Loading...
HomeMy WebLinkAbout20190827 Ver 1_PCN Form Submission_20190619DWR IDIOM n of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20190827 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Garcy Ward:eads\gpward Information for Initial Review 1a. Name of project: Southdock Shoreline Stabilization Emergency 1a. Who is the Primary Contact?* Brian Doliber 1b. Primary Contact Email:* bcdoliber@ncdot.gov Date Submitted 6/19/2019 Nearest Body of Water Pamlico Sound Basin Tar -Pamlico Water Classification Tar Pamlico Version# * 1 Reviewing Office* Washington Regional Office - (252) 946-6481 1c. Primary Contact Phone:* (252)232-8025 Site Coordinates Latitude: Longitude: 35.191220-75.779207 FA. Processing Information u County (or Counties) where the project is located: Hyde Is this project a public transportation project?* r Yes r' No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: WBS#M 15401.1048012 1a. Type(s) of approval sought from the Corps: r Section 404 Permit (wetlands, streams and waters, Clean Water Act) W Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r' Regional General Permit (RGP) r' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 13 - Bank Stabilization NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: rJ 401 Water Quality Certification - Regular r' Non-404 Jurisdictional General Permit r' Individual Permit le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown 1j. Is the project located in a designated trout watershed? C Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: National Park Service 2b. Deed book and page no.: 2c. Responsible party: Sabrina Henry 2d. Address Street Address 1401 National Park Drive Address Line 2 City State / Rovince / Pagion Manteo NC Postal / Zip Code Country 27954 USA * r Yes r No r Yes r No 2e. Telephone Number: (252)475-9019 2g. Email Address:* sabrina—henry@nps.gov 3. Applicant Information (if different from owner) 3a. Name: Brian Doliber 3b. Business Name: North Carolina Department of Transportation Ferry Division 3c.Address Street Address 159 Lucinda Lane Address Line 2 CKY Powells Point Postal / Zip Code 27966 3d. Telephone Number: (252)232-8025 3f. Email Address:* bcdoliber@ncdot.gov 2f. Fax Number: State / Province / Pegion NC Country USA 3e. Fax Number: C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: (d appropriate) 1 c. Nearest municipality / town: Ocracoke 2. Project Identification 2a. Property Identification Number: 661 2c. Project Address Street Address 1380 Irvin Garrish Highway Address Line 2 DtY Ocracoke Postal / Zip Code 27960 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Pamlico Sound 3b. Water Resources Classification of nearest receiving water:* Tar Pamlico 3c. What river basin(s) is your project located in?* Tar -Pamlico 3d. Please provide the 12-digit HUC in which the project is located. 030201050306 4. Project Description and History 2b. Property size: 6000 State / Province / Pbgicn NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The land in the vicinity of this project is either: 1) Asphalt traffic lanes utilized for ferry traffic 2) Land behind the bulkhead for the ferry basin 3) Undisturbed land 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4c. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). SAW-2017-0047 Project History Upload 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) TOPO NC Green Island _20160621_TM_geo.pdf 16.24MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Ud- Soil-Hyde_County_North_Carolina.pdf 82.48KB 4f. List the total estimated acreage of all existing wetlands on the property: 4g. List the total estimated linear feet of all existing streams on the property: 975' 4h. Explain the purpose of the proposed project:* The purpose of the project is to stabilize the shoreline in order to protect the basin. A shifting channel to the north of the ferry basin and vehicle stacking lanes has caused significant erosion to take place on the north end of the island. This erosion has compromised the integrity of the ferry basin bulkhead and rendered the vehicle stacking lanes unusable while also creating a public safety issue. If the bulkhead were to fail it would impact the entire basin and significantly affect residents and visitors alike. By installing a newsheet pile wall on both the basin and sound sides of the point, the basin would be protected and the erosion along the stacking lane area would be mitigated. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The contractor will install 1000 feet of new sheet pile to protect the eroding area at the Ferry South Dock of Ocracoke Island (See attached maps) In order to begin installing the sheet pile the undisturbed land between the basin and the sound will need to be graded so that a crane can move along the point. Within the basin, new sheet pile wall will be installed 6" waterward of the old stabilization and then wrapped around to the north side running parallel to Hatteras Inlet within the Pamlico Sound. The basin and sound -side seawalls will then be anchored together with galvanized tie rods and reinforced concrete caps that serve as wales. The sound -side seawall will extend along the north side of the Ferry Terminal peninsula and partially extend around the north end of the vehicular stacking lanes. Upon completion of work the point between the seawalls will be filled with material from the adjacent dredge spoil site and regraded to match the eAsting dune elevations. As depicted in the drawings, the NCDOT Ferry Division would like to install temporary sandbags on the end of the sheet pile wall until the groin project is completed. The sandbags are needed to prevent any erosion from occurring from easterly winds. NCDOT proposes to use 3 different sizes of sandbags to fill in the end of the wall to prevent erosion; 2'X5'X15', XXT, and 4'X4' sizes would be utilized. The different sized sand bags will be used jointly to seal off the end as depicted in the drawings. The approAmate number of sand bags is 40, depending on the depths at the time of placement. The approAmate length at the top of the sandbag wall would be 50' with a width of 15', height of 14' and the bottom tapering with elevation. The sandbags would be placed in an area located partially within the inlet hazard area The sandbags would be placed in an area located partially within the inlet hazard area and therefore their placement is pending approval from the CRC. Equipment: Crane, Tug barge, Bulldozer, any other equipment deemed necessary by the contractor 4j. Please upload project drawings for the proposed project. 2019.05.22 Southdock Seawall Drawings (100 % Submittal).pdf 20.33MB South_Dock_5.29.19_hs_ortho.pdf 1.76MB South_Dock_6.12.19_hs.pdf 728.45KB Permit Drawings 6_13_19.pdf 273.8KB Southdock Project Special Provisions.pdf 208.47KB 5. Jurisdictional Determinations Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?* r: Yes r No Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r: Preliminary r Approved r Not Verified r Unknown r ITA Corps AID Number: SAW-2017-00407 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Bill Biddlecome Agency/Consultant Company: Other: C Unknown 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes O No 7b. If yes, explain. A second phase of this project will consist of the construction of 5 groins that protrude from the sheet pile wall in varying lengths. Preliminary work is being performed for this phase and no final details or drawings are available at this time. The only design in the sheet pile project that is associated with the groin project is the inclusion of groin connectors on the seawall. This was included because of the difficulties that would occur if the connectors were retrofitted at a later date. Please see Sheet S-9 on the Southdock Seawall Drawings (detail is lower left corner). The groin connector and one sheet of PZ-26 has to be installed now because the concrete cap is one continuous section (no expansion joints are to be placed). V we did not weld the groin connector now there would be no way to weld it once the sheet pile has been driven. The one sheet of PZ-26 is needed so it will clear the concrete cap. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): [ Wetlands r Streams -tributaries P Open Waters r Pond Construction 4. Open Water Impacts r Buffers 4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type :114e. Waterbody type 4f. Impact area NC-12 Sheet pile install P Pamlico Sound Bulkheads Sound 0.40 4g. Total temporary open water Impacts: 0.00 4g. Total open water impacts: 0.40 4g. Total permanent open water impacts: 0.40 4h. Comments: The primary purpose of this project is to protect the ferry basin. The sheet pile wall is also a)pected to help protect the area near the stacking lanes but the future groin project will address erosion in that area in more depth based on information currently being compiled through sampling, surveying and engineering. E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Project was designed to stabilize the point and protect the basin in the most pragmatic manner. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Fill will be placed in accordance with the IP (2017-00407) 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r Other SCM that removes minimum 30 % nitrogen R Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r- No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?* r Yes r- No NEPAor SEPAFinal Approval Letter Compliance Package_EmergencySheetpile_2019_0417. pdf 2. Violations (DWR Requirement) 2.01 MB 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Stabilization will be performed to ensure survival of the existing infrastructure/ferry basin; not increase development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r- Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r- No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r- No r Unknown What Federal Agency is involved? National Park Service 5e. Is this a DOT project located within Division's 1-8? r Yes r- No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Consultation with the NPS Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r- Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://www.fisheries. noaa.gov/resource/map/essential-fish-habitat-mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The NC DOT Environmental Analysis Unit was contacted regarding this project. The "No Survey Required" form is attached below. 7c. Historic or Prehistoric Information Upload Historic Architecture NoSurveyReq.pdf 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination?* https:Hnisc.fema.gov/portal/horm Miscellaneous Comments Miscellaneous attachments not previously requested. Signature * W By checking the box and signing below, I certify that: 560.7KB • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a 'transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Brian Doliber Signature A ,i'A Daft bi',t, Date 6/19/2019