Loading...
HomeMy WebLinkAbout20041905 Ver 1_Approval Letter_20051129/~'F~W A TF,q ~ ~~,~""QG ~? Michael F. Easley, Governor ~ " r William G. Ross Jr., Secretary ~ ~ North Carolina Derartment of Environment and Natural Resources -~~ ' Alan W. Klimek, P.E. Director ' Y Division of Water Quality e~:t;=~_ ~. November 22, 2005 Watauga County DWQ Project No. 04-1905 SR 1127 (Shawnee Rd) Correction of APPROVAL of 401 Water Quality Certification (~; Mr. Mike Pettyjohn, P.E. ~ ~~LS ~~~ Division Engineer, Division 11 D N C Department of Transportation NO V 2 9 2005 Post Office Box 250 North Wilkesboro, North Carolina 28659 WETLA pS~DSTTE~~1~ Dear Mr. Pettyjohn: This letter is a correction to the Water Quality Certification issued for the referenced project. This letter should be attached to the existing WQC for the referenced project and is valid solely for the correction of the expiration date of the WQC. The expiration of the WQC is corrected as follows: 1. This Water Quality Certification will expire with the accompanying 404 permit issued by the US Army Corps of Engineers. This conditions supersedes Condition 19 of General Certification 3404 and Condition 12 of General Certification 3366 issued on March 21, 2005. 2. All the authorized activities and conditions of the certification associated with the original Water Quality Certification dated March 21, 2005 and all other corresponding modifications still apply except where superseded by this certification. Should your project change, you must notify the DWQ and submit a new application for a WQC modification. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2II .0506 (h) (6) and (7). If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Sue Homewood at 336-771-4600 extension 287 or at Sue.Homewood@ncmail.net. Sincerely, ~ c'r~~ Alan W. Klimek, P.E. cc: Wilmington District Corps of Engineers John Thomas, USACE Raleigh Field Office Heath Slaughter, Division 11, Division Environmental Officer DWQ Wetlands/401 Unit DWQ Winston Salem Regional Office DWQ Central Files North Carolina Division of Water Quality 585 Waughtown Street Internet: h2o.enr.state.nc.us Winston-Salem, NC 27107 Noe Carolina ~aturally Phone (336) 771-4600 Customer Service FAX (336) 771-4630 1-877-623-6748 An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper November 22, 2005 DWQ# 04-1905 correction Page 2 DWQ Project No.: County: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form maybe returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date