Unit Hyd. Summary Page 5.04 Name.... DA#1 Tag: Dev100 Event: 100 yr File.... H:\PN\011274011\drainage\pondpak\POST.PPW Storm... TypelI 24hr Tag: Dev100 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 100 year storm Duration 24.0000 hrs Rain Depth = 8.0000 in Rain Dir = H:\PN\011274011\drainage\pondpak\ Rain File -ID = - TypeII 24hr Unit Hyd Type-= Default Curvilinear HYG Dir = H:\PN\011274011\drainage\pondpak\ HYG File - ID = work-pad.hyg - DA#1 Dev100 Tc (Min. Tc) _ .3900 hrs Drainage Area = 28.890 acres Runoff CN= 93 Computational Time Increment = .05200 hrs Computed Peak Time = 12.1160 hrs Computed Peak Flow = 188.24 cfs Time Increment for HYG File = .0500 hrs Peak Time, Interpolated Output = 12.1000 hrs Peak Flow, Interpolated Output= 186.87 cfs DRAINAGE AREA ------------------- ID:DA#1 CN = 93 Area 28.890 acres S = .7527 in 0.25 = .1505 in Cumulative Runoff ------------------- 7.1626 in 17.244 ac-ft HYG Volume... 17.237 ac-ft (area under HYG curve) ***** SCS UNIT HYDROGRAPH PARAMETERS ***** Time Concentration, Tc = .39000 hrs (ID: DA#1) Computational Incr, Tm = .05200 hrs = 0.20000 Tp Unit Hyd. Shape Factor = K = 483.43/645.333, K = Receding/Rising, Tr/Tp = Unit peak, CIp = Unit peak time Tp = Unit receding limb, Tr = Total unit time, Tb = 483.432 (37.46% under rising limb) .7491 (also,.K = 2/(1+(Tr/Tp)) 1.6698 (solved from K = .7491) 83.93 cfs .26000 hrs 1.04000 hrs 1.30000 hrs • Type.... Vol: Elev-Area Page 6.01 - Name.... POND 20 File.... H:\PN\01127401 1\drainag e\pondpak\POST.PPW Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum . (ft) (sq.in) ----------------------- (sq.ft --------- ) (sq.ft) =----------------- (ac-ft) ------- (ac-ft) --------------- 391.00 ----- 24093 0 .000 .000 • 392.00 ----- 25632 74576 .571 .571 393.00 ----- - 26675, 78455 .600 1.171 . 394.00 ----- 1 27356 81044 .620 1.791 - 395.00 ----- 28175 83293 .637 2.429 396.00 29060 85849 .657 3.086 - 397.00 ----- 30000 88586 .678 3.763 398.00 ----- 30923 91381 .699 4.463 399.00 ----- 31915 94253 .721 5.184 - 400.00 ----- 27974 89769 .687 5.871 401.00 ----- 35194 94545 .723 6.594 . - POND VOLUME EQUATIONS - * Incremental volume computed by the Conic Metho d for R eservoir Volumes. • Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.( Area1*Area2)) where: EL1, EL2 = Lower and upper elevatio ns of t he increment - Areal,Area2 = Areas computed for EL1, EL2, r espectively Volume = Incremental volume betw een EL1 and EL2 . SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack,Ver: C ompute Time: Date: • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Type.... Outlet Input Data Page 7.01 Name.... Outlet #2 File.... H:\PN\011274011\drainage\pondpak\POST.PPW REQUESTED POND WS ELEVATIONS: Min. Elev.= 391.00 ft Increment .20 ft Max. Elev.= 401.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Inlet Box R ---> B 400.500 401.000 Weir-Rectangular W ---> B 396.750 401.000 Weir-Rectangular W2 ---> B 394.000 401.000 Orifice-Circular 0 ---> B 391.000 401.000 Orifice-Circular. 0 ---> B 391.000 401.000 TW SETUP, DS Channel SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: w Type.... Outlet Input Data Page 7.02 Name.... Outlet #2 File.... H:\PN\011274011\drainage\pondpak\POST.PPW OUTLET STRUCTURE INPUT DATA Structure ID = R Structure Type = Inlet Box ------- ------ ---------------- # of Openings ------- = 1 Invert Elev. = 400.50 ft Orifice Area _ 36.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 24.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID = W Structure Type -------- = Weir-Rectangular -------------------- -------- # of Openings = 1 Crest Elev. = 396.75 ft Weir Length = 4.00 ft Weir Coeff. = 3.000000 Weir TW effects (Use adjus tment equation) SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: a IND IND Ila I Ila IND IND IND IND IND IND a. a a a IND a a IND a IND Type.... Outlet Input Data Name.... Outlet #2 File.... H:\PN\011274011\drainage\pondpak\POST.PPW OUTLET STRUCTURE INPUT DATA Structure ID Structure Type ------ ------ # of Openings Crest Elev. Weir Length Weir Coeff. Weir TW effects W2 Weir-Rectangular ---------------- 1 394.00 ft 4.00 ft 3.000000 (Use adjustment equation) Structure ID = 0 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 3 Invert Elev. = 391.00 ft 1iameter = .1250 ft Orifice Coeff. .600 Structure ID = 0 Structure Type = Orifice-Circular # of Openings = 3 Invert Elev. = 39110 ft Diameter .1250 ft Orifice Coeff. _ .600 Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES.... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs Page 7.03 W Type.... Pond Routing Summary Name.... POND 20 OUT Tag: Dev 1 File.... H:\PN\011274011\drainage\pondpak\POST.PPW Storm... TypeiI 24hr Tag: Dev 1 LEVEL POOL ROUTING SUMMARY HYG Dir = H:\PN\011274011\drainage\pondpak\ Inflow HYG file = work_pad.hyg -,POND 20 IN Dev 1 Outflow HYG file = work_pad.hyg - POND 20 OUT Dev 1 Pond Node Data = POND 20 Pond Volume Data = POND 20 Pond Outlet Data = Outlet #2 No Infiltration INITIAL CONDITIONS Starting WS Elev = 391.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 62.20 cfs at 12.1000 hrs Peak Outflow = 20.86 cfs at 12.5000 hrs ----- Peak -------------- Elevation = ----------- 395.41 ----------------------- ft Peak ----- ----- Storage = -------------- -------------- 2.696 ----------- ----------- ac-ft ----------------------- ----------------------- MASS BALANCE (ac-ft) -------------------- + Initial Vol = ------ .000 + HYG Vol IN = 5.424 - Infiltration = .000 - HYG Vol OUT = 5.414 - Retained Vol = .010 Unrouted Vol = -.000 ac-ft (.001% of Inflow Volume) Page 8.01 Event: 1 yr SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: Type.... Pond Routing Summary Page 8.02 Name.... POND 20 OUT Tag: Dev 2 Event: 2 yr File.... H:\PN\011274011\drainage\pondpak\POST.PPW Storm... TypeII 24hr tag: Dev 2 LEVEL POOL ROUTING SUMMARY HYG Dir H:\PN\011274011\drainage\pondpak\ Inflow HYG file = work_pad.hyg - POND 20 IN Dev 2 Outflow HYG file = work_pad.hyg - POND 20 OUT Dev 2 • Pond Node Data POND 20 Pond Volume Data = POND 20 Pond Outlet Data = Outlet #2 - No Infiltration INITIAL CONDITIONS ---------------------------------- Starting WS Elev = 391.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs • _ Time Increment = .0500 hrs -------------------- - INFLOW/OUTFLOW -HYDROGRAPH-SUMMARY • Peak Inflow = 77.39 cfs at 12.1000 hrs Peak Outflow = 35.34 cfs at 12.4000 hrs ----------------------------------------------------- Peak Elevation 396.02 ft Peak Storage = 3.101 ac-ft MASS BALANCE (ac-ft) -------------------------- + Initial Vol = .000 i + HYG Vol IN = 6.814 - Infiltration = .000 - - HYG Vol OUT = 6.803 - Retained Vol = ----_-_011 Unrouted Vol = -.000 ac-ft (.001% of Inflow Volume) • SIN- E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: w Type.... Pond Routing Summary Name.... POND 20 OUT Tag: Dev 10 File.... H:\PN\011274011\drainage\pondpak\POST.PPW Storm... TypeII 24hr Tag: Dev 10 HYG Dir Inflow HYG file Outflow HYG file Pond Node Data Pond Volume Data Pond Outlet Data No Infiltration INITIAL CONDITIONS LEVEL POOL ROUTING SUMMARY H:\PN\011274011\drainage\pondpak\ work_pad.hyg - POND 20 IN Dev 10 work-pad.hyg - POND 20 OUT D.ev 10 POND 20 POND 20 Outlet #2 Starting WS Elev = 391.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs 'INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow - 122.05 cfs at 12.1000 hrs Peak Outflow = 83.38 cfs at 12.3000 hrs ------------------- --------------------- Peak Elevation = --------- 397.42 ---- ft Peak Storage = 4.054 ac-ft MASS BALANCE (ac-ft) ------------- + Initial Vol ------------- = .000 + HYG Vol IN = 11.001 - Infiltration = .000 - HYG Vol OUT = 10.988 - Retained Vol = .013 Unrouted Vol = -.000 ac-ft (.001% of Inflow Volume) SIN: E2100202E1C0 Kimley Horn & Associates Inc PondPack Ver: Compute Time: Page 8.03 Event: 10 yr Date: W i i i i i i i i i i i i i i i i i i i i i i i i i i i i i Type.... Pond Routing Summary Name.... POND 20 OUT Tag: Dev100 File.... H:\PN\011274011\drainage\pondpak\POST.PPW Storm... TypeII 24hr Tag: Dev100 LEVEL POOL ROUTING SUMMARY HYG Dir H:\PN\011274011\drainage\pondpak\ Inflow HYG file = work-pad.hyg - POND 20 IN Dev100 Outflow HYG file =.work_pad.hyg - POND 20 OUT Dev100 Pond Node Data = POND 20 Pond Volume Data = POND 20 Pond Outlet Data = Outlet #2 No Infiltration INITIAL CONDITIONS Starting WS Elev = 391.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs INFLOW/OUTFLOW HYDROGRAPH SUMMARY Peak Inflow = 186.87 cfs at 12.1000 hrs Peak Outflow = 149.03 cfs at 12.2500 hrs --------------------- Peak Elevation - --------- 398.59 ----------------------- ft Peak Storage = 4.887 ac-ft MASS BALANCE - (ac-ft) --- --------- + Initial Vol ------------- = .000 + HYG Vol IN = 17.237 - Infiltration = .000 - HYG Vol OUT = 17.222 - Retained Vol = .014 Unrouted Vol = -.000 ac-ft Page 8.04 Event: 100 yr (.000% of Inflow Volume) SIN: E2100202EICO Kimley Horn & Associates Inc PondPack Ver: Compute Time: Date: r WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 2.25 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 6.00 feet in the forebay the sediment shall be removed. BASIN DIAGRAM 75% 0 Permanent Pool El. 391.00 Sediment Removal El. 385.00 25% Sediment Removal El. 388.75 75% ------------ ---- 25% --------------- ------------------------ -------- Bottom El. 383.00 Bottom El. 382.00 FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall. be Page 1 of 2 maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or . replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. . Print name: Al Stewart . Title: Address: Phone: (919) 784-7264 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. . I, , a Notary Publicfior the State of , County of , do hereby certify that personally appeared before me this day, of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires ` Page 2 of 2 Title: L )�-r-- 90tr39 Ou -T (ET' S7 -(Z -Or -vu CIMMF1 Kimley-Horn and Associates, Inc. �)c�ST�►.1!o WET pot -Jo Site Photos Project: Stormwater Analysis Rex Hospital Raleigh, North Carolina Date: Scale: Project No. Appendix: 011274011 ~~a d. o ~ N ~ ~ ~ 2 ~ 7 ~ ' / ~ / ~ 1 / / 1; , , ~ / / A. ~ ~ l , \ `y ~ ~ -7J~`~, i _ ~ , , ~ i a , ~ - NOT ~ ~ ES ~ ~ / ~ , - i ~ ~ ~ ~ ~ i I ~ ''ti - ~ , ~ ..P f ' 1. ALL APPLICABLE PERMITS SHALL BE OBTAINED PRIOR TO CONSTRUCTION. ~ ~ / - _ i ~ ; ^ ~ i r ! - - ~ ~ ~ _ ~ ~ ~ - 1 - - . _ . ' ~ / ~ 1 ~ ; 2. THIS PLAN IS FOR THE PARKING DECK AND STORMWATER POND ONLY. REFER TO PLANS , . / ~ a, ~ . , ~ XIS aN ~ ~ ~ ~ . r _ ' 1 / ; PREPARED BY PIEDMONT LAND DESIGN FOR INFORMATION NOT SHOWN ON THIS PLAN. v ~ ~ ~ a, ~ _ ~ , r y G` ~ ~ ' . -1J C % , / ~ I \ `V ~ 1 ~ 3. POND SHALL HAVE EMERGENCY DRAW DOWN PUMP AS SPECIFlED BY PUMP MANUFACTURER TO ~ / ~ ~ l ~ i ~ ~ I - --SIO f,~H \ EX~~.J1NG' ~ ~ ~ , . ~ ' ~ I ORAWN POND DOWN IN 24 HOURS. ~ ~ , _ ~ , _ ~ / ~ / i ~J? iA TOP = 415.79 P'~~RKIN~. ~E~~ , ~ ~ / - ~ ~ 12" IN - V IN - 405.2a--~ _ ~ , ~ _ , , ~ ~ ~ r , ~ ~ 4. TED C 0 EST ESOURCES A OVED / ~ ~ . , _ ~ 1 ~ , , r \ ~ ~ ~ THE VEGETATED BENCH SHALL BE PLA WITH N F R R PPR RIPARIAN r ' SPECIES PRE-PACKAGED SEEDLINGS OR PLANTINGS AS DIRECTED BY SITE LANDSCAPE ARCHITECT. ~ , . ~ _ ~ ~ _ , , I ~ ,r _ ; , _ ~ , - - i . _ _ - - ~ ti ~ ~ ~ - .ti t - ~ - ~ i~ ~ of ~ ~ ~ ~ r ~ a~ ; ~ , . ~ , _ / a ~ / ~ , ~ _ _ ~I A , ~ ~ V , ~ / i ~ ~ w; ~ ~ ; ~1~ ~ STORM SEWER DATA ~j~ ~ - -P r ~ \ ~I ~ / ~ N ~ r~ ~ - I~ I i ~ ~ TOC CB PIPE OU STRUC. ( ) PIPE OUT w, ' ~ ~ _ ~ I ~ I OR RIM(DI, INV. IN INV. OUT LENGTH MATERIAL SLOPE 1s COMMENTS N0. FES JB F DIA.(IN) ~ . ~ . i ~ ; ~ I,pl . ~ ~ ~ RE,M4vVE EXISTING ICI \ ~ ~ ) (T) ~ ~ ~ , r ~ - T ~ N~ ~ ~ ~ ~ , . ~ S ORM~ D AI AGE ~N is \ s ~ CB-12 411.06 406.33 391.96 66 24 RCP 4.00 TO FES-11 ~ ~ , ~ ~ ~ i~~ ~ A~ ~ : ~ ~ ~ ~ ~ FES-11 391.00 - 391.00 - - - - TO POND - - ~ ~ 41 I , \ \ ~ - YI-10 412.50 - 408.50 66 15 HDPE 1.00 TO DI-9 ~ ' ~ ; ; FUTURE ~ / , Q; ~ ~ ~ _ ~ - - . `A~ \ _ , - _ COU TYARD ! ~ i ~ - \ \ DI-9 413.90 407.84 BY OTHERS - BY OTHERS BY OTHER BY OTHER TO SD BY OTHERS 10 'fit z <; ~ ~ ~ ~ I ~ rr ~ CON TRUCT D:R P INLET DI-,9 - _ _ / i I , ~ ~ ~ ~ , ~ _ ~ , ~ I ~ - _ _ ~I~ ~ Q JB 8 404.50 395.25 395.00 13 24 RCP 1.25 TO JB-7 I~ O' i ~ , ON TORM $EW~R PIPE ~ } JB-7 403.40 394.09 394.00 41 24 RCP 1.25 TO CB-6 ~N r ~ ~ 1 . i ~ / I I - \ / ~ i ~ I ~ r-~ - _ - I I ~ \ / CB-6 401,50 393.49 393.39 113 24 RCP 1.25 TO JB-5 ~I~ CON .TRUCTEO B'Y OTHERS ,o i ~ , I~ ~ m» - ~ I _ l ~ ~„`r a / ~ ~ i ~ f ~ ~ . ~ JB-5 397.50 391.98 391.23 23 24 RCP 1.00 TO FES-4 , ~ , - ~ ~ ~ ~ FES-4 391.00 - 391.00 - - - - TO POND ' ~ _ i ~ ~ t _ , - % I ~ - - ~ ~..~y - _ ~ ' ~ - A I 1 i ~ ~ - ' ~ \ DI-3 409.95 405.09 395.20 110 48 RCP 2.00 TO DI-2 i - 7 ~ , r . _ ~ ~ \ ~ . ~ DI-Z 406.50 393.00 392.31 27 P ~ \ ~ 48 RC 3.00 TO HW-1 - i , HW-1 391.50 - 391.50 - - - - TO POND A ~ l ~ ~ ~ / ~ _ ~ . ~ . i ` ~ i ~ , ~ _ e \ ~ ~ ~ - ` ~ r ~ ~ ~ CB - NCDOT CATCH BASIN STD. 840.02 I. ~ „ ~ I ~ ~ ~ ' ~ DI -CITY OF RALEIGH DROP INLET STD. 30.03 i BASKETBALL ! / ~ ~ `~O ~ ' ~ ~ ' ~ \ FES- FLARED ENO SECTION (MATERIAL TO MATCH CONNECTING PIPE MATERIAL - ~ - O ~ , ) ~ o \ , HW - NCDOT HEADWALL STD. 838.80 ' ~ COUR~ ~ / { \ ~ 1 ~ / i ` ~ ~ ~ ~ . m ~ ; ~ JB - NCDOT JUNCTION BOX STD. 840.31 ~ ~ ~ 1 I ~ , ~ I ~ ~ - - _ ~ ~ ~ / i ! l 1 . . I i / ~ I ~ l ~ ~ ~ 1. ~ ~ ti/ ~ - YI -PLASTIC YARD INLET 1, ~ ~ J ~ ~ '~1~ ~ ~ : RCP -REINFORCED CONCRETE PIPE . ~ I ~ I HDPE -HIGH DENSITY POLYETHELYNE PIPE TWA ~ 7.Q / ~ ! , ~ ~ ' BW ~ 401,'0 ~ I ~ i \ ~ ~ I , - ~ i~1R( G r BTU I:D,IN~ ~ . r , it s 1 X . ~ , \ ~ ~ I ~ r I ~ ~ ~ ~ ~ ST ~~VEh F E ~ 4 ~.d, ~ F 02 I ' .~I ' Q ,l . ~ ~i ~ ; ~ ~ ~ 2ND LEVEL FFE -~,4~~4.0 ~ k ~ ~ ` \ t' , 6' X 6' CONCRETE RISER ~ ~ (I r ~ I ~ i - ~ . , ~ 1 ~ ~ ~ ~ ` I i - ` 1 ~ ~ c , TOP OF DAM (ELEV = 401.0) ~ \ ~ i ~ q 1. ~ ~ q ~ A r i I /a i i i- i 1~ 1~ r ~ ~ i 1~'~ ~ ~ 1 ` . ~ ~y PR T . . , . ~ ~ A - A ~ " ~ > / _ ~ ~ol O ~ ~ ~ ~ ' . ~ ~ ~ ' , TEMPORARY POOL 1 ~ ~ a = m , - ~ ~ ~ - ~i - o ~ ~ !o ~ ~ ~ ~ FF 48 RCP PERMANE T POOL _ i ~ ~ _ I FOREBAY - o Q 3:1 OR FLATTER TW ~ 402.0 ~ - BW = 401.0 ~ ~ ~ j ti, ~ 40 , LF 15~' R P Tq' 1 ST FLQaR ~FE=41 BOTTOM EARTHEN DAM 0 50 , ~ P~ X A ti _ ~ _ ~ 5~ RQ TQ h ~ ~ v : i = 383.0 TT - i / ~ N WA ~ ~ ~ ~ - I , ~ a ~ TW ~ 402.0 i ~ '1 P'ARKI?~~ ~ ECK ROZ E K R F ~ ~ ~ ` ~ \ STONE DISSIPATOR ,r \ . \ \~.ND.F~QQR FFE-430.5 I PAD ON FILTER FABRIC E NG WALL 3RIC - 420.0 ~ ~ ~ ! ~ - ~ Bw _ 401;0 ~ ~ ~ Ap ~ i ; , ~ ( , ~ EI OTC ~ ~ Q~ R TAINT pEC ~ ~ \ . ~ _ DRAWDOWN ORIFICES ~I it - - ~ ~ ~4. ~ \ INV ELEV = 391.0 ~ - ' ~ -.1' ' PCAN F TAI 'a I i ~ , i 0 ~ D L ~ ~ ( ) ~11.~1 I FO p TALCS)` , ~ , -~-m~-m- ti ~o , ' ~ ~ ~ ~ ,R l ~ ~ ~ ~ ~ ~ / EXIST. 48" RCP ~ A ~ ` ' ~ ~ 401:5 ~ ~ DEW ~ ~ ~ ~ ~ CROSS SECTI N ~ , 0 , ~ j _ - ~ ~ / STORMWATER OND SUMMARY .J i a1 ~ , ~ . ~ , , ~ ~ ~ ~ ~ - ~ ~ DOGHOUSE JUNC~IQN ; , ' X ~ POND TYPE: WET ~ S ~ _ r TW 417.0 ~ ~ _ _ _ ~ ~ ~ : _ ~ I a , I ~ BOX ON EXISTING PIPE DRAINAGE AREA: 28.90 ACRES ~ ' REMO. PPE DOWNS R AM ~ ~ ~ ; ~ IMPERVIOUS AREA: 20.98 ACRES ~ _ _ ~ ` _ I j W - 408.0 ~ 1 ~ ~ ~ ~ ~ 4~ ~ _ - ~ ~ ~ _ . r, ~ ~ ~ TW = 407.0 ~ , , ~ , , ~ - ; , .__r ~ ~ ~ ~ \ \ V~ i rt E I ~ ~ ~ ~ ~ ~ ~ ~ : ~ \ SA REQUIRED: 24.045 SF ~ - ~ _ BW = 401.0 ~ ~ r ~ ~ - ~ ~ , . ~ ~ . ~ ~ V ~ ~ ~ ~ ~ ~ SA PROVIDED: 24,093 SF f , . 6 l ~ 1 i r r - ~ d _ ~ ~ , ` ~ / p Q- ~ STORMWATER OND DETAIL ~ ~ f ~ ~ ~ / ~ ~ ~ ~ _ ` \ / / ~ NOT TO SCALE ,C~ _ ~ / r ~ ~ ~ / 3~\\ - - \ \ / _ ~ i ~ ~ ~ ~ - ' j i ~ ~ , ~ 1 . _ 8~ _ ` _ _ ~ ~ ~ ` - ~ ~ ~ ~ ~ i ~ ~ 38 I I - - ~ I ~ . ; - _ _ _ ~ . _ _ - - i ~ , ~ ~ , ~ , i . - , . gt A \ ~ ` ~ _ ~ ~ ~ / 1 ~ ' , I I I I ~ I ~ 6'- ~ ~ . ,k ~ i ~ _ ~ . _..f _.v, ~ ~ _ _ _ ~V \ , ~ l6. b ~ ~ ~ ~ ~ SURVEY LEGEND - r RI RAP APR N ~ ~ ~ ~ ~ ~ ~ - ~ - - ~ ~ ~ \ ~ 7. i ~ P ~ , i ~ r Ea 0 ~ ~ ? ' \ , ' -0\ ~ \ ~ \ ~ ^ SANITARY SEWER AND '4 20'L X - CN ~ ~ ~ 30 W X 24 ~ ~ ~ u ~ ~ STORM DRAINAGE LINES SLiRVEYED ~ ~ T LINES NG~ ~~~RU'EYED / ~ THICK"~ CLASS "I" , r_. , O - ~A ~ ~ ~ ~TD ~ / STRUCTURE INVERT TABLE \ ~ RIGHT-OE-WAY LINES ~ ' ~ = / ~ r , ~ STONE, INV = 391.5 I - . I ~ ' ~ ~ i i ~ i 'r, , ' _ BOTfiO = 383: ~ _ ~ A A ~ ' ~ ~ , , 8 SIRUCNRE 70P INY.N INV.OUT ~ ' ~ _ CC CONTROL CORNER CREST..., y WAL - . . _ i ~ ' I g 393:0.., ~ ~ A ~ d,, _ - ~ Cb-1 417.45 414.25 113.81 PKN P.K. NAIL V~ OV , ~ ~ 'V - ~ r ~ , ~ ~ _ _ - - - O ~ ~6 V ~ o° / CE-2 41A78 40B.SS 408.41 R/'W RIGHT OE WC,,Y ~ A A ~ O ~ ~ ~ _ C8-J 405.22 100.12 399.62 ~ TW = 391..0 _ ~ _ _ ~ ~ ~ ~ _ ~ ~ _ , _ . . _ BAN = 8~.0 ~ ! ~ ~ - - a-s 1'0°01.44 oia~4 DB DEED BOOK ~ ~ ~ ' _ Y ' ~ / ~ ~ 08-6 416.56 411.16 BM BOOK OE MAPS C8-1 121.26 419.!6 415.!6 PG PA%t ~ , ~ RETAINING ALL _ _ \ \ \ \ 'e' 1 41'5,86 ~ i ~ ~ ~ ~ ~ 'p p 41ae6 RCP R~_,NFORCED CONCRETE PIPE (BY OT RS), TYP. ~ ~ ~ _ ~ ~ ~ ~I ~ _ MA1NT-PIA ~ . _ _ _ , _ . ~ - - 15RGj ca-e 124.64 42au 42au CMP CORRUGA~~D M1gETA! PIPE ~ \ ~ \ ~ ~ ,,a~i ce-9 +24.74 420.44 COfTCREfiE RETAINING E NC ~ ~ ` ~ - / C8-10 426.82 421.22 121,42 DIP DUCTILE IRON PIPE , , - ~ ~ COTTA r. 424.22 TL TERRA ' ~ ~ _ , ' ~ RI~R P P i ' ' r I I , , , _ , ..._WAL~ (BY OTHEgS~ , , _ ~ ; ,I ~ ~ A ~ ~ ~ 0 ~ ~ ~ ~-11 4taw PIV POST iNDICATCR 'dALVE \ \ ~ j i 109.ffi 1 ~ \ \ C RB I~J ~ ~ ~ c6-12 42x96 41o.7a 41a7a SS SANITARY SEWER 2 X 2 d i , , _ . _ f1 2 ~ ~ ; r - - - ~ - .5 L X 1 W _ T i - , , _ ' ~ ~ ~ ~ ~ I ~ ~ TOP OS.39 ~ f \ ~-1s ++aas4 EP EDGE OE PAVEMENT 1 _ \ ~ C8-14 43bOS 42b8J 427.93 ~ , ~ I ~ ~ , , _ - _ . , _ - ~ , - _ r THICK CLASS B ; ; ~ ~ ~ _ TW-= 391:0-, _ WET DETENTION. PO(~lD ~ ~ I~~, INV. APPR X. = 398.74 ~ 5~ ~ 4za33 BC BACK QE CURB j I 4" ~ GAN NOT EMOVE TOP ~ ~ 4ns3 C6G CURB AND CUTTER % ~ ~ STONE INV = 391. ~ I , . _ _ _ _ ~ I _ BOTTOM_ EL)_V. _382,0 v / j - ~ Rip t I ~ CB-16 426.62 41842 419.12 , ~ , _ ~ \ ~ i ~ s~~~ ~ ~ T ~ 4ws2 NTS NOT TO ~C~Li= , 40 1 ~ 4zao2 T , r ; , _ _ . _ _ _ , _ PERMANENT P.OOI, a 391,Q__ , , _ \ EXI ING ~ ~ ~ ~ i, _ ~ ~ a ~ 1/ / ~ a-16 426.p6 42ass 420.ee SIPS IRDN PIPE SE _ / 1 ~ a-v 426.79 421..78 o EXISTING SRO{v PIPE f'~ , , _ - f a T ` __r ~ . LT L.L[~R,.-iITI ~IL ~.~w~:.3J,-~-~ I I GP / ~ ~ a-1a 435.z2 430.22 4so.n ~ \ \ ! , CB-19 444.11 436.75 436.79 ~ GOMPUTEG POINT _ _ _ _ 2-YEAR _DHWL = 39fi.D i _ I EN6_ WACC 2__ , ; _ ~ / ~ ~ _ ce-2o 444,+12 44x92 ?o EXISTING CONCRETE MONUMENT / i ~ ~ ~ ~ I, ~ ~ ; ; ~ 1.0~-YEAR.--DH _ r r / ~ ~ - 3~3. Q , ~ . - - , ,WL 39-7.42._ , . ~ - ~ ~ CB-21 411.03 416.35 444.1) _ ~ ~ - CB-]2 451.77 416.17 • ~ - / ~ CB / 4~ 451.82 4<SJ2 ~ FIRE HYDRANT RIP RAP APRON - , I , ; _ . WATER F.EATI~RE _ _ _ r ~ 15' ~ 451.n ® WATER VALVE ' _ ; \ v/\ / O , ~ a-2, 453.63 446.23 ,46.03 a WATER METER ~ ~ sLxlowxl2 ~ ~ - -15"RCP ~ ++6.as B ~ 4+e~3 c CAS METER _ , / CB-29 45276 44D.26 M916 THlcw~ CLASS A , ~ ~ ~ ~ i i l ® ~ 4wae j GAS ~r~...E TW = 403.0 , y c6-26 46aa 449.29 4W.09 _ . , ~ STUIVE, INV = 31.0 ~ ~ ~ _ _ _ - I , , . _ a-n ss.3s 11o.u _ , _ - Bw = 3s~.o . - - ~ ~H - a-m sba a2~ 45219 V ` + MANHOLE , i 1 ~ ce-28 437.07 42x77 42x71 J , _ I_ . _ ~ _ RECONSTRUCT r ' " ~ CB-b 437.26 421.fi8 425 ~ y ~ j RECONSTRUCT, ~ ~ ~ a-s~ 420.60 4za+o 4za.+o ~'B cATrH q~IN . , V A _ a-1? ++a~ 137.69 4sz~ CI CURB INLET ~ _ r EXf`fING CATCH i - _ , ~ ~ _ e _ _ - _ 6-- - , EXISTING y ~ BASIN CB-1 ~ ; i ~ \l A ~ ~ ~ CB-33 410.00 411.0 441.00 DI DRCP INLET r = V ~ 416.10 , RETAINING WAL CB-34 446.84 44571 145.74 D FLARED END SECTION ' CURB INL - i ~ ~ ~ / TOP=411.06 i \ 39Q _ ~ 1 ~ ' . \ ~ , ~ , ca-3s 450.x1 44aa6 ~ ROWER POSE CURB I L~T / INV IN=40 3 ~ . _ _ - _ _ ~ _ ~ ~ E , roP~415.86 ~ ; , / ~ INV ouraos.a ~ ~ ~ XTEND _EXISTING` - VEGE TW`~ 401.0 ` ~ j a-36 411.74 u1.24 447.24 LIGHT POLE ' -6HR~INLET A ~ ~ ca-s7 u4.a2 445,22 4u.az ~ , FATED _ _ - - It~V IN=409.80 ~ , V B~NCH. _ ~ ~ - ~ ~ BB)N'= 391.0 = ~ ~ ~ ~ ~ T a-3e 46i.c2 416sz 446s2 TOP .45 / ~ ca-39 467.53 Laos uzee N GUY WIRE - STAINING WALC _ ~ _ . _ 1 1NV OUT=409.80 ~ ~ - t ~ ~ _ ~r~r~~ I ~ - _ j ~ _ ~ - 1~ - - - _ 15" RCP INU IN 400.22 ` ~ ~ ~ ~ ce-w 157.99 ~0.w 430.14 -9-. SIGN ! ~ ~ ~ ~ 460.99 iMH TELEPHONE MANHCLE _ 1B" R~ INV. '4 - :400.20 ~ . A~ ~ 460.09 _ ti - r - ~ _ _ \ ~ 0 \ I, a-41 451.02 41au - eorrorl a7 eox ErtN ELECTRIC 1~1ANHOLE 9 I ~ C8-12 163.48 4sate w'MN WATER MaNFiOLE ~ / _ -1` t ~ EXI~T~NG~. RETAINING- _ ~ ~ ! ~ %P TW 411.0 ~ fi~; ~ 407.b - ~ ~ _ I XISTING OUTLET Cud I_ ` • i ~ ~ ; A 4u °16 4,9.9e - eorm i ac eoz LE1` ~ SMH STORM M'~NHOLE ' - CB-46 412.36 448.81 446.75 5 ~ ~ ~ ~ " R ~ ~ ~ - ~ - _ _ ~ _ , WALL, TYP. _ ~ ; ~ ' BWi= 40$.0.__..._... - BW_ 401.• _ . - ~ _ c . { _ I _ -~s. _ ~ STRUCTURE Tq,., - _ - - - - .~~°s~ R 40niv.8= i ~ I ! ~ 450.35 ~ ~ x:rl _ ~ 1 .M F " A 4a o , i I ce-+e ~+.oz ~7 +16.92 ~ I I 440.12 ~ T E ~ . -~~DETAIL ~ ~ , ~ ~ ~ I I - ~ ce-47 430.06 427.15 427.06 ~.r i I I \ ~ 311.44 427.39 44x. 3 e TOP - 41017' SHRUB INV. IN - 399. 6' ce-x 440.90 43416 434.10 C9-51 450.16 436.16 438.16 REMOVE AND`RECONSTRUCT CUR INLET EXISTING STORM PIPE MH ~Y INV. OUT - 399. 9' CB-52 43.&84 42&19 42&09 - \ CB-33 42165 41115 413.16 -ss ss- ;AN I TAf?Y SEWER P I r'E~ TOP=4T 3.19 _ ly/ INV IN=408.53 i , - TOP - 400.62' - i _ - - A TOP \400,33' ce-s4 414.15 4OC75 x.75 DR A f P 1Y - - . - a-1 43134 {2834 414.34 - R A I N A E_ P 1 ES _ ~ \ I V. IN - 39e3.12 \ INV 0 T=4D8.49 J i INV. IN - - 390 r 4'14.34 X-X FENCES INVV IN 392,.85 a-2 437.00 426.80 r INV. OUT -3J0.42' V INV. OUT\- 39 .71' Y V A q-4 437..337 443337 433.37 - - OVC~RNEAD UTIL[ IY" LINES \ \ ~1 a-5 452 n 44721 ~ F T T ~ - F,1 HYDRAN .6 45286 460.79 0. \ 0.-7 451.49 440.10 RCP - PE I NF ORLE J I:ONCREi TE P 1PE \ \ \ \ 01-8 420.63 41193 41243 a-9 41895 412.45 412.35 _ , - - - - - - - ` \ LMP LDPRi GAT D Mt TAI PIPE G s P Dl, it k -7.N r PE S111H {22.52 409.82 409.42 w 1p- - s 1 - SEW E - SHNIiARY SEWER CLEANCOi ' \ \ \ sTMH 2 ,00.42 48249 +46.79 - BOTTOM OF 80.01 I / CURB" INLET - - EXISTING / , - ToP=400,59= _~L SS - SANITARY EWER ssm-a 42790 4146+ 413.30 \ \ \ \ - 41138 R = ~ s 445.43 E T ET A. I N 1 , N r 66431+-14 45194 \ \ SSMH-1.s 454.27 448.65 443.57 44&46 _~L - ES =FLARED E~"0.D CECTI [IN PROPER INV OUT 391.12 - - P i ! \ /7- F \ \ \ Iss~+-16 456.43 447.02 44178 N V= INVERT . / LINE, - - - ~ A SSMH-17 450.12 442= +4216 ~ , ~ MH _ - MANHOLE A \ \ V A A \ SSMH-18 444.70 441M 441.4e ~o ssw1+-19 443.67 440.43 426.66 PP POWER POLE 417.00. 6 9 / 192.821-1 - - % r CONCRETE - - St 01 32 4 VIA _ -All v U' 61 S 02 ~0 51 E 39 J BAL_ARD L GHT POST M HA 7 a AREA LiGN S 4,8 05 W rl A CO L L rd N STDRM-- STORM DRAIN ----GAS GAS I_ I NF- E; EC UNDERGREUND ELECTRIC LINE ss SANITARY SEWER LINE GRAPHIC SCALE T H20 WATER ~TNE YAGNMIC 20, 0 10 20 40 60 ------~T--- UNDERGRIli1ND 'El_EPHONE L [NE ( IN FEET ) 1 inch = 20 [t. PRELIMINARY NOT FOR CONSTRUCTION PREPARED IN THE OFFICE OF: CLIENT: CLIENT: \\tpuuui//// DATE: PROJECT: CAR / 1-28-04 ¦ REX HOSPITAL H TAL SCALE: 1.C ~ - Q - 20r l f MOB AND PARKING GARAGE VERTICAL SCALE: NA TITLE: REV. Na.: REVISION: DATE: DRAWN BY: CHECKED BY. MF1 C:= and Associates, Inc. TITLE: ` DRAWN BY: JNG EXPANSION (PHASE 1) This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. P.O. BOX 33068 - RALEIGIH, NORTH CAROLINA 27636-3068 Copyright Kimley-Horn and Associates, Inc., 2004 PHONE: (99) 677-2000 FAX: (919) 677-2050 GRADING AND DRAINAGE PLAN ~J •~p INE,~;.'(~~ DESIGNED BY: JNG K. ATTACHED REFERENCE FILES: JOB NUMBER. SHEET NUMBER: 1/ifIIII%%!\\\ CHECKED BY. 274011-B01.DWG SEAL: HKB 274011-Bo2.DM 011274011 C7.-2 OF 6 J6 I I -I-- ~ S ' TYPE A LOCATION OF TYPICAL PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL SO' MIN. 6„ 2, 0„ SPOT ELEVATION (ADD euT suFTICIEHT To KEEP 2'_0" 6" FOR TOP OF CURB) J ~D"E"TON~'E F 1/2„ R LE T SIDE 11• y , A A ~ -1 T , Sda LY^ , d w •#Ir2"-s STONE ro aE usED 2s• aR wrnN of SEE DETAIL ( ) "CATCH" GUTTER E%ISTNG gsuROE sraFE oR RAluto, t PROPOSED STREET, ~ RCADrYLY ~B- • rAKHEVt7t IS ~ ~ A"'~'A 3'T~ NOTES: 3R r W ~ ~ ALAN vlEw (1) d = 1.5 71ME5 THE MAXIMUM STONE 6" a. r'S+-~ d OATS TYPE PWIiING RATE La DIAMETER BUT NOi LESS THAN 6 1NCNES. i' ~ - ,~J K/ I r' i 1D -Nov 1 Tdl F~ J00 I~ ocn (2) d r' ABOVE MaxIMUM iAILwATER ' '4W / OR TOP OF CHANNEL BANK (WHICH- r r~ ~ ~ ~ ~ ~ a d , { / J < ` < ~ dd. ; i Mar 1 - Ma 1 TaA FerWr J00 Iht/acro EvER IS LESS). n i ~ R AbnuQi Rye 25 16r/aar I ~ Fes a~ ac d I a ] " Mpr 1 - !pr 15 Toll FeraN 300 M/aro roonNC - s¢ Non: r / / r BOLT INTO ~ ti , CONCRETE 6" ~:a L a d ~ - ~ I (3) La =LENGTH OF RIPRAP APRON. da . a r ~ ~ , ~ . ~ BOX, TYP. ~ a o Apr IS -Jun JO HuMd Carnal 8amudagrar 2S b/ocn sECnw A-A I NElI CONSTRUCTION Jul 1 - Arp 15 Tol Frrcw aq 120 IW/OCro r i rr•Brorntop MEkt 35 Ihe/aae S5 MM. IB NI4 i IE sTaxE wA> a. PRONOE c, mExnLE uxoEAUNETA aA NEW 2 X 3 EXISTING 14" ' ROTATE SPILL EzISTING ROADwnY rror Soghum-Sudan Nybrldrt JO I~/sae a' (ax.) p1 wesxEO sTa+E eEOOlxc IAArEAIAL. i NOTES: FOOLING SIZE OPENING - % A R DI METE ; GUTTER TO MATCH ADJACENT F1aE sl2E x+orx osvrn Ir Mw. ~ i $IopN (3:1 to 21) 6' MIN. ' OPENING PAVEMENT SLOPE - ~ J~/ ~ I IS' - N" 8' 12' Y~ zn" - de' 1Y 24' ~ MOr i - Jun i Serka Lerpedem (rCOnY'Nd) ~ ~t/OGro I TYPE B "'6" - 5E• 16' a6' ~i 'A/j ~ I ~ PIPE OUTLET TO WELL- DEFINED CHANNEL r r r I i EXISTING ~ r ~ 30,. FABRIC UNDER STONE Mot 1 - 15 Add TaE frraw 120 acro ~ 1.5 DIAMETER - r ' (Mot i -Jun 30) Or Add wapinq lavpran 10 IEr/arn o~~ FRONT SIDE 48 RCPry OPENING, INV=391.0 ; CR055 SECTION Moe 1 -Jun 30 Or Add Hulled Canmon Brmwd 2S Ibs oar o~ ~o `cb~o ~ ( ) ~ / ~ Jun 1 - 5p 1 1enal Parcae and 120 la/aro ° o 0 A SECTI0~1. 30 CURB i U R~ A I V D ~ U TT ~ R r•~EM NINt 35 acro , S, o OP a l Teter Sorghum-Sudon Hybrids 30 Itn/ocre ° e aANNa eorrw 'I. i NOTES: I Sw 1 - Mr i Series Leepedem (Inhulled-urgean7ied) 70 Ibt/aero I d ~ aAO o _ - 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP alld TWI FeraN 120 Ar/Oar ~ p o ' - TO ENSURE CONSTRUCTION ENTRANCE IS USED. - a~ o ' NEW 2'X3' (Nov 1 - Ya 1) Add Abna:i Rye 2S lDt/afro o moo o>~ 2. IF CONSTRUCTION IXJ THE SITES ARE SUCH THAI ~®OQ' OPENING d TH MU IS N T R M V Y TH V HI TRAV - - ~ vLAx Hex ° E D 0 E 0 ED B E E CLE EL LNG OVER THE STONE, THEN THE TIRES OF THE I ~ La VEHICLES MUST BE WASHED BEFORE EN IERING THE " PUBLIC ROAD. . i j CansuN Conrervati0n Engineer a Shc ColMrnaUon Savior for 3. IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS ~ Odd11rRM MdOflllotkn aaKernhp 011Nf ORrNMltlwr fp vrgkotkn Of I ON TO THE PUBUC ROAD, THE GOVERNING AUTHORITY I 20" X 20" EXISTING ORIFICE PLATE DETAIL ~ 8"~ `NLL GLEAN THE AREA AND INVOICE THE F]NANCI0.LLY "'i ~ drnu111 O/rOr. TM ODOYr refer Oro lhorr rlLkh do Moll undo RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL ~ RIGHT SIDE METAL PLATE ~ CONCRETE ~8 MAX. RESPaNSIBIUrY FGRM. ~ ~ kcal OIIMdoEM: other aM'inq roU eanbinaUar aro poaDN, 6 CITY of RALEIGH II GTY Of RALEIpI (SEE DETAIL) TOP VIEW RISER BOX CENTRAL ENGyNEERING DEPARTMENT ! raTNlNaory - Reseed aeeoMYlq t0 optimum reason fa desired permanent ~ CENTRAL ENGIIEERIIGG DEPARTMENT wgrlrlMn. Do rat dkw trnporary cover to grwr awe 1Y in hdght beforo sECna+e-e REVISIONS oArE. onrE oaanW er, DRANK ~ I r fEM/ A maie0, afhrrrirt Tescw may t» rhodrd ouR I CONSTRUCTION ~~TT VARIABLE CURB ENTRANCE i IP sraLe ou.> e'. vAOhoE cEOTExnLE urtcALnEA av d' (111N) js1 NA4EO STOLE BEOaNC YAIERILL PROTEC IIV~~ SEE SECTIONS 6' SEEDING SCHEDULE srv. a loa (REVISED: 1-1-BB) sTD.B 4D.2T ' ~ ; I A 10'-0 MAX. . _ _ EXISTING - BETWEEN JOINTS ~ CONCRETE RISER BOX ; EXISTING CONCRETE STORM GRAIN , INLET PROTECTION 1 n j ! 1 I 3 ~ 3' ~ RETAINING WALL, TYP. ~ i a ~ FRONT 1IIEW: 30 CURB CURB AND GUTTER ~ I 1 DEflNI110N ~ ; I i o A SEgMENT RTER OR AN EKCAVATED IMPOUrpiC AREA AROUND A STORM ORAe! NEW 2 X 3 DROP INLET, CURB MLET, OR PTE NVc"ItT. ~ 1 OPENING 4 2 , PURPOSE ~ awss r Ala AAV(sEE sacra, rHAU ensN eaew) TO PREVENT SEDWENT FROM ENIEWIG STORK DRAINAGE SYSTEMS PRIOR TD ~ ~I 2qr / , 1.) CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES ~ ~ ~ I PERMANENT STABILIZATION OF TFE DISTURBED AREA. DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. ~ ! \ I IP AAP HEADWALL coNDrnoNS WHERE PRACncE APPLIES ~ 'alai j 2.} RIP THE ENTIRE AREA TO 6 INCHES DEPTH. ~ , NT O ES' MERE STORK l1RAI1 INlE1S ARE TO lE MADE OPERATIONAL BffORE PERMANENT i~ STABIUTATIIN OF THE dSNRBED AREA. DIFEROfT TYPES OF STRUCTURES ARE AP- 3.} REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS ' / ~ ~ '~i,~~~ " ~ ALL CONCRETE USED IN CURB AND GUTTER SHALL BE M H A MINIMUM 4 P I. I R1CA~E ~ D~E~T LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. ~ seoHeNrsr~~p~llUlllllll wA o STONE. r n+a x r wa MIN. ~ S LL BE ,000 S ~ AAA ~ ~ SAME INVERT ~ ~ AS EXISTING 4.) APPLY AGRICULTURAL LIME, FERTILIZER AND SUPERPHOSPHATE / e _ UNIFORMLY AND MIX WITH SOIL (SEE BELOW /I ~ I I 1 a2 WHERE 'CATCH GUTTER TRANSITIONS TO SPILL GU iiER ~ OPENING ON ~ ~ TRANSITION CENTERED ON THE TRANSITION POINT SHOWN SPILL GU TIER (AND VICE VERSA CONSTRUCT A 5 FOOT SILT FENCE DROP INLET SEDIMENT FlLTER ~ ~ POINT SHOWN ON THE PLANS. HOLD LINE AND GRADE OF A. v.v. RESSTANT (BUaq cEOTExn.E OR EpAV. FABRIC CUT FROM A S.) CONi1NUE TILLAGE UNTiL AWELL-PULVERIZED, FIRM FRONT SIDE TOP OF CURB, ROTATING GUTTER AROUND FLOWLINE. FLOWLINE. cDNnNUaus RDLL TD MINIMIZE JDINTS (MUST HAVE AT LEAST I) . REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 61NCHE5 DEEP. - ~ - ~ ~ 3 1 ~2° EXPANSION JOINT EVERY 90'. B. STAKES SHALL BE TREATED 2"x 4", 2'x 2' OAK, DR EWIV. METAL i PERSPECTIVE VIEW WITH A MINIMUM LENGTH of a o FEET. ~ 6. SEED ON A FRESHLY PREPARED SEEDBED AND ' NG SCALE tl9g` COVER SEEDING. atAV£L s aro AAa PLrEA eEAN eApN GEraIL c. STAPLES sHau BE of HEAVY DurY WRE AT LEAST I/2- INCHES LDNC. SEED ! I'~HTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER Is GESwEO ro PAOrea EWSnxe Plr~ INVERTS D. STAKES SHALL BE SPACED AROUND THE PERIMETER OF THE INLET A naT DRAIN w AcAES aA LESS. ' I ®LIQUID MEMBRANE CURING COMPOUND SHALL MEET Trit F M T THi RE UREMENTS OF SECTION 1026- F N T MAXIMUM OF THREE FEET APART AND SECURELY DRIVEN INTO THE GROUND ] M IMM A Y N A AN H R M _L EE Q 2 0 CDO (MINIMUM of LD FoaT~. ) ULCH EDI TEL AFTER SEEq G ND C 0 ULCH. STANDARDS & SPECIFICATIONS FOR ROADS AND STRUCTI AND STRUG TU RES. ~ E. A TRENCH SHALL BE EXCAVATED APPROX. 4" WIDE AND 4" DEEP ~ ~ AAUS ra ec olsnAaco sEUIUENr sroAAa: vlr~lrrvEAr ale, FILL, Era FL000 SrOAAGE ZONE PoP AAP HEADWALL ARDUND THE DursIDE PERIMETER of THE STAKES, I B. INSPECT ALL SEEDED AREAS AND MAKE NECESSARYREPAIRS OR 1I 1 , EXISTING - - _ - ~AL~ CC~'JST ~ ~ _ _ - -LED WITH JGI~, ) NA NRAL .D WI IH JGC. ' - ~ r'~/~~'- - -~'2 GAUGE WIRE, a'x a° DA d-x 2" RESEEOJNGS WITHIN THE PLANTING SEASON, AF POSSIBLE ~ e ~ N~Falw 1 " EXISTING 48 RCP ~ NCDOT ROADWAY STANDARD DETAIL 846.07. WIRE AND FABRIC SHALL BE STAPLED rD THE wooDEN STAKES STAND SHOULD BE OVER 60X DAMAGED, REESTABUSHFOUAWING ~ 'tow ~ I s j (FABRIC FASTENED TO THE WIRE Ai THE TOP WTH N1RE TIES) ~ i. sass 1 my-Am PLIEA FA&VIG 48 RGP i WITH s" GF THE FABRIC AND a° of THE WIRE ExrENDwc INTO ORIGINAL LIME' FERTILIZER AND SEEDING RATES' xNUpM°ACC"EPEA,~ ~1 N<sNEO sra,E THE TRENCH. THE HEIGHT OF THE FILTER BARRIER SHALL BE ~ UNLESS orxERxlsE uAx. sewvENr oEPnr(aEAx ar aaxq ~ ~ ~ Is' MIN. AND Nor EXCEED re' 9. CONSULT CONVERSATKNJ INSPECTOR ON MAINTENANCE TREATMENT xorEo G, LHE TRENCH SHALL BE BACKFIELD WITH SOIL COMPACTED OR } , 1 AND FERTIUZATKIN AFTER PERMANENT COVER IS ESTABLISHED. ORIFICE PLATE ~ n _ SEE DETAIL ~ ~ cNUSHED sroNE ovER 1HE FABRIC. ~ SECTION THRU BASIN, FILTER AND CULVERT PIPE j NO SCALE 1 ~ ) II ~ 'APPLY: AGRICULTURAL LIMESTONE - 2 TONS/ ACRES (3 TONS/ STAKES DROP INLET WITH GRATE i ACRE IN CUY SOILS) ; ~ THREE 3 EXISTING ~ NOT TO SCALE O WIRE ' FERTILIZER - 1,000 Iba. /ACRE -10-10-10 (EXISTING PIPE INVERTS) 14" ORIFICE OPENINGS - , I I SUPERPHOSPHATE- 500 Ibs> /ACRE -207 ANALYSIS FILTER FABRIC N07ES i MULCH -2 TONS /ACRE -SMALL GRAIN STRAW 1 WITH PLATE FOR , . ~a sxEET ar ovEAL,wo ELaws ~ I _ _ _ . a+LV caouxo sLOVE xor ro I ~ ANOTHER -ASPHALT EMULSKNJ 0 300 GALS./ ACRE ExOEEO ex NAx. o.A. - (3) 1.5" ORIFICES ~ ~ a ~ ~ _ SEDIMENT LADEN RUNOFF Ate. 1 Aa+E I i p. 011Y GF RAIDpI GY1Y Of RALEIpI i LEI/TRAL EAC/IEERNC DEPARTMENT I CENTRAL EAICWEERIfG DEPARTMENT . t m i I ~ ~ m FILTERED WATER i STORM GRAIN I I GRAVEL ES RIP RAP 1 11 ,l , 8UR]ED WIRE & FILTER FABRIC INLET ~ } HORSESHOE PROTECTION ' i INLET BASIN I i f I ~ I ' srn. r las/ STD. 11,11 i SEEDBED PREPARATION T I VI W RI HT SID VI W FRON 1/2" EXPANSION JOINT 1/2" CONTROL JOINT I f I f BROOM FINISH CONC SURFACE z AREA INSIDE OF TOOLED EDGE J ~ TO CREATE PICTURE FRAME EFFECT I W W i NOT TO SCALE 1 I (n~ ~ I ~ ~ i QQ i ~ ~ i ow 5'-D" TYPICAL w? BROOM FINISH CONC SURFACE SMOOTH TOOLED FINISH a o AREA INSIDE OF TOOLED EDGE AROUND ALL EDGES, TYP i I Q TO CREATE PICTURE FRAME EFFECT UZ i 0 ~ I Z~ Qa 6"x6"x6 GUAGE z~ 3000 PSI COMPRESSIVE WELDED WIRE FABRIC SEE SITE PLAN = STRENGTH CONCRETE FOR DIMENSION Qo i z 3„ 4„ 3„ 2„ ~ ~ Q 1 /4"/Fr 2 2 1 CROSS SLOPE 1" i a d A ~ _ d A ° d ~ ° d ~ A 1 2" PREMOLDED 1/2" CONTROL JOINT EXPANSION JOINT FILLER, I~ ALL EDGES SQUARE. PA I N TNT NTR TNT TI EX NS 0 JO CO OL JO SEC ON N F OT OR CONSTRUCTION I r NOT TO SCALE Z 0 E Om 101E ZO O GENERAL NOTES: Z m FRAME ORATE AND HOOD M V S H Hp4 y SACK OF CURB NO. 540.03 0 USE CLASS "B" CONCRETE THROUGHOUT. cc F Q EXPANSION JOINT Q X 1'-O„ PROVIDE ALL CATCH BASING OVER 3'-S" IN DEPTH WITH STEPS 12" Q I r4 -1 6" A 6„ OPTIONAL MANHOLE N F a6 T. ~ < = Co p Q C S" E 4'-8" 4'•8" Q H ` y , O ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.°8. Q 3 , W1 (FT 0 NOTES: Q ~ • Z E GENERAL NOTES: Z C/) O 0 8" ' THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING Z ~H O Q ti y F4 a 1~.) f+ CD . r p -11-4 Co y 8„ CHAMFER ALL EXPOSED CORNERS I". LL J O CD m O STANDARDS: 838.21, 838.27, 838.33 AND 838.39, w J a r4 = 10 z;5 H V T. co) y 1-1 = V M N '11 TOP ELEVATION OPTIONAL CONSTRUCTION • MONOLITHIC POUR, 2" KEYWAY, OR 04 BAR DOWELS AT FZ•1 ¢ C) O O 1 e„ all (L J Oy O -1 12 CENTERS AS DIRECTED BY THE ENGINEER. LL J O 1,y LL JaM= mZ = -I W4 BARB "V" 9 840.00 FAME J S Z mz =-H Y y d 2 M Z S O O CL Z r- D USE CLASS "B" CONCRETE THROUGHOUT. Z= D ' INSTALL PRECAST ENOWALLS WITH WINGS AND PAY 00,55= M L.- y DON= M D - - USE FOAMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. OOy= O O co = r4 -4 E AL SPACES GRATE a HOOD T¢, _ _ W p o n m 1 x 1 n W Q LL= O O T C•3 m A IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB W Q LL H U O= = T z D 3,r H 0 Tq, O T Z m 3° c~. B AS SHOWN ON STD. NO. 840.00. H U O= 7g, ~ ~ ~ CD X 1 FOR IN ACCORDANCE WITH SPECIFICATION SECTION 888 W 'ZJ L4 =O?nIj - - _ _ OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY OR W W= 2 D D X - F U O - Z USE 4000 PSI CONCRETE. ~ a C Zy _ D \ p 04 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. Q y1.0" 1'-0" , a N N r H =0000 PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTY AB1° H = i S D ID o 4= \ i F- N Q Ile H = W Z M •D 9 \ H = ~ Z W.M 9j o. 8" 8" x USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. F _ ~ Z W =C@50 - - m m 'r T y~ USE FORME TO CONSTRUCT THE BOTTOM BLAB. N S Z w z H,.H r -1 is W Z N k> m y H O O w FOR GRADE 80 AND WELDED WIRE FABRIC CONFORMING LL 1 H O A M / LL mom I~ LL IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, p: M C) O S Z 9 - TO ASTN A185 WITH 2" MIN. CLEARANCE. p O y O LL p O r4 N LL O0 J N.R o,'. " a 8" l4 FOR 8'-0" IN HEIGHT OR LESS USE 8" WALLS AND BOTTOM SLAB. OVER N F u- O " - O a. o. q 0 8'-0" TO 18' O" IN HEIGHT USE S" WALLS AND BOTTOM BLAB. ADJUST Cr O O W - n Z n, m iN , w O co zz QUANTITIES ACCORDINGLY. n 2 T ADD TO BASE AS SHOWN ON STANDARD NO. 840.00. O y -H , ?4 D - - y - - 2 "F4 D D o PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH Z z ,wDD > > I~ e'•a" z DD z ,r1 D R - R m PLAN CONSTRUCT WITH PIPE CAOFM9 MATCHING. F.1 {-D4 _ PROVIDE ALL JUNCTION BOXES OVER 3'-8" IN DEPTH WITH STEPS ?-H <N H2 HZ . OSHA STANDARD 1928.704. aQ w , - 12" ON CENTERS IN ACCORDANCE WITH STO. NO. 840.8°. W O yO CS/RCP PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY W yp 3„ p Z H1 H1 CONTRACTOR G W C fn C 1 m m LL CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES W O O ' PLAN X SEE NOTE CHAMFER ALL EXPOSED CORNERS 1". W O IS3 Z ADJUST THE STEEL, CONCRETE AND BRICK MASONRY QUANTITIES 111 1 -LL ^ TO INCLUDE THE ADDITION OF THE MANHOLE (I.E. DIAGONAL BARB " ALL ELEMENTS PRECAST TO MEET ABTM C913. a a DRAWING NOT TO SCALE. ' O z L o TOP z TOP ELEVATION SECTION X -X C3 - , x w 9° m w ELEV• EXPANSION JOINT-7 o m USE FLAT m Y BEE STANDARD 840.54 SHORTENED AROUND OPENING IN TOP SLAB, ADDITIONAL VARIABLE m1 - WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR FOR MANHOLE COVER i FRAME Y4 "A" HEIGHT BRICK MASONRY, OPENING IN TOP SLAB,) y - - - - AS LONG AS THE SAME AREA OF STEEL IS PROVIDED. m m m m GRADES 2% AND UNDER TOP ELEVATION PLAN OPTIONAL SPADED 8 - - - - - - - -0" C. TO C. MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP - " CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1". BRICK MAY BE USED ELEVATION 18 12 FEET. T FAME GRATE AND HOOD STEPS • STD. NO. 840.88 DEPRESSED GUTTER LINE SEE STO.ND. 840. STEPS • STD. NO. 840.88 03 TO ADJUST FRAME i O.C.(TYP.) 6" 8" O,C.(TYP.) 8" COVER TO SURFACE L REFER TO CHART 3'•0"I 9' 0" 11-0" S EXPANSION JOINT M~A ELEVATION MAX. 1' -n REFER TO CHART FOR BAR SIZE 0 FOR BAR SIZE NOTE: THE MINIMUM BAR SIZE SHALL BE R6 BARS J v r R4 BAR _ = V TN AT 8" CTS.THE CONTRACTOR WILL HAVE THE OPTION , = PLAN OF TOP SLAB SECTION S-S TDP ELEVATION. - J m ¢ m ° x z ELEVATION p z _ - - 0 2 0 x N = z ELEVATION SIDE TO INCREASE THIS BAR SIZE AS NEEDED. J e 00 14 ILO.. ZMG) Z Q p o o °d °L A LL J° G) NORMAL CURB AND GUTTER ON LIGHT GRADES r u• N Or L. Z N OUTLET PIPE m J 0 F4 Z N O y ° N Z O Lu = N O = M .a9 B B" ° Ey B. O y 2 s fA Z LU r N 8x o ' E- Z 0 NORMAL GUTTER LINE i w 1A2 " EORF " =(L m y Z 3C W a - - W ro = m W A I 6+~ M a N '4 ENDWALL DIMENSIONS 0. -11 7 O INLET PIPE SECTION - _ H Z N , EXPANSION JOINT 8„ M m a 8 x M m d W W S" E WB "W" BARS W4 BAR 8 w m TA C w Q n ' 111 N TDP a m SECTION Y-Y B^ Q MIN./MAX. MIN./MAX. MIN./MAX. 2 -1 '4 -1 v ES VCR 2% ELEV. - 't o . cc 'j 04 BARS "Y" USE ON GRAD C = m D e^ D G W a = m Z B EQUAL SPACE p O V -H M Z ° C-C OR D-D DOWEL O v J _ D Z W2 (FT.) FT. MINIMUM MIN./MAX. MIN./MAX. _ i a ~ C. O SECTION X-X c z a o Z D PIPE DIA.; BAR SIZE HI (FT.) H2(FT.) D (FT.) W1 W2 O W C4 W n C O D - 1U' - BEO DEPRESSED GUTTER LINE Q Lo C 0 D= RISER HT. all '1F O C O O D aZ 1.0 W5 @ 8" 1,2512.00 2.0013,75 1,2511.75 3,0013.75 5.5018.00 Q r Z Q p N v O ~ m l DIMENSIONS AND QUANTITIES FOR CONCRETE JUNCTION BOXES D O 7 1.25,2.00 3.0013.75 1.2512.00 O Q w TJ1 _ EXPANSION JOINT Q V O 30 m p VARIES 1 •0 all .v; Q V 04 11~~ "U z z n p 1" W I C p Bx SEE NOTE a R D Z O ¢ r 1.2_5 W5 @ B" - 3,50/3.75 j 8.50/6.75 Z S 01 ro Ill Cf -1 DIMENSIONS OF BOX AND PIPE REINFORCEMENT TOP BLAB CUBIC YARDS TOTAL QUANTITIES DEDUCTIONS FOR ONE f = C7 y BARS " F Q F SECTION J-J Q W= F = D DOWEL ELEVATION y f' _ ^ Pe WHERE 90' TO" rlFe Is USED PIPE SPAN 9 M = 1.50 W5 @ 8" 1.25/2.00 3.00/4.25 1.5012.50 3,50/3.75 6.5016.75 A" DIMENSIONS IN BOX BOX AND SLABS PIPE W YDS. D V WIDTH HEIGHT H W CL 'Ti t„I 8" > C4 /2.50 4.00/4.75 1.7512.50 4.00/4.25 7.5018.25 CO) D y ~ O y m T 2.0 N5 @ 8" 1.50 J 8" TOP BOTTOM I91L1 LOS. CU. YDS. W = N M = H 1 i Z O ' D A B N ND ~ " X . LENGTH E F y f>, g SECTION R-R NORMAL CURB AND GUTTER ON STEEP GRADES N W SECTION M-M W1r 113 M = WHERE 42" TO 54" PIPE IS USED = N _ = Z EXP. JOINT , - Z SLAB SLAB R. UHT. REINF MIN, "H" c.s. R.c. x - Z Z I D _ 2.5 i N5 @. 8' 2.50/3.50 4.00/6.00 12.00/3.00 4.50/5.5 l0 0.00/11.50 w y y - - - - - O V w ~ ~ I co W m z y v m M Z WHERE 30" TO 38" PIPE I8 USED ic y M H J y p MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN (BASED ON YIN. HEIGHT, H. WITH NO AIBER " 1..1 = (A G'1 RISEN HT. DIMENSIONS OF BOX AND PIPE COVER W. YDS. CONC. IN BO DEDUCTIONS J O M VARIES J O T' O 2" 2'-0" 2'-0" 2'•3" 12 2'-9" 3'-0" 9'•0" 0.187 0.187 0.186 22 0.730 0.018 0.024 D 1 ~ of W 11" 9 J Z 3 0 3.0 M5 @ 8" 3.00!3.50 5.00/8.00 2.75/3.50 5.25/5,75 11. -11 1 M V 2 m '-3" 0.198 0.198 0.204 24 0.902 0.023 0.036 0 t4 O O 15" 2'•3" 2'-3" 2'•6" 12 3'•0" 3'•3" 3 i v O e 3 0 e 3.5 N5 @ 8" 3.2514.50 6.00/6.75 .3.25/3.50 6.00/8,75 12.00/13.25 Z W rA p Lu M Z PIPE SPAN WIDTH WIDTH SPAN MIN. HEIGHT DIMENSION BAAB•U BARS-V BARS-W TOTAL TOP BOTTOM •mX COND. ONE PIPE Z Z O e~ _ ^ co z M D A 8 C 0 H E F NO. LENGTH N0. LENGTH NO. LENGTH LBO. SLAB SLAB X[1 H C.Y. R.C. Z W a ' x 1B' 2'-6" 2'•6" 2'-e" 14 3'a" 3'-6" 3'•6" 0.227 0.227 0.222 30 1.065 0.033 0.049 w y r = w 4.0 W5 @ 8" 3.50/4.50 6.50/7.00 3.25/3.50 6.50/6.75 13 00/13.25 Q QQ 12" 3'-0" 2'-2" 2'-9" 0.235 0.772 0.015 0.026 T O 15" 3'-0" 2'-2" 3'-0" 0.235 0.829 0.023 0.088 o e ~ VI A - 24' 3'-0" 3'A" 3'•3" 15 3'•8" 4'-0' 4'•0" 0.288 0.298 0.258 40 1.434 0.069 0.085 x r L IL O PLAN 4.5 W5 j1-- 8" 4.0015 00 6.50/8.50 3.25/4.00 7.00/8.25 13.50/15.75 IL 30" 3'-6" W-8" 3'-9" 18 4'-3" 4'-6" 4'-6" 0.376 0.375 0.296 51 1.SSO 0.082 0.127 LL A 18" 3'•0" 2'-2" 3'-3" 0.235 0.8B7 0.033 0.049 Bx,I m op 24" 3'•0" 2'•2" 3'-9" 0.235 1.001 0.058 36" 4'-0" 4'-0" 4'•3" 20 4'•9" 5'-0" 5'-0' 0.483 0.483 0.333 64 2.341 0.132 0.178 5.0 #5 @ 8 4.50/500. 7.00/8.50 3.25/4.00. 7.25/9.25 13.75!15.75 T 42" 4'-6" 4'•6" 4'-e" 22 5'-3" 5'-6' 5'•6' 0.580 0.560 0.370 77 2.878 0.180 0.243 5.5 N5 @ B' 4.5015,00 7.50/8.50 3.25/4.00 7.25/9.25 14.00/15.75 30" 3'-0" 2'-2" 3'-4" 4'-3" 1'-2" 4'-0" 4 -6" 2 3'-9" 3 3'-9" 39 0.123 0.321 1.433 0.092 0.127 0 . LL el 4 38" 3'-0" 2'-2" W-10" 1'-S" V-0" 4 3 3'-9" 3 3'-9" 43 0.181 0.358 1.714 0.132 0.178 48" 5'-4" 5'•4" 5'-3" 26 6'-3" W-4" 8'•4" 0.743 0.743 0.407 111 3.823 0.235 0.317 5O R't5 @ B" 4.50/5.00 7.50!8.50 '.3.25/4.00 7.75/9.25 14.75(18.75 42 3'•0" 2'•2" 4'-6" 5 •3 i'•5" 3'•2" ! i'•B" 2 2'-11" 3 2'-11" 32 0.112 0.318 1.738 0.180 0.213 WHERE 42" TO 64" PIPE 19 USED e ° ° o•.o 48 3'-0" 2'-2" 5'-0" 5'•9" 2'-0" 3'-1 3 2'-11" 3 2'-11" 35 0.145 0.362 2.082 0.235 0.317^ " SECTION Y-Y 54" 5'•10" W-10" 5'-9" 28 8'-7" 6'•10" W-10" 0.865 0.855 0.444 125 4.283 0.297 0.401 DETAIL SHOWING METHOD SHEET 1,01P 1 EET 2 O643'-02'-2" 5'-7" 8'-8" 2'-7" 3'-2" 4 2'-10" 5 2'-11" 3 2'-11" 41 0.180 0.388 2.387 0.297 0.401 SHEET 2 OF 2 IIIIHIEET 1 OF 2 OF RISER CONSTRUCTION SHEET 1 OF 1 60" 8'-6" 8'•6" e'-3" 30 T-3" T-8" T-6" 1.042 1.042 0.481 145 5.090 0.367 0.496 SHEET 1 OF 1 SHEET 1 OF 1 SHEET 1 OF 1 88" " RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT PLAN PLAN SHEET 1 DF 2 838.80 40840.02 840.02 211 840.31 7'-1" 7'-1" W-9" 32 T-10" S'-1" 8'-1" 1.210 1.210 0.518 189 5.917 0.4" 0.589 840.31 838.80 838.80 PREPARED IN THE OFFICE OF: CLIENT: CLIENT: \\\N11~~IUp/ DATE: PROJECT: 1-28-04 ,ul / HORIZONTAL SCALE: \ .V KimleywHorn • pFESSlO N/A :Q~ CAL SCALE: REX HOSPITAL .0" MOB AND PARKING GARAGE _ N/A TITLE: •'1.W = DRAWN BY: TITLE: i iates REV. No.: REVISION: DATE DRAWN BY: CHECKED BY: Inc. and Assoc, 11 This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse V, EXPANSION (PHASE 1) JNG DESIGNED BY: of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. P.O. BOX 33068 - RALEKdH, NORTH CAROLINA 27636-3068 CONSTRUCTION DETAILS JNG CHECKED BY: ATTACHED REFERENCE FILES / ~N K• \ JOB NUMBER. SHEET NUMBER: Inc., 2004 PHONE: (919) 677-2000 FAX: (919) 677-2050 Copyright Kimley-Horn and Associates, SEAL: HKB 011274011 C-5 of 8