Loading...
HomeMy WebLinkAbout20041905 Ver 1_Approval Letter_20050406O~C W A TF,4 Michael F. Easley, Governor Q ~ ~ G ~ William G. Ross Jr., Secretary ~ ~ North Carolina Department of Environment and Natural Resources ~ ~ ~ ~ Alan W. Klimek, P.E. Director Division of Water Quality March 21, 2005 Watauga County DWQ Project No. 04-1905 SR 1127 (Shawnee Rd) APPROVAL of 401 Water Quality Certification Mr. Mike Pettyjohn, P.E. _ Division Engineer, Division 11 N C Department of Transportation Post Office Box 250 ,... North Wilkesboro, North Carolina 28659 Dear Mr. Pettyjohn: You have our approval, in accordance with the attached conditions and those listed below, to incur the following impacts in order to widen, pave and improve traffic safety on SR 1127 (Shawnee Rd) in Watauga County. • 1901inear feet of new piping impacts to eight (8) unnamed tributaries to the Shawneehaw Creek (110 feet of new pipe and 80 feet of rip-rap); Temporary dewatering impacts of approximately 0.003 (total) acres at stations 38+10 and 47+85. The project shall be constructed in accordance with your application dated November 17, 2004 (received November 29, 2004). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Nos. 3404 and 3366, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Numbers 14 and 33. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit, unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the Division of Water Quality (Division) and submit a new application. If the property is sold, the new owner must be given a copy of this approval letter and certifications, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification and any additional conditions listed below. 1. NCDOT will adhere to the requests made in the attached letter from the NCDENR Division of Parks and Recreation in order to reduce long-term impacts to the adjacent Beech Creek Bog. 2. Shawneehaw Creek and its tributaries are classified as Trout waters. NCDOT shall strictly adhere to the Best Management Practices for the Protection of Surface Waters (NCDOT August 2003) and Sedimentation and Erosion Control Guidelines for Sensitive Watersheds [15A NCAC 4B .0124 (a)-(e)] throughout design and construction of the project. 3. Instream work and land disturbance within the 25 foot wide buffer zone are prohibited during the brown and brook trout spawning season of October 15 through April 15 to the egg and fry stages of trout from off-site sedimentation during construction. Noy` Carolina ~tura!!y North Carolina Division of Water Quality S8S Waughtown Street Phone (336) 771-4600 Customer Service Internet: h2o.enr.state.nc.us Winston-Salem, NC 27107 FAX (336) 771-4630 1-877-623-6748 An Equal OpportunitylAffirmative Action Employer - 50% Recycledll0% Post Consumer Paper Mr. Mike Pettyjohn, P.E. March 21, 2005 DWQ# 04-1905 Page 2 4. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 5. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notice Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 6. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the completion of the project. 7. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 8. Stormwater should be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they maybe utilized for stormwater sheet flow. 9. Where practicable, culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater than 20% of their size to allow for aquatic life passage. Culverts that are 48-inch in diameter or larger should be buried at least 12 inches below the stream bottom to allow natural stream bottom material to become established in the culvert following installation and to provide aquatic life passage during periods of low flow. These measurements must be based on natural thalweg depths. This may require increasing the size of the culvert to meet flow conveyance requirements. If any of the existing pipes are perched, they shall be removed and replaced, and re-installed correctly, unless demonstrated that this is topographically unfeasible. All waters must flow through without freefalling or damming on either end of the culverts during low flow conditions, to maintain aquatic life and/or fish passage. 10. Due to extreme slopes present at stations 38+10, 40+40, and 47+85, these pipes will not be buried as indicated above, but an energy dissipater pads will be placed in the channel below the pipe outlet to reduce scour as appropriate. 11. The dimension, pattern and profile of the stream above and below any crossing should not be modified by widening the stream channel or reducing the depth of the stream. 12. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 13. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted when practical. If rip-rap is necessary, it must be limited to the stream bank below the high water mark, and vegetation must be used for stabilization above high water. Any rip-rap used must not interfere with aquatic life passage during low flow conditions. 14. If concrete is used, work must be accomplished so the wet concrete does not contact the stream water. This will lessen the chance of altering the stream's water chemistry and causing a fish kill. Mr. Mike Pettyjohn, P.E. March 21, 2005 DWQ# 04-1905 Page 3 15. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 16. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 17. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. 18. Temporary dewatering sites must be restored to preexisting conditions unless more natural geomorphic conditions can be provided. 19. All work shall be performed during low flow conditions. 20. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certification of Completion Form" to notify DWQ when all work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Sue Homewood at 336-771-4600 extension 287 or at Sue.Homewood@ncmail.net. Sincerely, ~~~ ~/ Alan W. Klimek, P.E. 6r Attachment cc: Wilmington District Corps of Engineers John Thomas, USACE Raleigh Field Office Heath Slaughter, Division 11, Division Environmental Officer ~Wetlandsl40l; U~" Winston Salem Regional Office Central Files Mr. Mike Pettyjohn, P.E. March 21, 2005 DWQ# 04-1905 Page 4 DWQ Project No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: County: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the,observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final Date: I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date